ML20140E354

From kanterella
Jump to navigation Jump to search
Responds to Requesting Extension of Comment Period from 30 to 60 Days on Proposed Suppl to NRC Bulletin 96-01.NRC Does Not Wish to Extend Official Comment Period
ML20140E354
Person / Time
Issue date: 06/05/1997
From: Slosson M
NRC (Affiliation Not Assigned)
To: Cloninger T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20140E357 List:
References
PROJECT-694 IEB-96-001, IEB-96-1, NUDOCS 9706120027
Download: ML20140E354 (3)


Text

. _ _

I June 5, 1997 l

Mr. T.H. Cloninger, Chairman l

Executive Advisory Committee l

Westinghouse Owners Group South Texas Project l

P.O. Box 289 Wadsworth, TX 77483

SUBJECT:

RESPONSE TO MAY 23, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Cloninger:

I am responding to your letter of May 23, 1997, to Mr. Leonard J. Callan, Executive Director for Operations, Nuclear Regulatory Commission, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19,1997) on the proposed supplement to NRC Bulletin 96-01, " Control Rod Insertion Problems." Although there have been some changes, in general, the proposed Bulletin Supplement contains information i

that has been presented and discussed with the industry for several months.

Therefore, we do not wish to extend the official comment period. However, if we receive your comments within 60 days (by July 19,1997) we will consider them to the extent possible.

Sincerely, Original Signed By:

Marylee M. Slosson, Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 694 cc: Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 f

P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 I

f IM] [f

. DISTRIBUTION:

I See next page DOCUMENT NAME:

G:\\ CMC 1\\BL* SIR Previous Concurrences I

0FFICE PGEB PGEB:BC SRXB:(A)BC DSSA:D bRPM:(A)D NAME CCraihN DHatthews*

JLyons*

GHolahan*

MSlossob DATE tr/5/97 6/4/97 6/4/97 6/5/97 I/6/97 f

0FFICIAL RECORD COPY l

11.00b0

,c; 7 y g NRC fB.E CENTER COPY 9706120027gg0S PDR ORG PDR

- - - -. - -. -... -. -..... ~. -..

. -.. _ ~

/*%

0

-t UNITED STATES j

,j NUCLEAR REGULATORY COMMISSION i

o WASHINGTON, D.C. 206t&0001 June 5,1997 l

Mr. T.H. Cloninger, Chairman Executive Advisory Committee Westinghouse Owners Group South Texas Project P.O. Box 289 Wadsworth, TX 77483 l

SUBJECT:

RESPONSE TO MAY 23, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Cloninger:

I am responding to your letter of May 23, 1997, to Mr. Leonard J. Callan, Executive Director for Operations, Nuclear Regulatory Commission, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19,1997) on the proposed supplement to NRC Bulletin 96-01,

" Control Rod Insertion Problems." Although there have been some chcnges, in general, the proposed Bulletin Supplement contains information that has been presented and discussed with the industry for several months. Therefore, we do not wish to extend the official comment period. However, if we receive -

your comments within 60 days (by July 19,1997) we will consider them to the extent possible.

Sincerely,

"/ % w 4 t w Maryle M. Slosson, Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation l

Project No. 694 cc: Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 i

I' l

l l

DISTRIBUTION:

Green Ticket 970405 Dated June 5. 1997 Central File-(GT970405)~(w/ incoming)-

Project File (GT970405) (w/ incoming) l PUBLIC (GT970405) (w/ incoming) l PGEB R/F (GT970405) (w/ incoming)

NRR Mailroom (GT970405) (w/ incoming)

JCallan EJordan l

HThompson i

PNorry JBlaha SCollins SBurns, OGC TMartin RZimmerman l

BSheron MSlosson DMatthews GHolahan CCraig JLyons MChatterton BBurton l

l mm EDO Principal Correspondence Control FROM:

DUE:

/

/

EDO CONTROL: G970405 DOC DT: 05/23/97 FINAL REPLY:

T. H. Cloninger WO tinghouse Owners Group Collan, EDO FOR SIGNATURE OF :

DESC:

ROUTING:

REQUEST FOR EXTENSION OF COMMENT PERIOD (PROPOSED Callan NRC BULEETIN 96-01, SUPPLEMENT 1; CONTROL ROD Jordan INSERTION PROBLEMS)

Thompson Norry Blaha Burns DATE: 05/30/97 ASSIGNED TO:

CONTACT:

NRR

_Qs a n, i n u AUllUl1 SPEC L INSTRUCTIONS OR REMARKS:

Fc r Appropriate Action.

DUE TO NRR DIRECTOR'S OFFICE

(~/O H NRR RECEIVED June 3, 1997 b r rvi l

h,d p,[

NRR ACTION DRPM, Slosson / Flanders ~

NRR ROUTING Miraglia Martin Zimmerman Mail room.

l

.