ML20140E113

From kanterella
Jump to navigation Jump to search
Responds to Requesting Extension of Comment Period from 30 to 60 Days on Proposed Suppl to NRC Bulletin 96-001.NRC Does Not Wish to Extend Official Comment Period
ML20140E113
Person / Time
Issue date: 06/05/1997
From: Slosson M
NRC (Affiliation Not Assigned)
To: Modeen D
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
PROJECT-689 IEB-96-001, IEB-96-1, NUDOCS 9706110246
Download: ML20140E113 (3)


Text

,

3 June 5, 1997 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

RESPONSE TO MAY 28, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Modeen:

I am responding to your letter of May 28, 1997, to Mr. Gary Holahan, Director, Division of Systems Safety and Analysis, Office of Nuclear Reactor Regulation, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19, 1997) on the proposed supplement to NRC Bulletin 96-01, " Control Rod Insertion Problems." Although there have been some changes, in general, the proposed Bulletin Supplement contains information that has been presented and discussed with the industry for several months. Therefore, we do not wish to extend the official comment period. However, if we receive your comments within 60 days (by July 19, 1997) we will consider them to the extent possible.

Sincerely, ,

V [ O p M M 0riginal S ed Marylee M." Slosson, Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation ,

t i Project No. 689 ppd 3 O cc: See next page DISTRIBUTION: oc PUBLIC Central Files PGEB R/F V ROI la O (

OGC, 15 B 18 SMagruder MChatterton JLyons DMatthews GHolahan SCollins BSheron MSlosson FAkstulewicz Project File BBurton DOCUMENT NAME: G:\CMCl\BL.LTR *See Previous Concurrences 0FFICE PGEB PGEB:BC SRXB:(A)BC DSSA:D DRPM:(A)D J'ME SMagrudeP DMatthews* a (ygs* GHolahan* MSlosson DATE G/ % /97 6/4/97 6/4/97 6/5/97 4/h/97 0FFICIAL RECORD COPY 9706110246 970605 PDR REVGP ERGNUMRC

/e 7-#5' 66 oss, Prof

p Rio

[ k UNITED STATES j

o

) I j

'y NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2065M001 June 5, 1997

%[* **+

  • W' / )

Mr. David Modeen, Director Engineering ,

Nuclear Energy Institute {

Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

RESPONSE TO MAY 28, 1997 LETTER REQUESTING COMMENT PERIOD EXTENSION

Dear Mr. Modeen:

I am responding to your letter of May 28, 1997, to Mr. Gary Holahan, Director, Division of Systems Safety and Analysis, Office of Nuclear Reactor Regulation, in which you requested an extension of the comment period from 30 days to 60 days (June 19, 1997 to July 19, 1997) on the proposed supplement to NRC Bulletin 96-01, " Control Rod Insertion Problems." Although there have been some changes, in general, the proposed Bulletin Supplement contains information that has been presented and discussed with the industry for several months. Therefore, we do not wish to extend the official comment period. However, if we receive your comments within 60 days (by July 19, 1997) we will consider them to the extent possible.

Sincerely,

'&AK w Marylee M. Slosson, Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

- ~ . . _ .- _ . . - . . _ - .. -

F l

NEI Project No. 689 cc: Mr. Ralph Beedle Mr. Thomas Tipton, Vice President Senior Vice President Operations and Chief Huclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 Suite 400 1776 I Street, NW 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Jim Davis, Director Programs Operations Nuclear Energy Institute Nuclear Energy Institute Suitt 400 Suite 400 1776 I Street, NW 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Ms. Lynnette Hendricks, Director Plant Support Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrar.gelo, Director Licensing Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Ronald Simard, Director Advanced Technology Nuclear Energy Institute l Suite 400 l 1776 I Street, NW I Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 i