ML20140B691

From kanterella
Jump to navigation Jump to search
Forwards Resubmittal of LER 83-020,Rev 1,correcting Inadvertent Listing of Page 1 Sequential Number as83-027
Date released: 06/02/2020 Download: ML20140B691


/03X-1:on 830428,pressurizer Sample Isolation Valve Failed to Close.Caused by Personnel Error & Inadequate Maint Procedures.Torque Switch Reset,Valve Stem Cleaned & Lubricated & Maint Order 1-83-3114-00 Rewritten
ML20140B702
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/17/1986
From: Long J
TOLEDO EDISON CO.
To:
References
Download: ML20140B702 (3)
Forwards Resubmittal of LER 83-020,Rev 1,correcting Inadvertent Listing of Page 1 Sequential Number as83-027
ML20140B686
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/17/1986
From: Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20140B686 (1)