ML20140D320
| ML20140D320 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/02/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20140D327 | List: |
| References | |
| 50-341-97-02, 50-341-97-2, NUDOCS 9706100344 | |
| Download: ML20140D320 (7) | |
See also: IR 05000341/1997002
Text
- , . -
. ~ . - - - ~
.
- . - -
. . - - - - - _ _ _ . _ - . - -
.,
. .
. ,
-
_
>c
1
' June 2, 1997
1
!
EA 97-201
I
Mr. D. R. Gipson
!
Senior Vice President
!
Nuclear Generation
!
The Detroit Edison Company
. 6400 North Dixie Highway
Newport, MI 48166
i
- SUBJECT:
NRC INSPECTION REPORT NO. 50-341/97002(DRP) AND NOTICE OF '
]
VIOLATION '
l
Dear Mr. Gipson:
,I
t
.
l
' On March 19,1997, the NRC completed an inspection at your Fermi 2 reactor facility.
!
'
The enclosed report presents the results of that inspection.
!
1
During this.6-week inspection period, engineering continued to identify design problems.
l
j
This continued a trend of broad, detailed investigations by engineering. In contrast,
{
L
inspectors continued to identify deficiencies in the performance of maintenance activities.
i
Also, the inspector identified several security issues involving lack of attention to detail.
i
!
Based on the results of this' inspection, the NRC has determined that one violation of NRC
l
,
requirements occurred. - The violation is cited in the enclosed Notice of Violation (Notice)
I
i
and the circumstances surrounding it are described in detail in the subject inspection
l
report. The violation is of concern because you did not have procedures to operate
)
equipment used to supply offsite power to the plant. This fact was identified as a
contributing factor in the motorizing of your main unit generator in January 1996, but your '
j
corrective actions did not include prompt action to mitigate that deficiency.
!
I
!
' Also in this report are the Notices of Violation for inspection findings reported in inspection
.j
!
Report No. 50-341/96201, conducted in August and September,1996. The violations
proposed by NRC Special Inspections Branch have been reviewed by Region Ill. Based on
the results of that inspection, the NRC has determined that two violations of NRC
requirements occurred. These violations are cited in the enclosed Notice of Violation
i
'~
-(Notice) and the circumstances surrounding them are described in detail in Inspection
'
Report No. 50-341/96201. The first violation is of concern because instructions contained
-r
incorrect acceptance criteria for determining operability of safety systems. The second
violation is of_ concern because your staff was not raising issues to managements'
i
[
attention as directed in your procedures.
1
You are required to respond to this letter and should follow the instructions specified in the
!
enclosed Notice when preparing your response. The NRC will use your response, in part,
I
to determine whether further enforcement action is necessary to ensure compliance with
(
' <
regulatory requirements.
\\
M*
85.5.55
- .
,nnn"
9706100344 970602
P
-
ADOCK 05000341
V
'O
~PDR
Q
1
l^
.
i
.... _ _ ._ _ . _ . _ .
m._
_ _ _ _ . _ . _
. . _ _ . . _ . _ _ - .
_ _ . . _ _ _ _ . _ _ _ _ . ~
.
j
D. R. Gipson
+2-
In addition, two apparent violations were identified and ere being considered for escalated
enforcement action in accordance with the " General Statement of Policy and Procedure for
NRC Enforcement Actions" (Enforcement Policy), NUREG-1600. The two apparent
violations are of concern because your staff did not recognize the significance of a non-
i
conservative error introduced by your calibration practices of primary containment accident
i
monitoring instruments. In addition, your staff failed to take timely and appropriate
1
corrective actions. As a result, you exceeded technical specifications requirements on
i
several occasions and you could have potentially been outside the design basis for primary
containment during a design basis accident. Please be advised that the number and
characterization of apparent violations described in the enclosed inspection report may
l
change as a result of further NRC review.
j
l
You will be advised by separate correspondence of the results of our deliberations on the
apparent violations. No response regarding these apparent violations is required at this
time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of. Practice," a copy of this letter
and its enclosure (s), and your response will be placed in the NRC Public Document Room
'
(PDR).
!
Sincerely,
/s/ R. N. Gardner for
Geoffrey E. Grant, Director
Division of Reactor Projects
j
Docket Nos: 50-341
License Nos: NPF-43
1
l
Enclosures:
!
1.
Inspection Report 50-341/97002
i
2.
3.
Licensee slides from February 18,1996, Predecisional Enforcement
Conference
_
(See attached distribution)
Document: R:\\lnsprpts\\ powers \\ferm\\fer97002.drp
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlli
Rlll
b
Rill
Rlll
Rlli
Rlil
NAME
DuPont:
Jorce
Claytop
Creed y a
Loughysd-
GardneA
dp /
@j
S1.1; S1.2
Grant
i
.
DATE
05/ /97
05&$97
05/ /97
5/ /97
05/ /97
05/ /97
l
OFFICIAL RECO 3D COPY
,
- - . - - - -
-
..-.- - , , .
.-
--
- . _
_ _ . . _ . _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ . _ _ . _ . _ - _ _ . _ . _ - _ . _ . . _
t
D. R. Gipson
-2-
In addition, two apparent violations were identified and are being considered for escalated
enforcement action in accordance with the " General Statement of Policy and Procedure for
]
NRC Enforcement Actions" (Enforcement Policy), NUREG-1600. _ The two apperant
violations are of concern because yout staff did not recognize the significance of a non-
conservative error introduced by your calibration practices of primary containment accident
monitoring instruments. In addition, your staff failed to take timely and appropriate
corrective actions. As a result, you exceeded technical specifications requirements on
several occasions and you could have potentially been outside the design basis for primary
)
i
l
containment during a design basis accident.
1
-
You will be advised by separate correspondence of the results of our deliberations on the
apparent violations. No response regarding these apparent violations is required at this
time.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter-
and its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
Sincerely,
l
l
l
i
'
Geoffrey E. Grant, Director
!
Division of Reactor Projects
I
Docket Nos: 50-341
!
License Nos: NPF-43
!
!
'
Enclosures:
1.
Inspection Report 50-341/97002
2.
3.
Licensee slides from February 18,1996, Pre-decisional Enforcement
Conference
(See attached distribution)
(See attached concurrence)
. Document: R:\\lnsprpts\\ powers \\ferm\\fer97002.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
'
OFFICE
Rill
Rlli
Rill
Rlli
Rlli
Rill
M
NAME
DuPont:
Jordan
Cla
g 4
Creed - para
Lougheed
Gardner/
l
dp
%
A
S1.1; S1.2
Grant N[
!
'
-
(
DATE
05/ /97
05/ /97
05 //97
5/ /97
05/ /97
Oh//97
'
!
OFFICIAL RECO 4D COPY
!
'
_ _ - _ , _ .
.
.
-
,
-
.. --
.
..
-
-
1
.
l
D. R. Gipson
-3-
,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50-341
License Nos: NPF-43
Enclosures:
1.
Inspection Report 50-341/97002
l
2.
l
3.
Licensee slides from February 18,1996, Pre-decisional Enforcement
Conference
cc w/ encl:
N. Petersco,
Supervir,ct of Compliance
P. A. Marquardt, Corporate
Legal Department
,
l
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
i
Public Health
Monroe County, Emergency
j
Management Division
Docket File w/ encl
Project Manager, NRR w/enci
,
l
PUBLIC IE-01 w/ encl
DRP w/enci
!
OC/LFDCB w/ encl
Rlll PRR w/enci
!
SRI Fermi w/ encl
CAA't w/enci (E-mail)
A. B. Beach, w/ encl
Rlil Enf Coordinator w/ encl
Deputy RA, w/ encl
DRS (2) w/enci
TSS w/enci
(See attached concurrence)
i
l
Document: R:\\lnsprpts\\ powers \\ferm\\fer97002.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci
'
"E" = Copy with attach /enci "N" = No copy
[
f
l
OFFICE
Rlli
Rlli
Rill
Rill
Rlli
Rlli
NAME
DuPont:
J
Clayton
Creed - para
Lougheed
Gardner/
dp
j
S1.1: St.2
Grant
l
DATE
05/ /97
0541/97
05/ /97
5/ /97
05/ /97
05/ /97
OFFICIAL RECO 4D COPY
,
.
_
l
. _ . . _ . . . _ _ . _ . . _ _ _ _ _ . . - . _ _ . _ . . . _
. . _ . . _ . . . . _ .
p
.
i
D. R. Gipson
-3-
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure (s), and your response will be placed in the NRC Public Document Room
l
(PDR).
j
Sincerely,
i
1
?r.M7-'c ::::, Director
Division of Reactor Projects
i
Docket Nos: 50-341
l
License Nos: NPF-43
-
Enclosures:
1.
Inspection Report 50-341/97002
4
2.
)
3.
' Licensee slides from February 18,1996, Pre-decisional Enforcement
j
Conference
cc w/ench
N. Peterson,
Supervisor of Compliance
.
P. A. Marquardt, Corporate
,
i
Legal Department
!
James R. Padgett, Michigan Public
}
Service Commission
i
Michigan Department of
Public Health
l
Monroe County, Emergency
Management Division
i
Docket File w/enct
Project Manager, NRR w/ encl
i
PUBLIC IE-01 w/enci
DRP w/ encl
i
OC/LFDCB w/ encl
Rill PRR w/ encl
j
SRI Fermi w/ encl
CAA1 w/enci(E-mail)
i
A. B. Beach, w/ encl
Rlli Enf Coordinator w/enci
'
Deputy RA, w/ encl
DRS (2) w/enci
i
TSS w/enci
i
(See attached concurrence)
Document: R:\\insprpts\\ powers \\ferm\\per97002.drp
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci
.
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlli
Rlli
Rlli
Rlli
d
Rlll
h
Rill
/g@/ Crg[ para
NAME
DuPog
-
Jordd
/
Lo
eed
C
Cl
,
dp@\\
'
%
N
S1. ],JS1.2
'( o
Grebe 09 A
i
DATE
05/(/97
05d. /97
05/ /97
5[Y97
05/ 997
05/ /97
0
_
OFFICIAL RECO 4D COPY
I
1
,
-
-.
--.
. -
.
.
.
- _ - -
l
L
D. R. Gipson
-3-
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
Sincerely,
i
James L. Caldwell, Director
Division of Reactor Projects
Docket Nos: 50-341
License Nos: NPF-43
Enclosures:
1.
Inspection Report 50-341/97002
2.
3.
Licensee slides from February 18,1996, Pre-decisional Enforcement
Conference
cc w/ encl:
N. Peterson,
Supervisor of Compliance
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Monroe County, Emergency
Management Division
Docket File w/enci
Project Manager, NRR w/enci
PUBLIC IE-01 w/enci
DRP w/ encl
OC/LFDCB w/ encl
Rlli PRR w/ encl
SRI Fermi w/enci
CAA1 w/enci(E-mail)
A. B. Beach, w/ encl
Rlli Enf Coordinator w/ encl
Deputy RA, w/enci
DRS (2) w/ encl
TSS w/enci
Document: R:\\lnsprpts\\ powers \\ferm\\per97002.dtp ~
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlli
Rlli
Rlli
Rill
NAME
DuPont:dp
Jordan
Lougheed (
Caldwell/Grobe
DATE
05/ /97
05/ /97
05b#97
05/ /97
g OFFICIAL RECORD COPY
hL
sis
( M-
i
'
3n
-
-- -
--
.
.-. . - . _ -
. - .-.. - . . ~ . . - . = -
. - .- -. .. - . .- .
. . _ .
_ ..
D. R. Gipson -
-3-
(Distribution)
cc w/ encl:
N. Peterson,
Supervisor of Compliance
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Monroe County, Emergency
Management Division
Docket File w/enci
Project Manager, NRR w/ encl
PUBLIC IE-01 w/enci
DRP w/ encl
OC/LFDCB w/enci
Rlli PRR w/enci
l
SRI Fermi w/enci
CAA1 w/enci (E-mail)
A. B. Beach, w/enci
Rlil Enf Coordinator w/ encl
Deputy RA, w/enci
DRS (2) w/enci
TSS w/enci
J. Lieberman, OE w/enci
!
J. Goldberg, OGC w/ encl
R. Zimmerman, NRR w/enci
i
l
l
!
'
!
!
>
l
-
4
l
'
l
!
-
-