o
e[#
o
UNITED STATES
,
g
,
NUCLEAR REGULATORY COMMISSION
o
h
WASHINGTON, D. C. 20555
o\\....,*
November 13, 1985
Docket No. 99900930/85-01
Research Dynamics Incorporated
ATTN: Dr. J. M. Anno
President
637 Redna Terrace, Unit 1
Cincinnati, Ohio 45215
Gentlemen:
This refers to the inspection conducted by Mr. S. D. Alexander of this office
on July 29-August 1,1985, of your facilities at Cincinnati, Ohio and to the
discussions of our findings with Ms. Linda Rieser and other members of
your staff a't the conclusion of the inspection.
The purpose of this inspection was to review the qualification program on an
NDT International acoustic flow sensor for the safety relief valve status
indication system (SRVSIS) at South Texas Project Units 1 and 2 and to
review your corrective actions in response to the violations and nonconformances
identified in the previous inspection. Areas examined during the inspection and
our findings are discussed in the enclosed report. Within these areas, the
inspection consisted of an examina. tion of procedures and representative records,
interviews with personnel, and observations by the inspector.
During the inspection, it was found that the implementation of your QA program
failed to meet certain NRC requirements. Specifically, there was one instance
in which your instrument calibration procedures did not contain acceptance
criteria. The inspection findings and references to the pertinent requirements
are identified in the enclosures to this letter.
Please provide us within 30 days from the date of this letter a written
statement containing:
(1) a description of steps that have been or will be
taken to correct these items; (2) a description of steps that have been or
will be taken to prevent recurrence; and (3) the dates your corrective actions
and preventive measures were or will be completed.
Consideration may be given
to extending your response time for good cause shown.
The responses requested by this letter are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
06o203o141 h h DY
OA999
ppR
4
9990o9:30
$go
'
Research Dynamics Incorporated
-2-
November 13, 1985
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
OR$NAL SNMED BY:
PsARY G ZECH
Gary G. Zech, Chief
Vendor Program Branch
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Notice of Nonconformance
2.
Appendix B-Inspection Report 99900930/85-01
3.
Appendix C-Inspection Data Sheets (6 pages)
DISTRIBUTION:
,,AMB :IE:09
VPB Reading
DQAVT Reading
RVollmer
JTCollins
JStone
UPotapovs
SAlexander
MJacobus, SNL
JThomas, DPC
5
,
g
t.
.
'
4
h
b
/
'
VPB:DQAVT
SC/VPB:DQAVT
- DQAVT
D/DTR:DQAVT
i
SAlexander: sam
UPotapovs
GGZec)
BKGr,ij/85
nes
11/\\v
l
11/03/85
11/py85
11/\\V/85
._.
..
___
.
.
a.
._
_
__