ML20140D499
| ML20140D499 | |
| Person / Time | |
|---|---|
| Issue date: | 04/18/1997 |
| From: | Ross D Committee To Review Generic Requirements |
| To: | Knapp M, Miraglia F, Jerome Murphy NRC (Affiliation Not Assigned), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| References | |
| NUDOCS 9704230277 | |
| Download: ML20140D499 (2) | |
Text
- _
4 1
>S8'ag k
UNITED STATES p
j NUCLEAR REGULATORY COMMIS810N WASHINGTON, D.C. 20e86-0001
% * * * *
- so i
i April 18,-1997 i
a MEMORANDUM TO:
Frank J. Miraglia, Jr., NRR ~
L Joseph A. Murphy, RES i-Malcolm R. Knapp, NMSS Dennis C. Dambly, OGC I
James E. Dyer, RIV 5
FROM:
'Denwood F. Ross, Jr., Chairman s
Committee to Review Generic Requirement l
I
SUBJECT:
AGENDA FOR CRGR MEETING NO. 304 4
i i.
The Committee to Review Generic Requirements (CRGR) will meet on Tuesday, l
i April 22,1997 in Room 1-F7/9, OWFN. The agenda is as follows:
f 1
l 9:00'a.m. - 10:30 a.m.-
G. Holahan (NRR) and B. Sheron (NRR) will present for the CRGR review and endorsement the revised generic letter
'l j'
dealing with degradation of the emergency core cooling
]
system and the coritainment spray system due to foreign i
F materialinside containment and construction deficiencies (An f
earlier version of this generic letter was reviewed by the CRGR
[
on February 25,1997 at the meeting No. 302). No formal i
CRGR review request has been received. / 7 electronic version
[
of the draft revised generic letter was forwarded to the j
members on April 17,1997.-
10:30 a.m. - 12:00 noon G. Holahan (NRR) will present for the CRGR review and
}
endorsement Supplement 1 to Bulletin 96-01, " Control Rod insertion Problems." (CRGR ltem No.157 was forwarded to the members on April 9,1997.)
i If a CRGR member cannot attend the meeting, it is his responsibility to assure that an 1
alternate, who is approved by the CRGR Chairman, attends the meeting. Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is, provided to the Committee (CRGR Charter - IV.8), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRGR contact (Raji Tripathi, 415-7584) and others involved with th,e presentation. Division Directors or higher management should attend meetings addressing d,
DP3 Vi agenda items under the purview.
cc: Next page CE6/L ym-7 9704230277 970418 i
PDR REVOP NROCROR p y - fy' y OW-g NRC Rt.E CENTER COMQ DU NEETING304 PDR reuce
cc:
Commission (5)
SECY L. Callan, EDO J. Lieberman, OE E. Halman, ADM J. Larkins, ACRS K. Cyr, OGC H. Bell, OlG D. Morrison, RES H. Miller, RI L. Reyes, Ril A.B. Beach, Rlli J. Dyer, RIV A. Thadani, NRR G. Holahan, NRR Distribution:
Central Files PDR (NRC/CRGR)
CRGR R/F CRGR S/F EJordan Dross RTripathi JMitchell
]
JJohnson, OCM/SJ RJones MChatterton JShapaker WBurton DISK / DOCUMENT NAME: S:\\CRGR\\ AGENDA.304 To r:ctive a copy of this document, indicate in the box:' 'C' = Copy w/o attachment, "E" - Copy w/ attachment, "N" = No copy j
OFC CRGR OD:AE C
C RTripathik DFhs NAME h1997 DATE 4/g/1997 4
O l
a
.