May 30,1997
'
Mr. Ted C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
Northeast Utilities Service Company
clo Mr. Terry L. Harpster
'
P.O. Box 128
j
Waterford, CT 06385
'
.
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-443/97-02 AND NOTICE
,
OF VIOLATION
4
Dear Mr. Feigenbaum:
.
On April 14,1997, the NRC completed an inspection at Seabrook Station. The enclosed
report presents the results of that inspection.
During the 7-week period covered by this inspection report, your conduct of activities was
generally characterized by safety-conscious operations and sound engineering efforts that
I
developed a sound temporary modification to maintain spent fuel pool cooling while
,
connections were being welded to the system to support installation of a third spent fuel
,
pool cooling pump. Additionally, maintenance personnel eventually performed repairs of a
charging system isolation valve air regulator in a well controlled manner - preparatory
aspects were weak.
l
Additionally, the security program was inspected during this period. The inspection
'
consisted of selective reviews of procedures and records, inspector observations, and
j
interviews with security personnel. Except for the noted violation, the inspectors
determined that you are implementing a security program that effectively protects public
health and safety,
,
Based on the results of this inspection, the NRC has determined that a violation of NRC
)
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice)
,
and involved the failure to control licensee designated vehicles properly. Additional
circumstances surrounding the violation are described in detail in the subject inspection
report.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whethur further enforcement action is necessary to ensure compliance with
regulatory requirements.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter.
'
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
,
s
,f
//
9706100253 970530
llll l; l llill{ll}l{
l ,0
ADOCK 05000443
7
'
G
a
.
l
.
,
Mr. Ted C. Feigenbaum
2
The responses directed by this letter and the enclosed Notice are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Sincerely,
Original Signed By
Eben L. Conner for:
1
Richard J. Conte, Chief
j
Projects Branch 8
Division of Reactor Projects
j
i
Docket No. 50-443
License No: NPF-86
Enclosures:
2. NRC Inspection Report No. 50-443/97-02
cc w/encis:
B. D. Kenyon, President - Nuclear Group
D. M. Goebel, Vice President - Nuclear Oversight
F. C. Rothen, Vice President - Work Services
J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering & Support Officer
H. F. Haynt.s, Director - Nuclear Training
B. L. Drawbridge, Executive Director - Services & Senior Site Officer
A. M. Callendrello, Licensing Manager - Seabrook Station
W. A. DiProfio, Nuclear Unit Director - Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
L. M. Cuoco, Senior Nuclear Counsel
W. D. Meinert, Nuclear Engineer
L. A. Elisa 11, Regional Director, FEMA RI
D. C. McEthinney, RAC Chairman, FEMA Rl, Boston, Mass.
l
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire
D. P. Forbes, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
Corporation
Commonwealth of Massachusetts, SLO Designee
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Seacoatt Anti-Pollution League
State of New Hampshire, SLO
D. Tefft, Administrator, Bureau of Radiological Health, State nf New Hampshire
S. Comley, Executive Director, We the People of the United States
l
l
)
~ , , _ .
_ _ _ . _
. _ _ _ . .
. _ - . . _ _
_ .
. . . _ . - . _ . _ _ _ . _ . _ _ .- _ - . _ . . . _ . . - _ ._.
-
.
-
,
!
!
.
Mr. Ted C. Feigenbaum
3
I
!
i
Distribution w/encis:
!
Region 1 Docket Room (with concurrences)
!
PUBLIC
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
W. Axelson, ORA
D. Screnci, PAO
.
.R. Conte, DRP
E. Conner, DRP
]
C. O'Daniell, DRP
l
,
'
i
i
Distribution w/encls (VIA E-MAIL):
W. Dean. OEDO
. j
)
R. Correia. NRR (RPC)
F. Talbot, NRR '
D. Screrci, PAO, ORA -
Inspection Program Dranch, NRR (IPAS)
DOCDESis' -
.
!
f
t
,
1
t
.
DOCUMENT NAME: G:\\ BRANCH 8\\9702. SEA
To ,ece6ve a copy of this document, indicate in the boa: "C" = Copy without ettschn ent/ enclosure
"E' - Copy with attachment / enclosure
'N' = No copy
OFFICE
Rl/Di1P
l
Rl/DRP
l
NAME
JMacdonald
RConte
.
DATE
5/30/97
5/30/97
OFFICIAL RECORD COPY
!
I
t
,
,
. ~ . , . .
,
,,
I
,?
"
h
\\
.
Mr. Ted C. Feigenbaum
3
J q cl (r*
E. Conner, DRP
-
C. O'Daniell, DRP
f
Qi itibutior, w/encls (VIA E-MAIL):
.f
W. Dean, OEDO
R. Correia, NRR (RPC)
R. Frahm, Jr., NRR (RKF)
D. Screnci, PAO, ORA
Inspection Program Branch, NRR (IPAS)
Docdesk
vv
Cto
-sn
, s,r
dm
g
L
f
p)tJM
fcv - y
l
.
DOCUMENT N AE: G:\\ BRANCH 8\\9702. SEA
/p
h
to e.c.iv. . copy of thi.
, ment, indic.i. in thstwopy wi
ut attachment / enclosure
"E" = Copy with attachment /e losur
"N" = No copy
gs
l OFFICE
Rl/DRP
l
Rl/DRP
l
l
NAME
JMacdonaldj]g
RConte /'3)/
DATE
5 g./97 / /p
5/pjp7
OFFICIAL RECORD COPY
~'
%"J
.
'6f)