Notice of Violation from Insp on 851216-20
ML20140D427
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/17/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20140D426 List:
References
50-424-85-60, 50-425-85-40, NUDOCS 8601290307
Download: ML20140D427 (2)


Text

,

ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Company Docket Nos. 50-424 and 50-425 Vogtle Units 1 and 2 License Nos. CPPR-108 and CPPR-109 The following violation was identified during an inspection conducted on December 16-20, 1986. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Title 10 Code of Federal Regulations Part 50, Appendix B, Criterion V, as implemented by the Final Safety Analysis Report (FSAR), Chapter Section 17.1.5, requires activities affecting quality be accomplished in accordance with documented procedures and drawings, and that those documented procedures and drawings contain appropriate acceptance criteria. Bechtel drawing M0lG-S400, Rev.1, identified as the applicable fabrication drawing for the containment stack support platform specifies that Pc.A be connected to Pc.C with a complete-penetration, double-bevel, groove weld. Welding Procedure specification 27-III/I-8-0B-12, Revision 4/14/83, identified as the applicable procedure for the fabrication for support V2-122A-174-H642, Rev. 0, requires that the Welding Current for 3/32-inch diameter welding filler material, be 100 to 150 amps.

Contrary to the above, welding was not accomplished in accordance with documented procedures and drawings, containing appropriate acceptance criteria in that the following was noted:

- Pc.A was connected to Pc.C on drawing M0lG-S400 with a complete penetration flair-bevel weld. The fit-up inspectim was made and accepted by a Georgia Power Company Quality Contrnl inspector.

The Weld Symbol (acceptance standard) (double bevel groove weld) on Drawing M0IG-S400 is inappropriate because: it is incorrect and cannot be fit-up, and in addition, welding cannot be accomplished on the inside of Pc.C as required by that symbol .

The welder of record for support V2-122A-174-H642, Rev. 0, had his welding machine set at 35 amps and was about to start welding.

This is a Severity Level V violation (Supplement II).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violation; and (5) the date when full compliance will be achieved.