ML20140E475

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900888/84-01 on 841112-15 & Notices of Nonconformance & Violation
ML20140E475
Person / Time
Issue date: 01/09/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Windt W
TEXAS BOLT CO.
Shared Package
ML20140E478 List:
References
REF-QA-99900888 NUDOCS 8501110048
Download: ML20140E475 (2)


Text

c4 o g UNITED STATES

! n NUCLEAR REGULATORY COMMISSION h WASHINGTON, D. C. 20555

%, . . . . . g January 9, 1985 Docket No. 99900888/84-01 Texas Bolt Company ATTN: Mr. W. E. Windt QC/QA Manager Post Office Box 1211 Houston, Texas 77001 Gentlemen:

This refers to the inspection conducted by Mr. James T. Conway of this office on November 12-15, 1984, of your facility at Houston, Texas, and~to the discussions of our findings with Mr. W. M. Dickson and members of your staff at the conclusion of the inspection.

This inspection was made as a result of the 10 CFR Part 21 report from Public Service of Colorado pertaining to cracks in threaded rods .for use in reinforcement of safety related masonry block walls at the Fort St. Vrain Nuclear Generating Station. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examin-ation of procedures and representative records, interviews with personnel, and observations by the inspector. -

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

The enclosed Notice of Violation is sent to you pursuant to the provisions of

-Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or

.will be taken to prevent recurrence; and (3) the dates your corrective actions and p;eventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.

Ih N NS PR9CICS5*ING 111g8 El1V original document riot available to MID

'99 PDR c.,tiri.e 37atriy e of1 set O

Texas Bolt Company ?anuary 9, 1985 The. responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paper-work Reduction Act of 1980, PL 96-511. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, ORIGINAL SIGNED BY:

GARY G. ZECH Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Safeguards, and Inspection Programs Office of Inspection and Enforcement

Enclosures:

1.. Appendix A-Notice of Violation

2. ~ Appendix B-Notice of Nonconformance
3. -Appendix C-Inspection Report No. 99900888/84-01
4. Appendix D-Inspection Data Sheets (10 pages)

DISTRIBUTION:

DMB:IE:09 VPB Reading (2)

JTaylor JStone EMerschoff JConway VP IP SC/VPB:DQASIP .BC/VPB:DQASIP D/DIR QASIP JCon sam- EMerschoff GGZech /

.12/ 4 12/ci/84 g/q /Ma[ -

JGPartlow{

/g /AWfg