Responds to NRC Re Violations Noted in IE Insp Rept 50-374/84-14.Corrective Actions:Special Test LST-84-108 Performed to Verify Proper Operation of Relays K60 & K73
ML20140C292
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 06/04/1984
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20140C289 List:
References
8721N, NUDOCS 8406190232
Download: ML20140C292 (2)


Text

,_

~

G CommonwooNh Edloon l

) One First Natiorrt Plua. Chicago, liknois O

O ] Addr;ss Reply to: P:st Othc3 Box 767 gG Chicago, Illinois 60690 June 4, 1984

{

L i

Mr. James G. Keppler i

Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road - Region III Glen Ellyn, IL 60137 l

l

Subject:

LaSalle County Station Unit 2 j

Response to Inspection Report No. 50-374/84-14 NRC Docket No. 50-374 l

Reference (a):

Letter from R. D. Walker to Cordell Reed dated May 8, 1984.

Dear Mr. Keppler:

This letter is in response to the inspection conducted by Messrs. R. D. Lanksbury and G. F. O'Dwyer on April 17 through 27 of activities at LaSalle County Station Unit 2.

Reference (a) indicated i

that certain activities appeared to be in noncompliance with NRC f

requ rements.

The Commonwealth Edison Company response to the Notice of Viol tion is provided in the enclosure.

If you have any further questions on this matter, please direct them to this office.

Very truly yours, i

D. L. Farrar Director of Nuclear Licensing i

1m Attachment cct NRC Resident Inspector - LSCS I

h 8721N

" ~

mstera#ta 0

ATTACHMENT COMMONWEALTH EDISON COMriNY LASALLE COUNTY STATION UNIT 2 RESPONSE TO NOTICE OF VIOLATION ITEM OF NONCOMPLIANCE 10 CFR 50, Appendix B, Criterion XI, as implemented by Commonwealth Edison (CECO) Quality Assurance (QA) Manual, Quality Requirement QR No.

11.0, requires that appropriate testing be performed and documented to assure that safety related components perform satisfactorily in service.

Contrary to the above, two relays in the Safety Relief Valve (SRV)

-low-low setpoint relief subsystem logic were replaced with safety-related relays as required but subsequent testing to verify that they would perform satisfactorily was not performed.

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED Special Test LST-84-108, " Low Low Setpoint Relay Test" was performed to verify the proper operation of relays K60 and K73.

Both of these relays functioned as designed.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER NONCOMPLIANCE It is felt that this is an isolated incident and that no further action is required.

DATE OF FULL COMPLIANCE Full compliance has been achieved.