s May 30, 1997 I
Mr. H. G. Stanley Site Vice President Braidwood Nuclear Power Station Commonwealth Edison Company R.R. #1, Box 84 Braceville,IL 60407
Dear Mr. Stanley:
In a telephone conversation on May 30,1997 between Mr. Darren Meyers and Mr. Jay Lennartz, arrangements were made for the administration of licensing examinations at the Braidwood Nuclear Station the week of October 6,1997, i
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
i l.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 28,1997. The written examinations, operating tests, and the supporting reference matetials identified in Attachment 2 of ES-201 will be due by September 2, 1997. Any delay in receiving the required examination and reference materials, or the j
submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
O l
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor t
operator and senior reactor operator license applications (Office of Management and I
Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications j
certifying that all training has been completed should be submitted at least 14 days before l
the first examination date.
t I
050086 lllll151E lN1E1R EllE 1HlllNNENl1 IN 88 9706060091 970530 luu PDR ADOCK 05000456 V
PDR cc
r H. G. Stanley May 30, 1997 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information 5
and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
i The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Darren Meyers has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the i
NRC's examination procedures and guidelines, please contact Mr. Jay Lennartz at 630-i 829 9721, or me at 630-829-9705.
Sincerely,
/s/ Melvyn Leach Melvyn N. Leach, Chief Operator Licensing Sranch j
Docket No. 50-456 Docket No. 50-457 See Attached Distribution DOCUMENT NAME:G:\\DRS\\ BRA 660-7.DRS l
To reoolve e copy of this document, indicate in the bos 'C' = Copy w/o attach / enol T = Copy with attach /enci "N' = No copy l
OFFICE RIII:DRS lM Rill:DRS lv l
NAME JLennartz:jn>L MNLeach #A A DATE gholn O' C/.w/9 7 OFFICIAL RECORD COPY
.m.. - -.. _
l i'
H. G. Stanley May 30, 1997 cc:
T. J. Maiman, Senior Vice President, Nuclear Operations Division l
D. A. Sager, Vice PrerJdent, l
Generation Support H. W. Keiser, Chief Nuclear Operating Officer T. Tulon, Station Manager T. Simpken, Regulatory Assurance Supervisor
- i. Johnson, Acting Nuclear Regulatory Services Manager Document Control Desk - Licensing Richard Hubbard Nathan Schloss, Economist, j
Office of the Attorney General l
State Liaison Officer Chairman, Illinois Commerce Commission J. Walker, Training Department l