ML20140B244
| ML20140B244 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/08/1981 |
| From: | Bryan J UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-502, NUDOCS 8109140116 | |
| Download: ML20140B244 (2) | |
Text
.
UNION ELECTRIC COMPANY 1901 GRATIOT sTRECT Sr. Louis, MISSOURI JOHN K. BRYAN mox 4e September 8, 1981 Mr. Harold R.
Denton Director of Nuclear Raactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 ULNRC-502
Dear Mr. Denton:
DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 The purpose of this letter is to confirm our verbal notification to Mr. Gordon Edison of your staff that the schedule for fuel loading of Callaway Unit 1 has been deferred from October, 1982.
The new fuel load date is currently being evaluated and will be specified at a later date.
Union Electric announced the delay on September 4, 1981.
A copy of the press release is attached for your information.
truly yours, er-1,,Jdhn K.
yan DS/jds e
0 e8 h.
44 5EF g1 i,_
i g g
- 9. v>
Y 8109140116 810908
[J Q
PDR ADOCK 05000483 A
i
- cc:
Glenn L.
Koester Vice President Operations Kansas Gas & Electric P.O.
Box 208 Wichita, Kansas 67201 John E. Arthur Chief Engineer Rochester Gas & Electric Company 89 East Avenue Rochester, New York 14649 A. V.
Lienhart Vice President i
Plant Engineering and Construction Northern States Power 414'Nicollet Mall Minneapolis, Minnesota 55401 e
Donald T. McPhee Vice President Kansas City Power and Light Company 1330 Baltimore Avenue i
Kansas City, Missouri 64141 Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.
- Washington, D.C.
20036 4
Nicholas A.
Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 W. Hansen Callaway Resident Office J
U.S. Nuclear Regulatory Commission RR#1 Steedman, Missouri 65077 1
1
- ~,
-ww---
+p-,
,,.-,-,v>-,,m
~
,,wm-,-wmv-n,-,n,-~,,<w.,v-w.~m-~,s
,-v,,,-,,wr,,,w<
-ern~.,,,,,-n,m
-s----,
-n-
~w---vr~
~,
-,-w-,-
--