ML20140E181

From kanterella
Jump to navigation Jump to search
Responds to Requesting Extension of Comment Period from 30 to 60 Days on Proposed Suppl to NRC Bulletin 96-001.NRC Does Not Wish to Extend Official Comment Period
ML20140E181
Person / Time
Issue date: 06/05/1997
From: Slosson M
NRC (Affiliation Not Assigned)
To: Sepp H
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
IEB-96-001, IEB-96-1, NUDOCS 9706110263
Download: ML20140E181 (2)


Text

f June 5, 1997 Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation Mail Stop ECE 4-07A P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355

SUBJECT:

RESPONSE TO MAY 28, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Sepp:

I am responding to your letter of May 28, 1997, to Ms. Claudia M. Craig, Senior Project Manager, Division of Reactor Program Management, Office of Nuclear Reactor Regulation, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19, 1997) on the proposed supplement to NRC Bulletin 96-01, " Control Rod Insertion Problems."

Although there have been some changes, in general, the proposed Bulletin Supplement contains information that has been presented and discussed with the industry for several months. Therefore, we do not wish to extend the official comment period. However, if we receive your comments within 60 days (by July 19, 1997) we will consider them to the extent possible.

Sincerely, Original Signed by:

Marylee M. Slosson, Acting Director Division of 3 actor Program Management Office of Nuclear Reactor Regulation DISTRIBUTION:

PUBLIC

' Central Files PGEB R/F OGC, 15 B 18 CCraig MChatterton JLyons DMatthews GHolahan SCollins BSheron MSlosson RArchitzel BBurton DOCUMENT NAME:

G:\\CMCl\\BL*SH Previous Concurrences t

N-pO3 0 0FFICE PGEBI% in PGEB:BC SRXB:(A)BC DSSA:D DRPM:(A)p, NAME CCrahg~:sb DMatthews*

JLyons*

GHol ahan*

MSlossob @

~

DATE In /'i~/97 6/4/97 6/4/97 6/5/97 (c / (f /97 Wo b'N 0FFICIAL RECORD COPY x

9706110263 970605 9 7-#5' g y

SR TOPRP EMVW D R-%

_ _ ~.

I pt@ CIC

[

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055Hm01

\\.,, +,/

1 l

June 5, 1997 4

Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation Mail Stop ECE 4-07A P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355

SUBJECT:

RESPONSE TO MAY 28, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Sepp:

i I am' responding to your letter of May 28, 1997, to Ms. Claudia M. Craig, Senior Project Manager, Division of Reactor Program Management, Office of Nuclear Reactor Regulation, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19, 1997) on the proposed supplement to NRC bulletin 96-01, " Control Rod Insertion Problems."

Although there have been some changes, in general, the proposed Bulletin Supplement contains information that has been presented and discussed with the industry for several months. Therefore, we do not wish to extend the official comment period. However, if we receive your comments within 60 days (by July 19, 1997) we will consider them to the extent possible.

Sincerely, rm M

<ptU LG u Marylee

. Slosson, Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation I

i