ML20140E638

From kanterella
Jump to navigation Jump to search
Forwards Long-Term Corrosion Test Program of Nuclear-Steam Generator Tubing Samples from TMI-1 to Gpu Nuclear, Second Interim Rept
ML20140E638
Person / Time
Site: Crane 
Issue date: 01/04/1985
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20140E643 List:
References
5211-85-2004, NUDOCS 8501110216
Download: ML20140E638 (1)


Text

r w

e g

GPU Nuclear Corporation gggf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84-2386 Writer's Direct Dial Number:

E N2SS-85-200 Office of Nuclear Reactor Regulation L

Attn:

J. F. Stolz, Chief Operating Reactor Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 TMI-1 Steam Generators - Long Term Corrosion Test Program Enclosed for your information is the Second Interim Report of the TMI-1 Steam Generator Long Term Corrosion Test Program, dated May 1984. This is a Westinghouse report to GPUN, received in November 1984, which represents work done through May 1984. The information and conclusions in this report are consistent with all informagion and conclusions provided to you previously. A final report is also being prepared by Westinghouse, which will be provided to you when available.

Sincerely, P. D.

kill Director, TMI-1 MJG:che Enclosure cc:

H. Silver C. McCracken

\\

8501110216 850104 Ds j

PDR ADOCK 05000289 p

PDR q

V' ty GPU Nuclear Corporat!on is a subsidiary of the General Public Utilities Corporation

-