ML20140C491

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-456/97-02 & 50-457/97-02 on 970111- 0221 & Notice of Violation.W/O Notice of Violation
ML20140C491
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/28/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20140C495 List:
References
NUDOCS 9704170035
Download: ML20140C491 (5)


See also: IR 05000456/1997002

Text

.__ _ _ _ . . _ _ _ _ _ . _ _ _ . . . _ . _ _ _

h

y -0/

4

March 28, 1997

.

Mr. H. G. Stanley

'

Site Vice President

Braidwood Station

Commonwealth Edison Company

RR #1, Box 84

Braceville,IL 60407

SUBJECT: NRC INSPECTION REPORT 50-456/97002; 50-457/97002

NOTICE OF VIOLATION

Dear Mr. Stanley:

On February 21,1997, the NRC completed an inspection at your Braidwood 1 & 2 reactor

facilities. The enclosed report presents the resu'ts of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the

Braidwood facilities was generally characterized by safety-conscicus operations. We are

concerned, however, about a violation identified by NRC inspectors involving two

examples of failing to follow procedures by radiation protection technicians. Procedure

adherence problems that cross most of your organization have resulted in both cited and

,

non-cited violations were previously discussed in inspection Reports 96021,96019,

j 96014,96012,96011,96006, and 95017.

We are also particularly concerned about one violation involving inadequate corrective

actions. During this inspection period, inspectors identified the staging of materials on the

auxiliary building and fuel handling building roofs that were susceptible to being blown off.  !

It was conditions similar to these that caused the Unit 2 loss of offsite power and led to  ;

the issuance of NRC violation 96002-01. Corrective actions to prevent recurrence I

identified in LER 96-001 were clearly not implemented at the time of this roof inspection.

What makes this event more disturbing was the failure of station personnel to take

appropriate corrective actions once the inspectors identified the problem, and to provide

the proper control and oversight of contractor work. This event raises questions about the

ability of Braidwood Station to adequately imptoment corrective actions and to maintain

facility operation in accordance with those coo octive actions.

These violations are cited in the enclosed Notice of Violation, and the circumstances

, surrounding the violations are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed N >tice when preparing your response. Your response should not only detail the

actions to be taken for the specific issues identified but should also be broadly focused on

what actions you plan or have taken to ensure that your corrective actions process is

effective. The NRC will use your response, in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements. t

9704170035 970328 *

I(

gDR ADOCK 05000456

PDR

I!HJ15Hllpl.IlJllp.14

_ _ ._. __ ___

p

.

H. G. Staniey -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter l

and the enclosures will be placed in the NRC Public Document Room (PDR). '

l

Sincerely,

4

M

/A)'}- /! Shrbt

James L. Caldwell, Director j

j

Division of Reactor Projects I

,

Docket Nos: 50-456, 50-457

License Nos: NPF-72, NPF-77

i Enclosures:

1. Notice of Violation

2. Inspection Report 50-456/97002; 50-457/97002

.

d

I

!

DOCUMENT NAME: R:\lNSPRPTS\ POWERS \BRAl\ BRA 97002.DRP

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach!enci "N" = No copy

See attached concurrences.

OFFICE Rlli Rlli Rill ,1

NAME Tongue /co Kozak/ Orth Lanksbury (C I

Sect. R2,4,&B '

Q

'

DATE 3/ /97 3/ /97 3/ /97 3 6'97

OFFICIAL RECORD COPY

,

_ _ _ _ _ . _ . _ _ _ _ .__..__._-_.______-__._._-_.m__._-- . - -

{.

A

l

1

i

j ,

H. G. Stanley -2- j

l

4

- you are required to respond to this letter and should follow the !nstructions specified in the

{ enclosed Notice when propering your response. The NRC will use your response, in part,

1 to determine whether further enforcement action is necessary to ensure compliance with

,

regulatory requirements. ,

1

,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

! and the enclosures will be placed in the NRC Public Document Room (PDR).

i

,

Sincerely,

j

!

l

{ James L. Caldwell, Director

Division of Reactor Projects

,

!

! Docket Nos: 50-456, 50-457

i License Nos: NPF-72, NPF-77

!

-

Er' closures:

l 1. Notice of Violation

l 2. Inspection Report 50-456/97002: 50-457/97002 l

i i

! i

i  !

!

i

! i

4 ,

I l

l

. l

I

l

DOCUMENT NAME: R:\lNSPRPTS\ POWERS \BRAl\ BRA 97002.DRP i

! To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

!~ "E" = Copy with attach /enci "N" = No copy ,

1 i

4

OFFICE Rlli # Rlli g // Rlli y

NAME Tongue / cog K Lankaburyg Caldwell

i

3

DATE 3 4'/97 3fA97 3PO97 3/ /97

j. OFFICIAL RECORD COPY

1

i

,

1

i

. . _ , ~ _ __ , _ . . - _

.

,

H. G. Stanley -3-

cc w/ encl: T. J. Maiman, Senior Vice President

Ntelser Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpkin, Regulatory

Assurance Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

!

Commission  !

Document Control Desk-Licensino l

1

pistribution

Docket File w/enci DRP w/ encl

OC/LFDCB w/ encl Rill PRR w/ encl

PUBLIC IE-01 w/enct CAA1 w/enci (E-mail)

SRI Byron, Braidwood, Zion w/enci Rill Enf Coordinator, w/enct

Project Mgr., NRR w/enci A. B. Beach, w/enci

RAC1 (E-Mail) Deputy RA, w/ encl

TSS w/ encl DRS (3)

-ea.,4 1 a..-m - ar 2 e# f _ sAE. -M +.<.4 +-,y, , . mL.A.4_m_. L p 4 m e.C_,m

l

,

-

DRP REPORT TRAVELER l

FACILITY: bONdbpL INSP.END DATE: 2A 1

'

REPORT NO: 97001

.

PE IN/OUT Secy IN/OUT BC IN/OUT DD IN/OUT

-

3/so 340 abo Wo Ghr, 3(2.7 l

! l

l

,

S

i

,

l

i

,

!

.

l

3

1

,

t

6

i

..

l

l

1

I

.

l