ML20140C040

From kanterella
Jump to navigation Jump to search
Responds to NRC 851104 Ltr Re Unresolved Item Noted in Insp Rept 50-461/85-48.Corrective actions:PTP-SC-01 Revised to Include 10CFR50.62(c)(4) Requirements & Will Be Performed Prior to Fuel Load
Date released: 06/02/2020 Download: ML20140C040


Responds to NRC 851104 Ltr Re Violations Noted in Insp Rept 50-461/85-48.Corrective actions:PTP-SC-01 Revised to Provide Futher Assurance That Standby Liquid Control Sys Design Provides Adequate Chemical Mixing
ML20140C054
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/11/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20140C054 (3)
Responds to NRC 851104 Ltr Re Unresolved Item Noted in Insp Rept 50-461/85-48.Corrective actions:PTP-SC-01 Revised to Include 10CFR50.62(c)(4) Requirements & Will Be Performed Prior to Fuel Load
ML20140C037
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/20/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20140C037 (2)