Exam Rept 50-244/OL-85-23 on 851111-15.Exam Results:All Candidates Passed Both Written & Oral Portions of Exam
ML20140B040
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/08/1986
From: Coe D, Keller R, Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140B030 List:
References
50-244-OL-85-23, NUDOCS 8601230446
Download: ML20140B040 (80)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ -. _ _ _. 1 f i l f P U. S. NUCLEAR REGULATORY COMMISSION REGION ! { OPERATOR LICENSING EXAMINATION REPCRT l i EXAMINATION REPORT NO. 50-244/85-23 (OL) i FACILITY DOCKET NO. 50-244 i FACILITY LICENSE NO. OPR-18 I LICENSEE: Rechester Gas and Electric Corporation l 89 East Avenue l Rochester, New York 14649 1 FACILITY: R. E. Ginna EXAMINATION DATES: November 12 - 15, 1985 _f!MN { CHIEF EXAMINER:. A/ _

  • u
0. H. Coe, Reacto ngineer (L_aminer)

Date ~ 2 l REVIEWE0 BY: / l Robert M. Ke ler, hief',"PMjicis section 1C bat'e i -~ APPROVED BY: T[ j Harry B _. Kfs er, thi2, at ( Projects Bracch No.1 l j SLMMARY: Written and oral eratinations were administered to the following j candidates: Four Reactor Operators, three Senior Reactor Operators (Upgrade), { and two Senior Reactor Operators (Instant). All candidates passed both the wettten and oral portions of the examination. ) i 1 I i i l f I l 4 l r 1 i [ Q i l

REPORT DETAILS TYPE OF tiXAMS: Replacement EXAM RESULTS: l R0 l SR0 l l Pass / Fall l Pass / Fall l l l l l l l 1 l Written Exam I 4/0 l 5/0 l l l. I I I I I I l Oral Exam l 4/0 l S/0 l l l ._ l _ l l l I l l Overall I 4/0 l 5/0 l I I I i 1 CHIEF EXAMINER AT SITE: D. H. Coe 2. OTHER EXAMINER: R. M. Keller, NRC \\ l -l l

i I i 3 1 i 1. Summary of generic deficiencies noted on oral exams: i Reactor Operators had difficulty locating the procedure for natural ] circulation, t 2. Summary of generic deficiencies noted from grading of written exams: i None i 4 3. Interface with plant staff during exam period: The plant training staff was helpful in providing the necessary admin-istrative support during the conduct of the examination. 4. Personnel present at Exit Interview: i i N_RCperonM l

0. Coe, (nief Examiner W. Cook, Resident Inspector a

1 T. Kim, Resident Trainee l l Facility _ personnel l T. Schuler, Operations Manger R. Morrill, Training Manager ] L. Smith, Operations Supervisor j B. Carroll, Assistant Training Coordinator J. Wayland, Assistant Training Coordinator i 5. Summary of NRC Comments made at exit interview: I The candidates' overall performance in the oral exam ranged from very good l j to marginal. No specific preliminary results were presented, i i The quality of the reference material provided to NRC examiners in Region I was poor. A combined total of seven written exam questions required change or, in one case, deletion because reference material sas not correct, or current. This material should be up graded prior to the next j NRC exam. I 6. At the conclusion of the written examinations, the facility was provided i a copy of the examination and the answer key, lhe licensee reviewed the questions and answers to identify any inappropriate questions relative to plant specific design, and to ensure that the questions will elicit the answers in the key and that they reflect the most current plant condi-3 tions. The following licensee representative discussed the results of this revied with the chief examiner prior to the exit meeting: 1 I J. Wayland 4 I I i

t l 4 l Attachments: 1. R0 Written Examination and Answer Key 2. SRO Written Examination and Answer Key 3. Facility Comments on Written Examinations made af ter Exam Review l l r 1 (

I ^ * '" # ' l l.4 A5TER l l U.S. NUCLEAR REGULATORY COMMISSION REACTOR OPERATOR LICENSE EXAMINATION Facility: nyan Reactor Type: pwn.wec 2 Date Administered: 11/11/ss Examiner: o_w. nurk. Candidate: INSTRUCTIONS TO CANDIDATE: Use separate paper for the answers. Write answers on one side only. Staple question sheet on top of the answer sheets. Points for each question are indicated in parentheses after the question. The passing grade requires at least 70% in each category and a final grade of at least 80%. Examination papers will be picked up six (6) hours after the examination starts. % of i Category % of Candidate's Category Value _To tal Score Value Category 25.0 .2iJ 1. Principles of Nuclear Power Plant Operation. Thermo-dynamics, Heat Transfer and Fluid Flow 2s.0 .2L.0 2. Plant Design Including Safety and Emergency Systems - n.o 25.0 3. Instruments and Controls 25.0 25.0 4. Procedures - Normal, Abnormal. Emergency, and Radiolcgical Control 100.0 TOTALS Final Grade AII work done on this examination is my own. I have neither.glven nor received aid. g Candidate's Signature \\ .1

1. Principles of Nuclear Power Plant Operation. Thermodynamics. l Heat Transfer and Fluid Flow (25.00) i l Question 1.01 (2.25) l l An estimated critical position (ECP) has been calculated for a reactor l startup that is to be performed 6 hours af ter a trip from a 60 day full l power run. How would each of the following events or conditions (independently) affect the actual critical rod position compared to the ECP7 In your answer select whether the actual rod position would be: hig,her than ECP, lower than ECP. or no significant difference, a. The startup is delayed for approximately two hours. (0.75) b. The steam dump pressure setpoint is increased by 100 psi above that used in the ECP calculation. (0.75) c. A new boron sample shows a boron concentration 20 ppm higher than that used in the ECP calculation. (0.75) Question 1.02 (1.50) Calculate the stable startup rate (SUR) of a reactor whose power is doubling every 45 seconds. Show all work. Question 1.03 (2.00) How is the isothermal temperature coef ficient of reactivity defined? (0.5) a. During what plant condition (s) is it of interest? (0.50) b. How is the (total) power coefficient defined? (0.50). During what plant condition (s) is it of interest? (0.50) l 1 Question 1.04 (2.00) Prior to startups af ter the initial startup, the secondarf source must cause at least two counts per second above background on the source range detectors. Give two reasons for this requirement. Question 1.05 (2.00) Give two reasons why it is desirable to have the control rods in an ALL RODS OUT (ARG) configuration during full power operation. Ginna Category 1 questions continued on next page.

.~ ~ \\ Ginna Category 1 questions continued. Question 1.06 (1.50) For the following cases, state whether the moderator coefficient of reactivity becomes more negative, becomes less negative, or stays the same. 0 with a 0 to 570 The moderator temperature is increased from 547 a. constant boron concentration of 900 ppm. b. The boron concentration is decreased from 1100 ppm to 900 ppm with the 1 moderator temperature held constant at 547 F. ] We advance from BOL and approach EOL in the normal manner. c. Question 1.07 (2.75) '4 4 During a reactor startup, the operator stops rod pull no. 10 at 160 steps on Bank C. The source range monitor (SRM) count rate levels of f at 2000 CPS. The initial SRM count rate was 200 CPS at zero steps withdrawn on Control Bank A with Keff = 0.95. Calculate the 1/M value for this control rod position. (1.00) a. 4 b. Determine, by calculation, whether the reactor is suberitical, critical or supercritical at this control rod position. Show all work. (1.75) Question 1.08 (1.00) Figure 1.1 shows the xenon concentration history of a reactor operating over the last 200 hours after startup from.a clean, xenon free condition. The power is at the 50% level during the first time span (approx. 50 hours). Estim.at.e the steady power levels that must have existed, during time spans A through D. of' I i Question 1.09 (2.00) What would the temperature and phase of the fluid downstream of the pressurizer PORV be if it should stick open at normal operating conditions 4 (at power) in the pressurizer with a 500 psia back pressure in the pipe downstream of the PORV7 Ginna Category 1 questions cont'inued on next page. s k

O Ginna Category 1 questions continued. 4 Ouestion 1.10 (2.00) . Describe the principle of operation of the device used to measure the rate of flow in the reactor coolant system. Question 1.11 (2.00) List four ways that could be used to increase the NPSH provided to a pump. Question 1.12 (2.00) Assuming that you are operating at 85% power, indicate how the following changes in plant conditions would affect DNBR (increase, decrease, or no effect). Consider each case separately. 1. The operator manually withdraws control rods without changing turbine load. (0.50) 2. A steam generator PORV fails open. (0.50) 3. The pressurizer heaters are inadvertently left on. (0.50) 4 The reactor coolant pump speed decreases. (0.50) Question 1.13 (2.00) Refer to figure 1.2. With both pumps operating and with all valves fully open, determine the following: a. The total system flow rate. (1.00) b. The flow rate through heat exchanger number 4. (1.00) End of Ginna Category 1 questions.

h 9 00 2 08 A 8 C'D 1 1 D S L EV E L R 0 P E i 8 U W 1 T O R P 2 A D T E l S TAM 0 R I I 4 E T 1 T S F E A N O N I N O S OI I T C S ITI M AD 0 I 2 M RN 1 O EO C P C Y O E 1 R FE O T OR S A F 0 R 1 I 0 U L S c H E 1 O U R l R G U N U O O 8 G E R H N I l R E F A 0X EL 0 A 0 C 2 I 8 U RM N OO S. FR F A U Y R 9 O T 0 I 6 SI H 2 N l O N E 0 X i 4 %06 0 2 l 2 0 DsEO5a 2g.X

  • i i.

ASSIMPTl0NS: 1. Tha two punp2 arn idsntical, centrifugal, constant epu d pumpz. 2. The friction pressure losses through the lines, open valves, check valves, and flow meter are negligibic. 3. Heat exchangers numbers 1, 2, and 3 are identical. t F'LDW ) h HV g 'I' AI}* y4g-1 H HV l .h ib Hz ) y q q

  • t O

O O Y v vN HVg4 i _. _..........._..i____._. _ _ _ _...... _. _.. _......._. i..... ; ...............i_.._-.. 4 .,r_ _._ ...o.. .... _..., ~ _ _... a?. ....__a._.___._.... _. _.. .... _ _. _ =. ___ .___w. , _. _..... _ _ __._ t.. 9 ....... u...e... _... _ i.. .........._.. _..........__._i..__._.,___._...... .3 .... _... _....._.i___.. _......_.r..__.. _ _ _ _., . _.r,.____- . p. _.._. a _._.4 _.._.. ~-~_s-._ s rr = =- _.. L _. r . _...r __..- 160 :..._..___.__ _ i_ _ ... _...... -.. _. _. _ _ __.i._ .._,_1..___.t.--I--"._.._-....._a__. iN

::.-- m- _ _ _

. =... - .__=,. =__/ _ _ 1 __-.r__. ,3 _3__ .._..t..-- -_...i _.- -____4 .,. _ _ L, r s O _t. 4 _._ r ~ _. _-._g._._. _. 1 __._ g 1 f ..._.4 _.3 _ _ p__. __.2.. _.a t a. n...-_...... 80 _i.____...--.,_.______.__:-_. _ _.... _ H Li ~ __.s_..._... _.._...:.. . _. = __.,.__.o....._ ..t... __.. r.. ............i_.. m. 3 ........_..._._._.t. ....i... i.. .. r. ..e. i .t 23 i i. t .l l-l I ~. ..: - 1

1. -I i-

..r - - t e i 3 20. 40 00 20 100 12 0 140 160 ISO 200 220 240 200 C/PACITY erd FIGlRE 1. 2.

[=- _ :~~ ~ i 2. Plant Design, Including Safety and Emergency Systems (25.00) Question 2.01 (1.5) List three signals that will cause automatic main steamline isolation. Question 2.02 (1.5) The hydrogen overpressure in the VCT serves what three purposes? Question 2.03 (1.5) In order for the operator to manually close the letdown isolation a. valve (A0V-427) from the MCB, all letdown orifice isolation valves must be closed. What is the reason for this interlock? (1.0) What interlocks, if any, w(ill prevent the Operator from closing the letdown b. orifice isolation valves ADV-200A, B, and 202) from the MCB7 (0.5) Question 2.04 (2.0) Give two functions of letdown control valve PCV-135. Question 2.05 (2.0) What chemical is used in the containment spray additive tank? (0.5) a. Why is this chemical added to the spray (i.e., what gets accomplished b. that would not be accomplished by a borated water spray aione?)? (0.5) Y How does this chemical enter the spray stream? (0.5) c. t J d. What will initiate containment spray (include setpoint and f coincidences)? (0.5) Question 2.06 (1.0) What protective features will trip an emergency diesel engine when it is running ~ with a SI signal present? Question 2.07 (2.0) Explain how two safety related requirements are satisfied by delaying the-main generator trip 60 seconds after a turbine trip. Ginna Category 2 questions continued on next page. ~.

Ginna Category 2 questions continued. l Question 2.08 (3.0) What Ginna system or systems provide cooling for the following: SI pumps (u>ld Awh) (0.6) a. (0.6) b. Boric acid recycle evaporator. (0.6) Spent fuel pit heat exchanger. c. Charging pumps (WA wfor.s) (0.6) d. (0.6) Pressurizer relief tank. e. 1 1 l Question 2.09 (2.0) What four accidents form the design basis _for the emergency core l cooling system (ECCS)? i l Question 2.10 (2.0) With an S1 signal present, what two different signals will open the SI pump suction 1 valves from the RWST (MOV825A and B)? i i i Question 2.11 (2.5) Answer the following questions regardin3 the design of the Main Steam system. j a. What design feature of the S/G limits steani flow during a main steam piping rupture upstrean. of the MSIV? (0.5) i b. List two purposes of the S/G atmospheric relief valves. (1.0) c. What motive force is used to open the Main Stear. Isolation i l Valves? What motive force shuts them? (1.0) i i Question 2.12 (1.5) What position does an atmospheric steam dump assume if. while it is open, the operating air supply is lost? Explain. i Question 2.13 (2.00) G Answer the following questions concerning the Standby Auxiliary Feedwater System. 1

a. List all sources of water available to the pump suctions.

.LL & P (/,o )-

b. What interlocks or conditions can prevent starting a pump?

Do not include malfunctions or lack of electrical power. M (1,ol i Ginna Category 2 questions continued on next page. i

Ginna Category 2 questions continued. Question 2.14 (0.5) What protective turbine trip is blocked by use of the TURBINE LATCH pushbutton during plant startup? End of Ginna Category 2 questions. 4

y_ 7_. e .+ ~ z. 3. Instruments and Controls (25.0) Question 3.01 (2.00) Answer the questions below regarding the SGWLC system, a. How is the volumetric main steam flow r a t.e converted to a mass flow rate? (0.5) b. If the steam flow signal were to fail *as is* and turbine load were increased, what would be the effect on the corresponding steam senerator water level (higher and stable, lower and stable, higher and constantly risins, lower and constantly decreasins, same)? Briefly explain why. (1.5) Question 3.02 (3.0) Suppose that following a turbine trip the condenser steam dumps have cooled the primary coolant to 547 F and the dump valves have closed. What operator action should be taken at this time pertaining to the a. steam dump system? (1.0) b. Describe two methods of operation of the condenser steam dumps that the operator could use to cool the system down below 5470F. (2.0) Question 3.03 (2.5) One of the main steam turbine protective trip devices is a solenoid trip device. List the five signals that will energize the solenoid and thus cause a turbine trip. Question 3.04 (3.0) For each of the following situations. indicate the initial direction of travel for the feedwater regulating valve FCV-466 (answer either OPEN or CLOSE). Assume that the plant is initially at steady state full power and that FCV-466 is in AUTO. a. The turbine trips. b. An inadvertent SIS actuation. c. Controlling first stage pressure transmitter fails low. d. Controlling steam generator pressure transmitter fails low. e. Controlling feed flow transmitter fails high. f. Steam generator level transmitter (LT-461) fails low. Ginna Category 3 questions continued on next page.

  • ~

~ ~ -+; e. Ginna Category 3 questions continusd. Question 3.05 (2.5) During a situation that renders the main control room " inaccessible," the Ginna plant controls required to safely shut the plant down can be operated by stationing operating personnel at various local control Several key components have local control stations for use in stations. this situation. List five of these components. Question 3.06 (3.0) Using a simple sketch and a brief description, explain how the GINNA RHR system, when operating in cooldown mode. meets the two objectives of maintaining a constant flow rate through the RCS and controlling the RCS cooldown rate. Question 3.07 (2.5) List five control interlocks (including coincidences) that will stop automatic rod withdrawal. Do not include " urgent failures." Question 3.08 (1.0) incore thermocouple system contains reference junction boxes that are normal. intained at 160 F. Answer the following questions assuming bdg. 6 ^ D d d eck that the refe junction box temperatures fail to ambient. a. The multi-point precist 'ndicator (in the control room) will indicate readings that are hi than/ lower than/or the.same as the unction. (0.5) readings that were taken before the t are higher The plant computer readout will indicate readings b. before the than/ lower than/or the same as the readings that were ta malfunction. (0.5) I Question 3.09 ( 1.0 ) feature of the pressurizer power operated relief valve's control l What system prevents sustained inadvertent _ operation of the valve in the open position as a result of a pressure transmitter failing high? Question 3.10 (2.0) l Answer the following questions regarding the Main Feed and Condensate systems: a. What automatic action should occur in response to a low feed pump suction pressure alarm? (0.5) b. List four conditions which will trip an individual f main feed pump but which will not trip both main feed l I pumps simultaneously. (l.0) 4

c. What automatic action (s) should occur immediately following a single main feed pump trip?

Do not include [ any reactor protective actions. (0.5) Ginna Category 3 questions continued on next page. L

Ginna Category 3 questions continued. Question 3.11 (2.5) What are five of the interlocks that must be satisfied before a main feedwater pump will start? End of Ginna Category 3 questions. l

y - - ~ _ _ - - _ _ -. -

~

4. Procedures - Normal. Abnsrmal Emerg:ncy,., .~ and Radiological Control (25.0) Question 4.01 (2.0) TJ .M

  • w o.

According to procedure E-S; CofftROL ROOM INACCESSIBILITY, w list the first immediate action that ishotiid be taken after the control room has been declared inaccessibls and give three ways that this action may be accomplished. Question 4.02 (2.0) List two automatic actions that should always be initiated when one a. RCCA drops. b. k' hat is the intent of the immediate operator actions of procedure E-7. DROP OF A ROD CLUSTER CONTROL ASSEMBLY, in response to the dropping of one RCCA7 Question 4.03 (5.0) In accordance with procedure E-20, IMMEDIATE BORATION, list five a. conditions or symptoms that require immediate boration. (2.5) b. List the five irnediate operator actions required in procedure E-20. (2.5) Question 4.04 (3.0) L' hat are the required icnediate operator actions in procedure E26.2, REACTOR TRIP-TURBINE LATCHED 7 Question 4.05 (3.0) Document 10 CFR 20 provides r'egulations for radiation exposure at Ginna Station. Answer the following questions in accordance with 10 CFR 20. a. What is the initial GUARTERLY Whole Eody exposure limit for an individual in a restricted area who has never before recieved occupational radiation exposure? (0.75) b. What TWO criterza must be satisfied in order to exceed the above limtt under N0tJ-ENERGENCY conditions and what maxtmum quarterly exposure may be recieved under these conditions? (2.25) Ginna Category 4 questions continued on next page.

(- _~ _. ~ ~ Ginna Category 4 questions continued. Question 4.06 (2.0) 1 Answer the following questions regarding procedure 0-1.1 PLANT HEATUP FROM COLD SHUTDOWN TO HOT % 6fDOWN>

a. A note indicates care should be taken if demineralizers are switched, particularly when placing a new m i:< e d bed in service. Why is this a concern?

(0.5) l

b. Step 5.9 requires checking the ' temperature profile i

I between the RCS and the S/G's' prior to starting a RCP when RCS temperature is less than or equal to 330 degrees F and pressurizer level is greater than 38%. Why is this a concern? (0,5) c. During pressurizer bubble formation, RCS pressure will increase and a subsequent increase in letdown flow will be noted. What is the maximum allowable letdown flow and why is this limit set? (1.0) Question 4.07 (1.0) During a startup, what minimum count rate is required before a source range nuclear instrument is considered operable? Question 4.08 (1.0) Operating procedure 0-1.1, PLANT HEATUP FROM COLD SHUTDOWN TO HOT SHUTDOWN, requires you to verify that secondary side steam pressure is greater than 514 psig before reaching 2000 psig pressure on the primary side. Why is this necessary? Question 4.09 (2.0) What are four prerequisites for making a radioactive liquid release from the R. E. Ginna plant? Question 4.10 (3.0) Emergency procedure E-23 lists symptoms for RCP seal malfunctions. For each of the seals below, give one symptom that would indicate a complete failure of the seal (consider each one separately). a. Number 1 seal. b. Number 2 seal. c. Number 3 seal. i Ginna Category 4 questions continued on next page.

~ l l Question 4.11 (1.0) The steam generator tube rupture procedure (E-1.4) has three major objectives as follows: 1. Begin a rapid cooldown of the RCS to approximately 490 F. 2. Isolate the affected S/G. 3. Begin a depressurization of the RCS to a pressure equal to the faulted S/G steam pressure. Indicate the sequence in which the above actions should be done (i.e., 1, 2,3;3,2, 1; etc.). End of Ginna Category 4 questions. e O

- = - 10 /o A(x) = A s-UX Ici = 3.7 x 10 d o cp = - 1 x 10 5 AK/*F M = 1/(1-k) = CR1 K 1CRf oy = - 1 x 10 3 AK/% voids N(t) - No e-AT 4 K a = (Lg+L ) (4 rod)2 r ag = - 1.0 x 10 4 AK/%'F ($ avg) K n = v/(1 + d) op = -4.5 x 10 4 AK/% power K P = I ( v/(3.7 x 1010) I(t) = Io e-At t = (8-9)/Ap ~ TW = An(2)/A t = A/p + (6-p)/Ap Cp = (CPhase) (Ks) (K ) T" A/(pi) A y=vg + xygg 2 + ha - hr - hn =,P2 + g2 + Y2 pg + Zi + Vg H = zhg + (1-x) hg _y 2g 6 2g S = zSg + (1-x) Sg = (AP )g gV 2 (Apt) 1 in = 2.54 cm 1 gal. - 3.785 liters Q = HCp At 1 kg = 2.205 lb D 2ge N = pao /A f = 64/Re 17.58 watts = 1 BTU / min Ipsi = 6.895 Pa p = k(eff) -1 1 psi = 2.036 " (0 OC) K(eff) 1 psi = 27.68 " H 0 (G 4C) 1 - CR1 = 1-K(eff)2 S =.0071 M CR2 1-K(eff)1 A = 2 x 10 5,,e Q = Mah Ad = 12.5 Q = UAAT RE " I $th f A = 0.1 SCR = S 1-Kaff 2 ht = kaV 0=6 P = Po 105UR(t) Ag + g SUR = 26.06 x Reactor thermal power = (h -h ) x steam flow rate 2 l P = P, e / t K= 1 t 1-p

l 1. Principiss of Nuclear Power Plant 0paration. Tharmodynamics, 2 ~ Haat Transfer and Fluid Flow (25.00) Answers - Ginna - 11/11/85 - Burke, O. W. Answer 1.01 (2.25) i i a. higher than ECP. (0.75) b. higher than ECP. (0.75) c. higher than ECP. (0.75) 1 j Ref. Ginna Procedure No. 0-1.2.2. CRITICAL ROD POSITION CALCULATION. 1 1 i i l Answer 1.02 (1.50) i l P = P(o)l0SUR(t) (0.25) i i P = 2P(o) when power doubles (0.25) 2P(o) = P(o)l0SUR(0.75) (0.25) f 8 2 = 10SUR(0.75) J i log 2 = SUR(0.75) (0.25) log 2 (0.301) 0.401 DPM (0.50) i SUR = = = l 0.75 0.75 i Ref. Ginna Reactor Theory Book, page 4-29. j Answer 1.03 (2.00) l i a. The isothermal temperature coefficient is defined as the change in t reactivity for a unit change in moderator, clad, and fuel temperatures. Therefore, it is simply the sum of reactivity l changes for a given 1 degree temperature change. (0.5) l It is of interest during reactor startup when the core ~' l materials are uniformly heated (by other means than reactor power) and ) there is effectively a single temperature everywhere in the core. (0.50) 1 a 1 G1nna Category 1 answers continued on next page. i 1 I i l l - - ~ - - ~. --_-_m,.._,----.,---_-.,-.-__.._,--_._-.._. _,..__-.-,-,-,.,_.,.,_..----._.-_.m.

.___y _ _ _. _ _ _.m ~ -~ 1 1 l Ginna Category 1 answers continued. ~ l' Answer 1.03 continued a f b. The (total) power coefficient is a measure of the change in reactivity of the core for a unit change in reactor power, when operating on l It is the sum of the programmed average moderator temperature. doppler-only power coefficient and the moderator-cnly power coefficient. (0.50) It is of interest during reactor operation l j l jl at power, or during power changes, when fuel temperatures are much I (0.50) } higher than moderator temperatures. i i Ginna Reactor Theory Book, Chapter 5, pages 58 and 61. f Ref. i h l Answer 1.04 (2.00) To assure the operator that the source range detectors are operating ) 1. properly. (1.00) It will allow for monitoring the core's subcritical neutron level. 1 2. I (1.00) 1 v Ref. Ginna Reactor Theory Book Section 4, page 53. [ t Answer 1.05 (2.00) i 1. Provide reserve reactivity for adequate shut down margin. (1.00) i 2. Avoidance of local power peaking problems. (1.00) i Ref. Ginna Reactor Theory Book Section 5, page 3. Answer 1.06 (1.50) i { I a. more negative (0.50) l t b. more negative (0.50) i i i c. more negative (0.50) \\ Ref. Ginna Reactor Theory Book, Section 5, pages 20-32. l i I ) Ginna Category 1 answers continued on next page. i l j I i i h _.,--. -..,_.. _ __ ___ _. - -..-., _,.... !,,_. - ~,,-

1 i i I Ginna Category 1 answers continued. I i Answer 1.07 (3.00) CRl/CR2 a. 1/M = 200/2000 = 0.100 (1.00) = 4 i b. Calculate Keff after rod pull no. 10. (1 - Keff2)/(1-Keff1) 1/M = P 0.100 (1-Keffl0)/(1-0.95) = k 0.995 (1.0) ~ Keffl0 = i I Since Keff is less than 1, the reactor is subcritical. (0.75) I Ref. Ginna Reactor Theory Book, Section4, page 61, f Answer 1.08 (1.00) i A - 100% j B-0% (tripped) j C - 100% D-50% I Note: A tolerance of plus or minus 10% will be permitted on A, B, and i D. l Ref. Ginna Reactor Theory Book, Section 6, page 12. I s i Answer 1.09 (2.00) Since this is a throttling process, the enthalpy will be constant.- On the l Mollier diagram, we find the point of intersection of the 2250 psia line with the saturation line. From this' point we follow the constant enthalpy j l line to its intersection with the 500 psia line. We are in the wet vapor phase at this point. (1.0) From the steam tables, we find the saturation temperature corresponding to 500 psia to be 4670F. (1.00) ] Ref. Ginna Thermodynamics, Heat Transfer, and Fluid Flow Book, Section 5, i page 27; also the Mollier diagram and the steam tables. Ginna Category 1 answers continued on next page. i ? i .w -,-.w- ,-y,- ,y, 7 ,-.---------p- -r-v-.

i } Ginna Category 1 answers continued. i Answer 1.10 (2.00) A pipe elbow is used for this measurement. The principle of operation is that as the fluid flows around the bend in the elbow a centrifugal force is felt on the outside of the radius which results in an increase in the j l pressure at the outside and a decreased pressure at the inside of the i radius. The pressure difference ( P outside to inside) is dependent on the flow rate. The volume flow rate is prcportional to the square root of j the pressure difference. i. f Ref. Ginna Thermodynamics, Heat Transfer, and Fluid Flow Book, Section 5, page 13. i 4 Answer 1.11 (2.00) (Any four of the following at 0.5 points each) I j 1. Increasing suction pressure. j l 2. Pressurizing the entire system. i 3. Subcooling or lowering the temperature of the fluid entering the pump. 4 Increasing the height of fluid above the pump suction. s i 5. Reducing the volume flow rate of the pump. i 1' Ref. Ginna Thermodynamics, Heat Transfer, and Fluid Flow Book, Section 6, a j pages 38-44. i Answer 1.12 (2.00) 1. DNBR decreases (0.50) 2. DNBR decreases (0.50) 3. DNBR increases (0.50) 4. DNBR decreases (0.50) l i Ref. Ginna Thermodynamics. Heat Transfer, and Fluid Flow Book, Section 9, l pages 32-39. i Ginna Category 1 answers continued on next page, i. 4

I l J ( Ginna Category 1 answers continued. i. i Answer 1.13 (2.00) i On figure 1.2, read 100gpm at the intersection of the pumps a. head-capacity curve and the system head loss curve (system operating 1 t point). i b i l b. From the system operating point as found in part a, we find that the l pump head is 100 ft. With a pump head of 100 ft, we see that the flow I rate through heat exchanger number 4 is Mgpm. i Ref. Ginna Thernodynamics, Heat Transfer, and Fluid Flow Book, Section 6, I page 35, and Section 7 page 5. I i ) I End of Ginna Category 1 answers. l ~ 1 J I J j i f 4, t 1 4 P j l i i I i 9 s i I i l I

= 1 N 2. Plant Design, Including Safety and Emergency Systems (25.00) Answer 2.01 (1.5) 1. High-high steam flow coincident with an SI signal. (0.5) 2. High steam flow and low Tavg coincident with an SI signal. (0.5) 3. High-high containment pressure of 18 psig. (0.5) j Ref. RGE-21, page 11. I Answer 2.02 (1.5) i r 1. It removes oxygen from the coolant. (0.5) ) j 2. It provides a minimum suction pressure for the charging pumps. (0.5) { 3. It provides the proper back pressure on the coolant pumps' number 1 j seal. This back pressure also causes flow to the number 2 seal. (0.5) l{ 1 s i Ref. RGE-16, page 4. Answer 2.03 (1.5) To insure that the regenerative heat exchanger is always at RCS a. pressure to prevent steam flashing and possible damage to its tubes. i (1.0) i b. There are no interlocks to prevent the operator from manually closing i the orifice isolation valves. (0.5) i i Ref. RGE-16, pages 5-7. i Answer 2.04 (2.0) l 1. During normal operation PCV-135 maintains a backpressure in the i letdown line to prevent the liquid from flashing to steam as it passes j through the orifice valves. (1.0) i 2. During solid plant operations, PCV-135 maintains the pressure of the RCS to the desired value. (1.0) i i i Ref. RGE-16, page 9. Ginna Category 2 answers continued on next page.

h- _~.. c' _] ~ Ginna Category 2 answers continued. Answer 2.05 (2.0) Sodium hydroxide (NaOH). (0.5) a. b. Helps remove iodine from the containment atmosphere. (0.5) Spray additive tank discharge valves open and allow jet educators to c. draw NaOH out of the tank and mix it with spray water. The eductor is supplied from the spray pump discharge and returns to the pump suction. (0.5) d. 2/3 detectors on 2/2 channels equal to or greater than 28 psig. containment pressure. (o.r) Ref. RGE-24, pages 12 and L3. Answer 2.06 (1.0) 1. Diesel engine overspeed. (0.5) 2. Low lube oil pressure. (0.3) Ref. RGE-8, page 19. Answer 2,07 (2.0) 1. An immediate turbine trip generator trip coincident with a failure of automatic bus transfer of electrical buses could.esult in a loss of forced reactor coolant flow if the reactor trips d'e to overpower, overtemperature, or low pressure conditions. This 1oss of flow could make the consequences of the accident more severe thtn that reported in the FSAR. However, if pumping power is lost with a time delayed generator trip, the loss of flow is not considered serious because the reactor has been shut down for a period of time. (1.0) 2. On a major LOCA, as the coolant rushes out of the break, the RCP can overspeed. This RCP overspeed can be minimized with the generator trip time delay by locking the RCP's at approximately a 60 HZ frequency. RCP overspeed could resuli in flywheel destruction, resulting in missiles which could dama;e the containment liner or the ECCS components within the containment. (1.0) Ref. RGE-5, pages 10 and 11. Ginna Category 2 answers continued on next page.

~ {_. Ginna Category 2 answers continued. Answer 2.08 (3.0) service water and component cooling water (o.C) a. b. component cooling water (0.6) c. service water (0.6)

d. bNd'4[c$N
  1. (0.6) e.

reactor makeup water (0.6) Ref. (a) RGE-51, pg. 7. RGE-28, pg. 4 (b) RGE-28 pg. 4 (c) RGE-36 pg. 4 (d) RGE-51, page 7; (e) RGE-14, page 9. h P(IO 33ct3 - /25 0 Answer 2.09 (2.0) 1. The loss of coolant (LOCA). (0.5) 2. The rod ejection accident. (0.5) 3. The secondary steam line break. (0,5) 4. A primary to secondary steam generator tube rupture. (0.5) Ref. RGE-27, page 3. Answer 2.10 (2.0) 1. A signal indicating that the boric acid storage tanks levels have decreased to 10%. (0.5) 2. If either valves MOV 826 A and B or valves MOV 826 C and D have not started to open five seconds after the SI actuation signal, a signal vill be sent to open MOV 825 A & B. (0.5) Ref. RGE-26, page 13. Ginna Category 2 answers continued on next page.

Cinna Category 2 answers continued. Answer 2.11 (2.5) 1 steam flow venturis (0.5) a. overpressure protection of the S/Gr steam dumps. (0.5 each) l b.

1. plant cooldown without the condensor I

j c. 1. instrument air pressure (0.5 each) 2. spring pressure REFERENCE RGE-40 pp. 5-7 i, i i i t i 4' Answer 2.12 (1.5) (0.5) The nitrogen backup system will The valve should remain open. automatically cut in when the instrument air pressure drops below the (1.0) nitrogen pressure regulator setpoint and hold the valve open. 4 i I I 1 l Ref. RGE-45. page 4. i f Answer 2.13 (2.0)

a. service water (cat' (c. T 3 )

(0.33) auxiliary condensate storage tank (o,34) spoolpiece to firemain b.1. normal auxiliary feed water pump breaker closed.(GMT (0,33) l f

2. Associated standby pump suction valve closed _UlE7-lo,33)
3. Associated normal auxiliary feed pump breaker racked out M(o, W) 5 Ref. RGE-42, pages 7 and 8 j

l Answer 2.14 (0.5) 1 t I Low vacuum trip. t J Ref. RGE-49, pages 10 & 20 and logic diagram sheet number 3. t I J End of Ginna Category 2 answers. 1' l --me--yr,-,---, .,,e--,,, .,,am m.,,,.,,e.,-, w ,,.w.n.,-s ,,g,-,e, 7,w-e mm-..- ,e,n.,,,mg----.e.,,--~. .w,m--,,.-m-,

v, e 3. Instruments and Controls (25.0) ll ANSWER 3.01 (2.00)

a. By using steam pressure as a steam flow signal
  • conditioner' b.

lower and stable (0.5) As actual steam flow begins to increase. the steam / feed mismatch signal remains zero. The actual and indicated water level start to drop until the actual /progran. lovel mismatch signal opens the FWRV. Conditions stabilire when the resulting feed flow / steam flow error is offset by the actual / program level error. (1.0) REFERENCE RGE-44 Pg* 5 Answer 3.02 (3.0) He should set the steam dump mode selector switch (SDMSS) to the a. MANUAL position and controller HC484 to AUTO and set to control the pressure at 1005 psig. (1.0) b. 1. With the SDMSS in MANUAL, place HC484 in AUTO and lower the pressure set point. (1.0) 2. With the SDMSS in MANUAL, place HC484 in MANUAL and adjust the balance knob to get the desired cooldown rate. (1.0) Ref. RGE-45. page 10. Answer 3.03 (2.5) 1. Reactor trip (from trip breakers). (0.5) 2. Manual pushbutton on the operator's console. (0.5) (0.5) 3. Trip of all main feedwater pumps. (0.5) 4. Generator trip. (0.5) 5. Trip of all circulating water pumps. Ref. RGE-49, pages 9 and 10. Ginna Category 3 answers continued on next page.

Ginna Category 3 answers continued. Answer 3.04 (3.0) a. OPEN (0.5) b. CLOSE (0.5) c. CLOSE (0.5) d. CLOSE (0.5) e. CLOSE (0.5) f. OPEN (0,5) Ref. RGE-44, Pages 5, 9 and 10 and drawing RGE-CD-7. Answer 3.05 (2.5) (Any 5 at 0.5 points each) 1. Motor driven AFW pumps. 2. Charging pumps. 3. Boric acid transfer pumps. 4 Service water pumps. 5. Containment air recirculation fans. o. Pressurizer backup heaters. G e w<rekor-

9. Led e wn Or;$~ Die se l 7 Gesse+cy te. (so lcth% vslve S Ref.

RGE-54, page 4. RGE-9 (g I6 Ginna Category 3 answers continued on next page. l r l

(- }'- Ginna Category 3 answers continued. Answer 3,06 (3.0) F' ccv. ec. Mcv F l 4 i o = RHR Hx DA l l?l n I _a c _ _ _ _. i mr Fcvb )( The following credit will be allotted to the sketch. 1. A control valve (HCV) appears in the discharge line from the RHR Hx. (0.5) 2. A control valve (FCV) appears in a bypass line around the RHR Hx and the valve nentioned in (1) above. (0.5) 3. A flow transmitter (FT) is located downstream of both of the above valves and its signal must connect to the bypass FCV. (0.5) The RCS cooldown rate is controlled by a valve downstream of the RHR Hx which adjusts the flow rate through the Hx. The total flow rate is maintained constant by adjusting the bypass flow rate around the Hx by adjusting the position of the flow control valve in that line. This valve position is controlled by a signal from a flow transmitter downstream which measures total flow rate. (1.5) Ref. RGE-25, page 12 and drawing RGE-RHR-3. Ginna Category 3 answers continued on next page. t l 1 i I \\

Ginna Category 3 answers continued. Answer 3,07 (2.5) ( Any 5 of the following for 0.5 points each) L. 1/2 IR > 20% power. 2. 1/4 PR > 103% power. 3, 1/4 OP AT 1.71% < trip point. 4. 1/4 OT AT 1.71% < trip point. 5. 1/1 Impulse pressure < 12.8% power. 6. 1/4 PR decrease 2 5% power in 5 sec'. BANK Any rod 5 20 steps with remainder of p 2 35 steps. 7. 8. Tavg - Tavg deviation of t 4 F. Ref. RGE-30, pages 17 and 18. Answer 3.08 (1.0) (0.5) er than. Q a. b. The sam (0,5) Ref. RGE-32. page 5. Answer 3.09 ( 1.0 ) An interlock from a pressure transmitter from another channel closes the PORV when actual pressure drops below 2335 psig. Ref. RGE-19, page 10. Answer 3.10 (2.0)

a. the condensate bypass valve will open (if in auto) (0.5) b.

1. low lobe oil pressure (0.25) 2. oveicurrent (0.25)

3. undervoltage (0.25)
4. 15 psid seal water to suction pressure (0.25) c.
1. Discharge isolation valve closes (0.25)
2. Recire line control valve opens (on low suct' ion flow)(0.2S)

REFERENCE RGE-43 pg.' ll,13,/'l Ginna Category 3 answers cont.inued on next page.

i Ginna Category 3 answars continutd. I 1 Answer 3.11 (2.5) 1-(Any five of the following at 0.5 points each.) i 1. Suction valve open. 2. Suction pressure greater than 185 psig. j 3. Discharge valve closed. I 4. Recirculation valve open. l i 5. Lubrication system operating with oil pressure above a preset value. { 6. Seal water booster pumps operating with seal water pressure 15 psig ] greater than feedpump suction pressure. { 7. Blowdown selector switch in normal. 4 i Ref. RGE-43, pages 12 and 13. t l i i End of Ginna Category 3 answers. 1 I 1 4 I i j i 1 i I i A y ( y 1 1 f i \\ 4 i r 3 +3 s. i i i g f, k -I \\ s ,f () ' ~ s -, 4 <~r --e .ne--.., .-,r.,-, .,n ,y ,e. w~ ,-v-.--

-~ ~ 4. Procedures, normal, abnormal, emergency, a and Radiological Control (25.0) Answer 4.01 (2.0) J Trip the reactor (0.5) by one of the following methods: '- ~ 1. From the control board before leaving, if possible. (0.5) t 2. Opaning breakers at the reactor trip switch gear. (0.5) 3. Actuating the manual turbine trip at the turbine. (0.5) a 1 Ref. Procedure E-5. Answer 4.02 (2,0) a. 1. Turbine runback /Elur-bh, e /d ddo M 2 Tbrhke.% dlokit-runb,ex }c. if > 90fo joow er \\

3. Block of ntomatic rod withdrawal.

-(MW - (2 t'<fb 0' F 'b5 Nj',) / b. To get tird vower and load matched at a reduced power level (about a 20% load and power reduction). (1.0) on 1e li,-l+ Fin p4tng aJ kf dann<l emaens - Ref. Procedure E-7. FSA R 7,7, /,2. /0 i Answer 4.03 (5.0) x (5 at 0.5 points each) a. 1. Control bank at or approaching the low insertion limit. 2. Control bank at low low insertion limit. 3. An uncontrolled' cooldown of. the reactor coolant system following a - reactor trip. (Borate using MOV-350). 4 1 4. An unexplained or uncontrolled reactivity increase. (Borate using l MOV-350). 5. One or more control rods not known to be fully inserted f llowing a reactor trip. i l Ginna Category 4 answers continued on next page.

t w..

.e


..n

f Ginna Category 4 answers continued. Answer 4.03 continued. b. (5 at 0.5 points each) 1. Start either boric acid transfer pump. 2. If condition 3 or 4 above is occurring, open MOV-350. Record time opened and the flow rate on FI-ll3. 3. If any of the above symptoms or conditions except 3 and 4 are occurring, borate with the REACTOR MAKEUP CONTROL at 3 gpm via FCV-110B. 4 Determine the amount of boric acid desired to be added. j 5. Stop boric acid flow and boric acid transfer pump when proper amount has been added or when control rods start to move out. Ref. Procedure E-20. Answer 4.04 (3.0) (6 parts at 0.5 points each). 1. Verify all control rods are fully inserted. Refer to procedure E-20, IMMEDIATE B0 RATION, if all control rods are not known to be fully inserted. 2. If the plant is in a condition for which a reactor trip is warranted and an automatic reactor trip has not yet occurred, manually trip the reactor. i 3. Verify that the turbine throttle, governor ar.d intercept valves are closed. l 4. Verify that the average coolant temperature is approaching the no load value of 5470F. i 5. Verify that the main feedwater valves are closed if their controller is in AUTOMATIC and either Tavg is less than 554 F or S/G level is greater than 67%. J 6. If the main feedwater valves are in MANUAL, exercise extreme caution with feedwater control so as not to reduce the coolant temperature below 547 F or increase the S/G level above 67%. 1 I Ref. Procedure E26.2. Ginna Category 4 answers continued on next page. i l I

ep Ginna Category 4 answers continued. \\ Answer 4.05 (3.0) N a. 1.25 Rem /Guarter (0.75.

b. -3 Rem /Guarter is NOT exceeded. [0.75]

-Total accumulated dose does not exceed 5(N-18). [0.75] - Accumulated e::posure on record (NRC-4). [0.75] (2.25: REFERENCE 10 CFR 20 ANSWER 4.06 (2.00) a. Positive reactivity insertion due to boron removal (0.5) b. large pressure transient could result when starting a RCP due to large temp difference between the RCS and S/G. (0.5) 70 c. f( GPM (0.5) prevents channeling of demineralizer resin (0.5) REFERENCE a. 0-1.1 step 5.7.1 c. step 5.9 c. ICE-1; i F-3 $4p 2, 2, T ,q. Answer 4.07 (1.0) 5 cps. Ref. Procedure 0-1.2, page 6. Answer 4.08 ( 1. 0 ) A low steamline SI would occur at a steam pressure less than 514 F if the RCS pressure was greater than 2000 psig (SI auto unblock setpoint). Ref. Procedure 0-1.1. page 22. and RGE-35. page 24. Answer 4.09 (2.0) 1. Tank has been isolated and sampled. (0.5) 2. Waste release form. (0.5) 3. Circulating water pumps operating. (0.5) 4. The liquid release monitor is operable. (0.5) Ref. 5-3.4K pg. 1, T/S 3.5.4.1, 3.9.1.la, 4.12.1.la Ginna Category 4 answers continued on next page.

Ginna Category 4 answers continued. Answer 4.10 (3.0) (any one for 1.0 point credit.) a. 1. High leak-off flow rate from the no. 1 seal. 2. Low delta P alarm for the no. 1 seal. 3. Low labyrinth seal delta P. b. (any one for 1.0 point credit) 1. High standpipe level. 2. Low no. 1 seal leakoff flow. c. Low standpipe level. (1.0) Ref. Procedure E-23. Answer 4.11 (1.0) 2, 1, 3. Ref. Pro.cedure E-1.4 pages 4 & 5. End of Ginna Category 4 answers. I l l l

{.- n. At h ckaw d 2_ n : STER U.S. NUCLEAR REGULATORY C0f911SSION SENIOR REACTOR OPERATOR LICENSE EXAMINATION Facility: GTNNA Reactor Type: pwn_wre? Date Administered: 11 /11/85 Examiner: o.w. Burke Candidate: INSTRUCTIONS TO CANDIDATE: Use separate paper for the answers. Write answers on one side only. Staple question sheet on top of the answer sheets. Points for each question are indi-cated in parentheses after the question. The passing grade requires at least 70% in each category and a final grade of at least 80%. Examination papers will be picked up six (6) hours after the examination starts. % of Category % of Candidate'c Category Value, Total Score Value Category 2s o 2Lp 5. Theory of Nuclear Power Plant Operation, Fluids, and Thermo-dynamics 25.0 2 L 0. 6. Plant Systems Design, Control, and Instrumentation 2s_o M 7. Procedures - Normal, Abnormal, Emergency, and Radiological Control 25_0 25.0 8. Administrative Pro-cedures, Conditions, and Limitations 100.0 Totals Final Grade All work done on this examination is my own, I have neither given nor received aid. Candidate's Signature J

v S. Theory of Nuclear Power Plant Operation. ~ Fluids, and Thermodynamics (25.00) Question 5.01 (5.0) A reactor whose reactivity information is given in figures 5.1 through 5.4 has been operating at 1007. power for four weeks when a reactor trip occurs. Assume that the reactor is near BOL, and that the boron concentration is 900 ppm. Just prior to the trip all rods are all the way out except for bank D which is 165 steps withdrawn. Assume that boron worth is 10.0 pcm/ ppm, Beff = 0.007, and 2 =0.08. a. What will Keff be immediately after the reactor trip (assume Tave is at T no load)? State all assumptions, show sources of numbers and show all calculations. (2.0) b. On a restart four days af ter the trip you wish to go critical at 100 steps on bank D. What is the required boron concentration? State all assumptions and sources of numbers and show all calculations. (2.0) c. If the reactor is just critical at 10-8 amps on the IR range with bank D at 100 steps, what new bank D position would be required to obtain a stable startup rate of 1 DPM? Show all work. (1.00) Question 5.02 (2.0) Explain why a dropped rod, when operating at power, could be worth approximately 200 pcm and the same rod stuck, on a reactor trip, could be worth 1000 pcm. S.e 3 OUESTION.svet-(3.50) Indicate the direction and reason for change in the following parameters ~ ~ during a plant load increase. Assume control rods are in manual. Also indicate why reactor power stabilizes after the load increase stops. Main steas flow Main steaS pressure Natn steara t e p.p e r a t u r e (Tstm) Delta T (Tave - Tsta.) Tave Reactor power gev QUESTION 5++t (1.00) A reactor operator adds 0.0001 delta Fik to a critical reactor at 00L and then adds the same amount of reactivity to the same critical reactor at EOL. How will the SUR at EDL compare with the SUR at 00L (greater than, same as, less than). Briefly explain the physical reason for your answer. No calculations are necessary. Category 5 questions continued on next page

3. VB

+ QUESTION M (1.50) t - 1 y Each of the following accidents occur at 50% power and EOL. Would the severity of each accident (length of time spent at high power) be HORE SEVERE, LESS SEVERE, or NO CHANGE compared to the identical accident at BOL conditions. Consider only the effect of MTC, consider each accident separately, and make no allowance for automatic protective action. a. Main steam line break. (0.5) b. Total loss of coolant flow. (0.5) c. Rod withdrawal accident (starting from the intern.ediate range) (0.5) 6.06 00ESTION 4-44 (3.00) A reactor can be considered as having an upper region (re31on A) which is rodded and a lower region (region D) which is corodded. If such a reactor is allowed to achieve Xenon equilibrium, then rods are completely withdrawn while maintaining constant power and temperature, enplain the sequence by which a Xenon oscillation may be started. Your de=cription need only include up to wher e the flux changes direction for the first time. Question 5.07 -(2.0) In order to prevent overheating the fuel, the reactor is operated such that the point of DNB is not reached (DNBR > 1.3). Since the DNBR is not directly measured, what four primary system parameters do you, as the operator, monitor to assure that DNBR is greater than 1.3,. Question 5.08 (2.0) a. Find the enthalpy change in an isentropic expansion of steam through a turbine into a condenser (Note: Entering steam is 100% quality at 825 psia. condenser pressure equals 2 psia). Explain how you arrived at your solution or show your work. (1.5) b. How would the change in enthalpy in part (a) be affected by a less than ideal turbine (i.e., some degree of inefficiency)? Select one of the following answers. (0.5) 1. increase 2. remain the same 3. decrease 5707 OUESTION M (2.00) How would the following occurances most 116ely affect established natural circulation flow (help, hinder, no noticeable effect). Briefly explain why. a. S/C levels fall to low in the narrow range. (0.5)

b. S/G 1evels are rapidly increased from below the narrow range level indication into the normal operating band.

(0.5)

c. Just prior to initiatin3 RHR coolin3, a S/G atmospheric relief fails open.

(0.5) ~ d. Pressurtzer pressure increases from saturation for Thot to 100 psta greater than saturation. (0.5) Category five questions continued on next page

7, t Ginna Category 5 questions continued. Question 5.10 (3.0) Refer to figure 5.5. Determine the purp head and the system flow rate with one pump a. operating and with all valves fully open. You may mark on figure 5.5 if you desire. Show all work. (2.0) b. What will the pump head be with both pumps operating, with valve number 4 open and valves 1, 2, and 3 closed? (1.0) End of Ginna Category 5 questions. 4 L

~ U.S. NUCLEAR REGULATORY COMMISSION IN TEGRAL CONTROL BANK WORTH VERSUS STEPS WITHDRAWN WITHOUT OVERLAP (BOL AND HZP) 2200-6 B 2000; y\\ g T \\ \\ 1800 i( i

1000, g

,O i / 'l _c 41 \\ g it.00 w g t4'N \\ 5 -~~A t 1 ~,~ 'l I \\ \\ 5 / h 1200-hg h "k ~ e _. y x s s 1 C \\ IT 1 S ~ '\\ l A \\ g 1000 3,,g g E T i\\ '\\ y 4, 3 4 A. g ) M \\ iT \\ i \\1 \\ j T \\ \\ N N ( 600 g y g l '\\N\\ NNN WX 400 gx AN 1 MN '\\%,q c 200 i ' N -w .m 0 0 20 40 60 80 100 120 140 160 180 200 220 240 i Steps Withdrawn I l' i' l i FIGURE 5.1 I


r-

1. _.- _ __ -

-. = -. 4 i l U.S. NUCLEAR REGULATORY COMMISSION 1 INTEGRAL SHUTDOWN BANK WORTH VERSUS STEPS WITHDRAWN i (BOL AND HZP) 1 f ( I i a i i i 1 j 32m i / s, V ( 2s00 I \\ i t E \\ 1N y 1 \\ E 1 o t 3 i 20m o i 5 \\ e t 3 o g 2 1600 5 h i T( 1200 \\ l , d s, ( J, \\ 800 N N s ( \\ < l i 400 j %m w 4 N.%m Y?} % m i 11 uiT W-- 0 20 40 60 80 100 120 140 160 180 200 220 240 i Steps Withdrawn I t i PIGURE 5.2


w,-,.

-= v e -r w - .we--------=----

0 - (.,._1.. _. y.; ~. __=...c v.-... g -,l ._.. _Y. N - _i _ _ ___. __\\ "._N _ t; ,g. \\._ y\\ H\\ _:..\\ \\-.N

r. _ w._ x

\\'-\\, - _ i ~ -N % \\hW-x '4 i ..l W _x \\~A \\~::_\\P_L\\ i_.i = X. i \\ \\ \\. \\__-- Y

-s

-x C* - m c. -i 'i x _A. g-X ,,u ^\\ \\l c 1000 t-v s .x g X '.. i. i. DQL c i: "\\ \\t:=.A o 's _ w ___\\ \\ Q \\=_ \\

\\

N-- ' 1500 ppm 5 x - x.

N-. _

y -.;g g_ _. -\\ i. .p' g g

b..i \\.

x. 1200 ppm x-\\. L\\--- ti= 1-X 900 ppm \\ .x i .A MU\\ \\ _'\\ - x4 _ - _\\ 1500 g Note: Does not include flux

g redistribution allowance

_t.\\:_ _ --l_-. 4\\ _ i. .4 g .._._. g..,g _ - - \\-(=_\\~_: _ _ -!-,_4._ [.O( Q .__._.L.. ,z___.__;__..___ -. =;, 300 ppm .... -, - _-3 -.. -t _-- _ e._. - q._.. y a.=: * \\ .i -- - - - - - r- --. ___ :.:b t= ;::

=12\\-

.L _. - _.____..__.,-------t::--- -.. - _\\:.:. - l =::.=..u....:.;;;n.:.:c.1.l..:=.1:-- --- i- : --6 ... :...:. _ ::._n= n _:: -- t - .u - : l_ - -+ ........ g.. =. ;. 4 ......... _. hq ] _...,... l..... F,,..,...,=._..,.;.;._._ :: O ppm ...l._ 1900 0 20 40 60 80 100 Power (percent of fullpowerl EIGURE 5.3 1.

I i X 7 6.0 I O i 100% Power c'_ @2 m gm .c -50 I t 'g ' n \\

  • 2 8 y

f 75% Power 3 ,=, b .l 1 m g -4.0 l p -y2 i II n u O k D r-m. ho C q gQ m a e /- -}%h,% - +- 4 m 80 2 -3.0 a gg b h .mL (( fbb. \\ - k .I. o( o k .i 'l!l lll!.' 50% Power hh $g E l j 2.0 g 4 i ,y ! l' h

a O

g'yj- -j ;; ll hg l 2 d l Alla. l -T e. hl f<.l (fyf f !;q, I 10 Fh j l N i ' h :; f h,!. y D: l l O e ,d .)bl I l S}- I lo I I g l f l l! E hb b n, 0 10 20 30 40 50 60 70 80 90 100 Time Atter Plant Trip thours! r

.~ i i ASSUMPTIONS: 1. The two pumps cra idertical, c;ntrifugal, conntcnt cpeed pump 3. 2. The friction pr=suro losse3 through the linos, ep:n v21v20 check valves, and flow meter are riegligibic. 3. Heat exchangers numbers 1. 2. and 3 are identical. F' Low o ) -O-e e 2. ,,, 3 it. C ' l ' - )*E-i $-1 X4 HVAl 4 8x l Rx Ks Us ) et 1*2 93 l O o o' 1 J V s.A i VN HV4t4 s .+ ....,__a,.__. __u..... ._.._... __.t. _....w... ?, _...t_.. u _ _r__. _v _.. s _~, . _.. _ _ -_ 1._._ _ ,....... _... _ _._.s__._ w __- ._._.r_...__._........ ._. s._ _. 9.00 . s _..._ ..1._. ..._~..__.p__. __ i ...._..i.- ..m.. t ... _s._ s_ _ __._..._..,_w.-.... %_ _ _--_. s._. = -. .w._ _a _. _-- pw . r_ __ _. _.. _ _ _._...._.e_._._. _.._._4._...___; ___.r _. __._

t. _--_,. _._.

.il i_ ._m_. -. j _.._- _ .. _ _. _.___._.1--_._.. _ -_ t

y_ _.... r._ _

_.. _ -_s_.-. L 1@ - s- _ /..... _- _-_q__.._,._-. _ 3. _._ __a __._t___.__,. ......u 1 h ...4 . - _._ L. __,_i.__ I._ E._.-.... _ i ___ - -= )o'- ___. _ x. _= ~ .. ~ ti-.120 2 u._ _ t _ _ _ _ n._., _-__ t.__ = - -, -_..., _ - - --i-- = 103 __.__._.i__. . -+

m..

.._.c.a_ /. .__._c._._.. - _.i .t___ _,i _ . _i _ ... _ _4. ......._a. EAD-CAPnCITY CUL ...r _ c._.___....p___..._. i _.....s_..r._... 3 _.....s... _,._.h.\\___ ....1____.. ___ _ t.... p_ _. . =., BOTH PWS COBIN8 ..... _.._..s......_.-._

t...

...........i.._............ _... ...._r..-_._ i ....i. ......i..... 10 3... ..........t-.... .i. ...._.1...._...___ ..t..t.. 20 t... .n. t., _........ L..., i.. i i..., t. 20 10 CO 20 103 120 11 0 IE0 150 20') 220 21 0 200 Cf?ACliY Kim FIGRF 5 6

6. Plant Systems Design, Control, and Instrumentation (25.00) Question 6.01 (2.0) List four interlocks or conditions which must be met to allow the operator to open the letdown isolation valve (A0V-427) from the MCB? I Question 6.02 (1.0) What is the maximum allowable letdown flow rate and what is the reason for this limit? Question 6.03 (4.0) Refer to figure 6.1 Indicate the valve positions [open, closed, or modulated (partially a. open)] of valves FCV-110A, FCV-110B, FCV-110C, and FCV-lit for the following positions of the makeup system mode selector switch: 1. BORATE (1.0) 2. DILUTE (1.0) 3. AUTO (1.0) b. If the normal immediate or emergency boration path is not available, what alternate path would you use? (1.0) Question 6.04 (2.5) List the emergency diesel trips that will protect the diesel engine when there is no SI signal. Identify which of these will trip the engine with an SI signal present. Question 6.05 (2.0) Describe the breaker and relay actions that take place when the main generator trips. Question 6.06 (3.0) on figure 6.2, circle the valves that immediately receive an automatic signal to operate when a Safety Injection Actuation occurs. Also place an "O" or a "C" adjacent to the circles to indicate whether the automatic signal is an "open" or "close" signal. Assume that the plant was initially at the normal full power condition. Ginna Category 6 questions continued on next page. l

.}; Ginna Category 6 questions continued. Question 6.07 (1.5) What control actions utomatically occur as a result of a containment spray initiation signal (P signal)? 4.09 OutsTION w (2.50) List two safety related reasons for delayin3 the main senerator trip for approxtmately 60 seconds fo110w m3 most turbine trips. Question 6.09 (3.0) Relay 20 can be called the condenser steam dump arming relay. Two permissives and an arming signal are required to energize relay 20. List the two (2) permissives (include setpoints and coincidences where a. applicable). (1.0) b. List the three (3) arming signals, any of which will, in conjunction with the two above permissives, energize relay 20., Include setpoints and coincidences where applicable. (1.5) What operator action should be taken after the condenser steam dump c. valves close following an automatic dumping action (Relay 20 has been energized)? (0.5) Question 6.10 (1.5) Following a reactor trip, the recorder trace of one of the intermediate range detectors levels out at 10'9 amps: Is the detector likely to be overcompensated or undercompensated? a. (0.5) b. What is the compensat#.ng voltage used for? (0.5) What additional operator action will be required in the above case to C' complete the shutdown? (0.5) Ginna Category 6 questions continued on next page.

Ginna Category 6 questions continued.

l.. Il GUESTION M (2.00)

Ariswei the f oll ow irig ques t t orit regarding the 01 Delta T trip

  • a.

Indicate whether the OT Delta T setpoint will t ric r e.: e. dr crease, or not change if the fol'owin3 changes occir. Consider each charige t rid ep e nden t l y. Drtofly jostify e a c h a n a... r. 1. The pressortzer spray valve f a t ls opers. (0.5) 2. A ri overdilution of the FCS occurs wtth rods to manual. (0.5) 3. An overdilution of the RCS occurs with rods t ri auto. (0.5) b. Orrefly describe ' lead-lag compensation

  • cod list which 01 Delta T c r i ; -- - - * ' - > is/are affected by tt.

(0.5) .spd p6rmmefer$ End of Ginna Category 6 questions.

i .O HOLDUP TANK LETDOWN LCV-ll2 A k (FCV-IlOC (AN rr lit to MAKrup vCT del WATER ' DFCV-Ill V:cVit3C ls Y1&g ~." "$NE4 Il ,cy,jo, aLENOcn nWST % 3 CHEMICAL %FCV-IIOA j MIXtNG TANK 1 P J L ,.s V lZ (3 ,T 80RIC h ACIO h S8CT" TANKS 'E t () f 350 e & 2 CHARGING FT PUMP ll3 eORIC ACIO PUMP O MAKEUP CONTROL SYSTEM RGE-VC-6 "'"~ ' V I S U R E (p. I L

h en c: C. 'g t G w O JL7! ncerne tua ' T q-s.CCur.uAron

P 3 bd 3

ptc N.e. p g-I4 bl(" g 3 DEMLi4G ] ersi na ;l tis-M~L ^ ".'i__t { sNd!$E J(9 ' ft ,,} j i,,P]37"" a)z,o e(,x1 t= o = a ^ '4"x ceta tto ['l"t [a-M i-1-r

  • OM

('t .3_I., i c i-cocaE { /,- OfGriA X h,, N t,'2c3 ,,,,3 e 34 19 " ^ l' ['n' g 41 IH 1 I 'I ' IgI~f uroc c 3 El ty al ril -4 >- cocoF,8 IfI['

  • - O n!. m y e25o t Co, 3

^ ~st 1801 L E G d 4{ Q g*gygg gE 10tSAltth s su0t* A y_g,} ,, g.. g,,. l y... ~ g ,9 b 0700 0003 C A x V r-D 181 bC2A j ~' !.118 AY h g, o g' '2 ACCU'JtA.ATOR llaADER44g" CC00 () CCOA v IfCV 03tA 30 I () 073A \\ IICV g.- DEACTCP

  • 3 RAY y

t4 --(M 03C0 Ai,it 4 TIVE 'll. _g@_ e CELuDGE 0C00 IANX hr 03fn 073C g_ g,,f !,I1aA) ^ OGOC g I'l l t lit ^!!CR ~ 000U ECDD 1. U "~ M ^ TnO -6 3 - 8573 c57c spgggy uur /< OS TA C I--tJM \\ ({fg} M -l l e-CDt81 s %1 IDiC0 le us. A SUur '~ ~~ ~ 852D4 C [j)(88S? ^ Ft 15 ~~ CCW llCV-G25 h g) g fl} 2G I Il *i/ l I It I Cot.o ue ;j,-f'j, tryg. n i 709A t:9'A

p*(

'" "i "* } 700C .h OSIA m-x

li nc.er, 05:nra 8 -i l -

as to ll0V-C24 Q'l-Ik""'Fnot.1 O ih4A 'E,Il ItCV-13 )(l y' sti!It itx 3 -'ot A LOOP -M . g l)i - I d' T 700 I!OT s t C g g3 j 7030 g I h

@.ty

r i '"I" DCf T Il CCW ccw O 1 etw 8 _ _ tl3 - !220 i

5 oft }

vi 9 j

l 1 4 i 7. Procedures - Normal, Abnormal. Emergency, i and Radiological Control (25.0) i i j Question 7.01 (3.0) i j According to procedure E-5. Control Room Inaccessibility, what are the j emergency stations and primary responsibilities of the following j personnel: j l a. Shift supervisor j b. Head control operator j c. Control operator i d. Primary side auxiliary operator. i ) Question 7.02 (3.0) i j In accordance with procedure E-1.5, VOID FORMATION IN THE RCS, there are j six symptons that indicate a potential approach to inadequate core cooling. List these six symptoms. Question 7.03 (3.0) j a. In accordance with procedure E-20. IMMEDIATE BORATION, list the two i synptoms or conditions that require immediate boration by opening { MOV-350. (1.0) 1 1 b. What four icnediate operator actions are required in response' to the above symptoms or conditions? (2.0) Question 7.04 (3.5) What are the required icm:ediate operator actions in procedure E-26.1, i REACTOR TRIP-TURBINE NOT LATCllED7 ) Question 7.05 (3.0) t What is the intent of or what is to be accomplished by the implementation i of the immediate operator actions of E-37.3, SPENT FUEL ASSEMBLY OR R0D j CONTROL CLUSTER DROPPING OR COLLISION WITH ANOTHER OBJECT? I j 7,06 t OULSTION .2 A+ (3.00) J l Answer the following questions regardih3 RCP operation! j a. Why should the RCP 41 seal bypass valve never be opened during a loss of seal anjection cacuoIty while operating at power. .4-e n (t,2.) j b. Under whit,jenoral plant condittore and for what purpose is the RCP l 81 seal bypass valve used? LL Gt ( h 2.) j c, Why i s con t a r.n.=d RCP oper a t ion w i thout sea l injection flow j utide s i r e a bl er ) f.A4r(0,6) 4 e '_' i d v o n expect the following indications to change (increase, l decraase, no cuong, T -*rm .i inss of seal injection flow) j l. Il su' d of f t e m p e r.i t u r e ( 0. r., a di ) 2. Il, wof f flow (0.25)

i Ginna Category 7 questions continued. 7.07 oVFSTION JLaMF (3.00) l Aris w e r th? following questions regarding a LOCAL RADIATION EMERGENCY. a. Under what conditions may a radiological incident be classified a LOCAL RADIATION EMERGENCY? (1.0) b. Where should personnel in the effected area go after betn3 monitored for contamination? (0 5) c. What are the responsibilities of the on-duty Shift Supervisor after returntn3 te the control room a r.d evaluating plant conda t tores? List three out of a possibic four. (1.5) Question 7.08 (3.0) In some situations, during a radiological emergency, certain individuals are allowed to receive doses greater than the normal exposure limits. For personnel participating in the following situations, what is their maximum allowed dose and who authorizes their participation? Members of survey teams and those assisting in personnel a. decontamination. (1.0) b. Life saving actions such as the removal of an injured person and providing first aid, ambulance service, or medical treatment. (1.0) c. Performing assessment actions or undertaking corrective actions to prevent substantial loss of property. (1.0) Question 7.09 (0.5) Under your emergency plan, who may relieve the Shift Supervisor as Emergency Coordinator? End of Ginna Category 7 questions. [

{- \\ 4 8. Administrative Procedures, Conditions, I and Limitations (25.00) Question 8.01 (2.5) By definition, containment integrity exists when five conditions are met. What are they? Question 8.02 (2.5) What are the following reactor trips specifically designed to protect against? a. Power range high flux-high level trip. (0.5) b. Low pressurizer pressure. (0,5) c. Low RCS flow rate. (0.5) d. High pressurizer level. (0.5) e. Low-low S/G water level. (0.5) Question 8.03 (2.01 Ginna Technical Specifications limit the allowable RCS leakage rates. In the specific case of RCS leakage into containment, list four methods that could be used in detecting the leakage: Question 8.04 (3.0) In order to meet the Tech. Specs. pertaining to the capability of supplying boric acid to the RCS, three flow paths are required. Describe these three flow paths and their sources of boric acid. Question 8.05 (2.0) In the basis for power distribution limits (T.S. 3.10.2) the following statement is made: "For normal operation, it is not necessary to measure the hot channel factors. Instead it has been determined that, provided certain conditions are observed, the hot channel factor limits will be met." What are these 4 conditions? Ginna Category 8 questions continued on next page.

Ginna Category 8 questions continued. Question 8.06 (1.0) Ginna T.S.3.7 AUXILIARY ELECTRICAL SYSTEMS. requires that 10,000 gallons of Diesel fuel is available. What is the basis for this requirement? Question 8.07 (3.0) What are the three provisions under which temporary changes to written procedures can be made according to Tech. Specs? Question 8.08 (1.0) What additional safeguard (s) are required by Tech. Specs. to prevent unauthorized entry into a HIGH RADIATION AREA with a radiation intensity of 12K rem /hr. as compared to one with 900 m rem /hr? delOt' A 9.04 OllESTION M (3.00) Answer the following questions regarding the release of radioactive effluents. a. What three Tech Spec conditions e.ust normally be n.et prior to or during a batch radioactive waste release? (1.08 b. What two Tech Spec condittons must be siet dorteig a g a r.eou s waste release to the plant vent? (1.7) Walo GUESTION M (3.00) A n '. w o r the following questions regarding refueling operations! 3. What is the Tech Spec limit on shutdown seargin for being in the ref ueling mode ar d whet is it's basis? (1.0) b. What are the requiresients for source range NI's during refuelin3 when core geometry is being changed? (1.0) c. What is the objective of the Tech Spec requirements durin3 handling of irradiated fuel assembites in the operating floor ares of the of the auxillery buildin39 (1.0) A he Question 8.11 (2.0) 1 Af g,g M, he sequence of steps in procedures may be changed if any one of two criteria are met What are the two criteria? 4 WM It'Aby O afn>erAsin.l el e hs pe -Tief r e End of Ginna Category 8 questions

i 18 /o

  • A(x) = A e4 8 ici = 3.7 x 10 d

g og o - 1 x 10 5 agfer M = 1/(1-k) = CRg K W y = - 1 x 10 3 AK/Z voids N(t) - No e-AT o K l 8r= (Lg+L ) ($ rod)2 a ag = - 1.0 x 10 4 AK/%'l ((avg) l K n - v/(1 + d) ap = -4.5 x 10 4 AK/% power K P = I ( v/(3.7 x 1010) I(t) = Io e-At x = (a-p)/Ap ~ Tl/2 - An(2)/A T = 1/p + (8-p)/Ap i Cp = (CP ase) (Ks) (K ) t= 1/(p4) b A v=Vg + xvtg 2 + ha - hr - hL=P2 + g2 + Y? pg + Zi + V1 u = zhs + (1-*) hf Y 2g 6 2g S = xSg + (1-x) Sg = (AP )jj gV l 2 (Apg) 1 in = 2.54 cza 1 gal. - 3.785 liters "'~ Q = HCp At 1 kg = 2.205 lb i D 2ge N = pao /A f = 64/Re 17.58 watts = 1 BTU /ata 1 psi - 6.895 Pa I (0 OC) p = k(eff) -1 1 psi - 2.036 " Hg0(G4C) K(eff) 1 psi = 27.68 " 1 = CR1 K(eff)2 i =.0071 H CR2 1-K(eff)1 A = 2 x 10 5 see Q = hah Ad = 12.5 Q = UAAT RR = I fth f A = 0.1 SCR = S 1-Keff 2 ht = kmV p=0 p. p, ggSUR(t) 37 + g SUR = 26.06 t Reactor thermal power = (h -hg) x steam flow rate 2 e /t K= 1 t P = Po 1p

_ 7 l S. Theory of Nuclear Power Plant Operation, 1 Fluids and Thermodynamics (25.00) } Answer 5.01 (5.0) The things affecting reactivity immediately after the trip will be rod a. ) position changes and the power defect. All rods except D bank go from all out to bottomed positions and bank D goes from 165 steps to bottomed. The j rod worths are as follows, from figures 5.1 and 5.2. i rod bank worth (pcm) { SA -3050 (0.1) SB -1000 (0.1) A -1250 (0.1) { B -2030 (0.1) i C -1220 (0.1) i } D (-1465 + 100) -1365 (0.2) (165 steps wdn.) i i TOTAL ROD WORTH INSERTED -9915 (0.3) l From figure 5.3 read the power defect as -1350 pcm at 100% power. This i means that a + 1350 pcm change occurs after a trip. (0.4) Total reactivity change = -9915 + 1350 = -8565 pcm (0.2) 1 a Keff = 0.9211 (0.4) = j 1-f 1 - (.08565) 1 + 0.0856 1 b. RODS (from figure 5.1) I D bank position remaining worth before trip + 100 pcm. j D bank position remaining at ECP + 500 pcm. 500 - 100 400 pcm dilution required. (0.5) = { Xenon reactivity (From figure 5.4) l equilibrium value at trip -2650 pcm } value 4 days after trip ,00 pra - O [*ceus 2650 - %o %+265FO cm added (must borate) (0.5) = t Ginna Category 5 answers continued on next page. ) u I I

j Ginna Category 5 answers continued. Answer 5.01-b (continued) Power Defect (from figure 5.3) +1350 pcm added (must borato) (0.25) MCD 3 Coo 1350 + h - 400 = W pcm reactivity reduction required. (0.25) 360 2700 pcm =h ppm boration required. (0.25) 10.0 pcm/ ppm 360 1260 900 + h = M ppm (0.25) New boron concentration = c. SUR = 26/t 26/t; t e 1.0 26 sec. (0.25) = 6 f' At & 1 .007 .007 f=(.08)(26)+1 .00227 or 227 pcm (0.25) = = 3.08 From figure 5.1, find D bank position for a worth of (500 pcm - 227 pcm = 273 pcm D bank position would be about 130 steps. (0.5) Reft Energy Training Corporation (ETC) er.anual on Reactor Theory - Chapter 4, page 29 - Chapter 5, page 61 - Chapter 6, page 12 - Chapter 7, pages 19 and 41. Answer 5.02 (2.0) When a rod is stuck out with all other rods inserted, that rod is exposed to a much higher flux than the flux in the rest of the core. Because rod worth is a function of the relative flux dif ference between that adjacent to the rod and the core average, the rod could be worth about 1000 pcm, which is mt.ch more than normal. (1.0) If a rod is dropped, while the rest of the rods remain out, the opposite to the above happens. The flux is depressed adjacent to the dropped rod relative to the flux in the rest of the core and so the dropped rod could be worth about 200 pcm. (1.0) Ref: ETC Reactor Incorv Manual, Chapter 7, page 19. Ginna Category 5 answers continued on next page.

F 1 Ginna Category 5 answers continued. Answer 5.03 (3.5) 1. Turbine control valves open wider thus decreasing the resistance to steam flow which causes the mass flow rate of the secondary to increase and steam pressure to decrease. (0.5) 2. Since the S/G is at saturated conditions, a decrease in pressure will cause a decrease in temperature (Tstm). (0.5) 3. Lowering Tstm increases the delta T across the S/G U-tubes, thereby transferring more energy from the primary coolant. (0.5) 4. As more energy is removed from the primary, Tave decreases. (0.5) 5. As Tave decreases, positive reactivity is added to the core by MTC, and reactor power increases. (0,5) 6. The system will inherently reach a new steady state through the actions of the HTC and fuel temperature coefficient of reactivity. (0,5) Ref. ETC Reactor Theory Manual Chapter 5, page 11, page 19 and page 38; also manual on Thermodynamics, fluid flow, and heat transfer, Chapter 8, pages 17 and 28; also from the same manual, Chapter 9, pages 6 and 22. An3WER X 9,ot (1.00) SUR at EOL wall be jrtater thar. SUR at Bow (0.25) because beta-off becomes less at ECL (0.25) due to the bvaldup of 00-239 arid Po-241 (o.5). Ref. ETC Reactor Theory Manual, Chapter 4, pages 12-18. DI ( 1. M # Apptp M a. more severe b. less sev.? r e 4 c. le ss sevore f i i I Ref. ETC Reactor Theory Manual, Chapter 5, page 30. Ginna Categorv 5 answers continued on next page.

i. 1 Y Ginna Category 5 answers continued. ANSWER WSM v3.00) 1. Fivn increase tn r e g l e r. A bort out Xe-135 faster than it is being l produced by I-135. For const..it recctor power, this causes a net j shaft in flu < f r o a. regiosa D toto resto.i A. (0.b) j

'. The fivx decrease in region D causes Xe-135 to increase which further dect eases the flux to this rojian. (0 5) i 3.

The combirred effect of 1. and 2. above is to cause a dispropor tioriate shift to power (greater than equilibrium) into region A. (0.5) 4. In regnor A. Xe util eventoclly i rec r e a s e to be in equilibrium with the higher f l u.: level, .a t e d in region D will decrease to be in equilibrtom with the lower flua level. This lowers region A flun and ratses recton D flun and thereby starts the oscillatiori. (0.5) l REFERENCE ETC Reactor Theory Manual Chapt. 6 pg. 14 Answer 5.07 (2.0) Svstem parameters 1. Primary coolant temperatures. '(0.5) 2. Primary system pressure. (0.5) 3. Primary coolant flow rate. (0.5) 4. Reactor power level. (0.5) i Ref. ETC Manual on Thermodynamics, Heat Transfer.'nd Fluid Flow Chapter 9, page 32. Answer 5.08 (2.0) a. 1. Solution using the Mollier chart. At the intersection ot the 825 ~ psia pressure line and the saturated vapor line, read 1199 BTU /LBM enthalpy. From the above point, trace the constant entropy line vertically downward to its intersection with the 2 psia pressure line and read the enthalpy of 819 BTU /LBM. The change in enthalpy 380 BTU /LBM 1199 - 819 = = Ginna Category 5 answers continued on next page. f G--

1..

Ginna Category 5 anavers continued. Answer 5.08 (continued) a. 2. Solution using steam tables. Remember that the isentropic process is a constant entropy process. Find in the steam tables, 100% 1.4129 and enthalpy quality steam at 825 psia pressure, entropy = 1108.7 BTU /LBS'. From steam table, at 2 psia, entropy of = '~ 1.7450 while enthalpy of sat. saturated water is 0.1750 and SFG = 1022.1. liquid is 94.03 and hfg = Find the steam quality, x, at 2 psia and entropy 1.4129. 1.4129 - 0.1750 70.94% x = x 100 = 1.7450 The enthalpy at 2 psia - 94.03 + (1022.1 x 0.7094) = 819 BTU /LBM. 379.7 BTU /LBM. The enthalpy change 1.192.7 - 819 = = Either solution 1 or 2 is acceptable for 1.5 points. b. 3. (decrease) (0.5) Ref. Chapter 2, Thermo and Heat Transfer Text ANSWEP

-c * bI (2. doe

.4. no r.aticeable effect - heat transfer area of S/G U-tube 5 1s unaffected. (0.5) -b. h t r.d e r - rapid cooldowr. of reactor coolant in S/G U-tubes forminJ a cold water slo 3 (G.5) -c. h e l;s - jreater boilin3 and heat removal in S/G. (0.5) I d. h e l ;< - 3 eater unb: oo l t n.3 (C.5) 4 lG A th e r-O - J V 4' $ $K Sh t% ~e-< 6c Va !? r .C R s b&r cueny-A G/6 d-hd>es. > bIpeA da Ze.Pc Th,-n Hxt pqq L 9,6 pp.42-+r. Ginna Category 5 answers continued on next page. \\

\\ i Ginna Category 5 answers continued. i Answer 5.10 (2.0) a. Since the pumps are identical, one pump will produce half the flow rate of two pumps operating at a given head. (0.5) On figure 5.5, at various pump heads, select points at flows half of those on the head-capacity curve for two pumps combined and plot a new head capacity curve for one pump operation through these points. (0.5) (see figure 5.5) The intersection of this new pump curve and the system head loss curve l 1s the operating point for one pump operation. (0.5) l The system flow rate is approximately 65 gpm. (0.25) and the pump head is approximately 60 feet. (0.25) b. Since all the flow is through RX4 the system vill be operating on the HX4 head loss curve. At the intersection of the 2 pump head-capacity curve and the HX4 head loss curve, read the pump head as 135 feet. (1.0) J 4 Ref. Ginna Thermodynamics Heat Transfer, and Fluid Flow Book, Section 6, page 35, and Section 7 page 5. End of Ginna Category 5 answers. 1 h i s l i l; -.- ~

.ASSIMPTf0NS: 1. Tha two pumpa cra id:ntical, ccntrifug.1, con:tcnt cpe:d pump 3. 2. Tha frictiin prscaura lo rza through the linto, cpen velvso. check, valves, and flow met'er are negligible. 3. Heat exchangers numbers 1. 2. and 3 are identical. VLOW ) -O-e z. m nIn ( '\\' H %-1 H W1}" [A Sx l Rx Ha Hs y og q 23

  • t O

O c' Y tv vN Hvn_ i _....._.._._._..._....._____i_...s . _., __.j _ _. _.,. ~ _. ._ _- f. _ a.. .._. a. _._g..........-_ +.... __4___. .t ?,, . t_.. .J .... _.... _.. _. _ _ i _.. _r. ._._1._. _m_ _._,..,._t._.._. ..._.._.l__.. _ _. _....1 ..i... ?.QQ ...........l...__._..._ _ ] _.._ _,.._.r, _ _..,....... ..__.q. _.-. _._.I___ ._.t,_._ _.2 i._.._.. ._.m..._.-_.__ _. _..._._... _... _t._ _ _. _ _.. _. .._u_. _- pU.s .1__,_.. .fl a _ = _ e er _ _ w_ _.... w... . _. _.....- s.. _- _r_ _ _... p___

c. _.

...,v. p. p _ h t _._.t-i-. --7____--.-=... .._ y _, _ ..__.T_.. L -..,,-8_._.-s-8_--- 1 _.s.... _- - _---_ _f _..... .._p._._. ..u. m-_ _.c _.i _._. _- -- _2_ 140... -- n. ,s ._ 1_ _4 w h 4_ u 120 L...s .p._._.,...._ n ___._s._ n .'__ r \\. r _4_ -~1 g _ s_- +. s._ 4 6 p __ t- . -.t. _ e. __ =. M 100 /- .a o-* _. r_.. 4 _4 __i._. e 8() ... _. _2..

1. _a.

_... t_ __._ _. __. _._ L. __ i.._ S. _s HEAD-CAPACIW Clan... _ _c _. _ .. _.. _ _ i _ . r._ .....t........ _._. w__ BOTH PlW. S C00EED _....._..i_. __._ . _.....i_..... _.. _.t__._.._...__. [.. . _.......i............_.,.......... ._._.. u. - ... n.t.. s............. ....i_... 40 s...... .i.... .i .i... ........i.... .._..i_....... 20

i....... _............

l .,. ___.i...,. _-t__... ,I i .. i_. t.. t ,i t. 20 10 GO 20 103 En 140 160 150 200 220 240 260 C/PACITY Kim 1 FMRF 5.5

g. e 6. Plant Systems Design, Control, and Instrumentation (25.00) Answer 6.01 (2.0) 1. ^11 1:td:r crifice 12:12tica eniver IA0V-200A, 9. ::d 202) ::: _i__a en o w ww--. s--,f 1 _e. The nrecenrirer l evel. is greater ther, 1016-percent. . -. s-s, sv /.y' Proper control voltage is available to isolation valve A0v-427. g (o,(,6) A containment isolation signal is not present. 4&c57 [o,6 7) 2.# i z,8' Instrument air pressure is available. 40r57 -{A required)- (0,67) Ref. RGE-16, Page 5. Answer 6.02 (1.0) 70 The maximum allowable letdown flow rate is,Mf gpm. (0,5) a This limit is to prevent channeling of the resins in the demineralizers. (0.5) l Ref. RGE-16, page 9 P-3 M ep 2,2. 3 j Answer 6.03 (4.0) i a. FCV-110A FCV-110B FCV-110C FCV-111 a 1. BORATE MODULATED OPEN CLOSED CLOSED 2. DILUTE CIDSED CLOSED OPEN MODULATED 3. AUTO MODULATED OPEN CLOSED MODULATED (Credit 1.0 point each for parts 1-3.) i b. An alternate emergency boration path is through an open FCV-110A and open manual valve M (356%) to the suction of the charging pumps. (1.0) Ref. RGE-18, pages 2, 3 and 10; also schematics RGE-VC-6-1, -2, and -4 E.2 0 S+cp 3.1 Ginna Category 6 answers continued on next page. 9 OR Oy g. t/ -// O C, M(/6 'to (I P i flma V-112 S A ft W G T dre-V-3fB i l.

{. i, Ginna Category 6 answers continued. Answer 6.04 (2.5) 1. Diesel engine overspeed. (0.3) 2. Low lube oil pressure. (0.3) 3. Reverse power relay. (0.3) 4. Overcurrent relay. (0.3) 5. Operator depresses local stop button. (0.3) Items #1 and #2 will trip the engine with SI signal present. (1.0) Ref. RGE-8, page 19. Answer 6.05 (2.0) When the main generator trips, the generator output breakers (1G1372 and 9X1372) are tripped open (0.5) and the exciter field breaker is tripped. (0.5) The unit auxiliary transformer 11 is de-energized and 2 r f r ::1' ; ::1 ; :: buses 11A and llB will instantaneously trip open the normal supply breakers (0.5) and close the bus tie breaker to buses 12A and 12B respectively (0.5) to keep buses llA and llB energized. Ref. RGE-5, page 10. Answer 6.06 (3.0) See figure 6.2 The following valves receive signals and they are all "open" signals 826 A, B, C, & D 852 A & B 1815 A & B 878 B & D 841 & 865 Each of the above valves circled will be worth 0.2 points and each accompanying correct "0" or "C" will be worth 0.05 points. Any additional valves circles will detract from the score. Ref. RGE-27, pages 14-17. Ginna Category 6 answers continued on next page.

=. i Ginna Category 6 answars continusd. Answer 6.07 (1.5) 1. Both containment spray pumps start. (.5) 2. Motor operated spray ring header isolation valves (H0V860 A, B. C. & D) open. (0.5) j 3. Air operated additive eductor suction valves (HCV836 A & B) to the NaOH tank open. (0.5) Ref. RGE-24, page 12. ANSWER MM (2.50) a. An immediate turbine trip - generator trip coincident with a failure of auto bus transfer could result in a loss of forced reactor coolant flow which would be more severe than that reported in the the FSAR. If the i 60 sec. time delay occurs, the loss of flow is not considered serious [ since the reactor will have been shut down for that time. (1.3) i

b. On a major LOCA (double end shear of cold les), the RCP's could g

overspeed and cause flywheel destruction and missile hazards i'nside [ containment. During the time delay. RCP's will be loc'ed to 67 H: 3 rid I i frequency. (1.2) REFERENCE RGE-5 pp. 10 and 11 i a (3.0) Answer 6.09 a. 1. Condenser vacuum must be at least 20 inches vacuum as sensed by 2/2 pressure switches in the condensers (CONDENSER AVAILABLE). (0.5) 2. At least one circulating water pump must be running (CIRCULATING l WATER RUNNING), sensed by pump breaker contacts. ,(0.5) b. 1. The steam dump mode selector switch is in HANUAL. (0.5) 2. The steam dump mode selector switch is in AUT0, and TURBINE TRIP exists as sensed by 2/3 auto stop oil pressure switches less l thaa)d(psigor2/2turbinemainstopvalvesshut. (0.5) N@ f 3. The steam dump selector switch is in AUTO, and P-4 is energized (partial loss of turbine load greater than a 10% step decrease or greater than a 10% decrease in 2 minute) (0.5) Reset or deenergize RELAY 20 using the steam dump RESET-AUTO-MANUAL c. switch on the MCB. (0.5) Ref. RGE-45, pages 4 and 5. l ARP AR-D-24 4 Ginna Category 6 answers continued on next page. i +n---- yw- -,y mw w p, y-,---- w w- -wsc y p. -w-- -,,--- - - -4 -9 e e--

i Ginna Category 6 answer's cc;itinued. Answer b.10 (1.5) a. Undercompensated. (0.5) b. It counteracts the signal produced by the gamma radiation so that only the neutron level is indicated. (0.5) The operator should manually reenergize the source range instruments. c. (0.5) Ref. RGE-33, pages 16 and 17. I i 6.ll ANSWER W (2.00) a. 1. decreases - due to lowering pressure (0.5) 2. decreases - due to rising average RCS temperature (0.5)

3. no change - inward rod motion creates a more negative axial flux difference.

A penalty is applied only for delta 1 3reater than + 217.. (0,5)

b. Lead-lag compensation is applied to the RCS temperature input to OT Delta T (0.25)

This sieans the trip will occur sooner for a f astes-temperature rate of increase. (0.25) REFERENCE RGE-35 pg. 17 RGE-20 pg. 7 T/E pg. 2.3-2 l i

i. t 7. Procedures. Normal, Abnormal, Emergency, and Radiological Control (25.0) Answer 7.01 (3.0) a. The SHIFT SUPERVISOR will supervise the immediate and subsequent actions of those individuals below him and provide other guidatee or assistance as necessary. (0.75) b. The HEAD CONTROL OPERATOR will report to the control station near the auxiliary feedwater pumps and begin directing the manual operations required for the hot shutdown, Xenon free condition. (0.75) c. The CONTROL OPERATOR will report to the charging pump room, being knowledgeable of the fact that he is in a high radiation area, and manually handle the controls at this station as required by procedure. (0.75) d. The PRIMARY SIDE AUXILIARY OPERATOR will report to the boric acid storage tank area for boric acid injection operations required for the Xenon free hot shutdown condition. (0.75) Ref. Procedure E-5. Answer 7.02 (3.0) 1. Core thermocouple temperatures reach or exceed saturation for existing RCS pressure (approximately 700 F). (0.5) 2. Low running current on running RCP's. (0.5) 3. Loss of, low, or erratic RCS flow with RCP running. (0.5) 4. Over temperature delta T set point decrease. (0.5) 5. Erratic or high pressurizer level following either a loss of coolant, a loss of coolant flow, a loss of heat sink, or rapid depressurization. (0.5) 6. Annunciator alarm AA-8. SUBCOOLING MARGIN. (0.5) Ref. Procedure E-1.5. Ginna Category 7 answers continued on next page. i l i r m. ,,--c -,,,-..,-,r-,,

1. -

~ Ginna Category 7 answers continued. Answer 7.03 (3.0) a. 1. An uncontrolled cooldown of the reactor coolant system following a . reactor trip. (0.5) 2. An unexpla.ined or uncontrolled reactivity increase. - (0.5) b. 1. Start either boric acid transfer pump. (0.5) 2. Open MOV-350 and record the time opened and the flow rate on FI-ll3. (0.5) 3. Determine the amount of boric acid desired to be added. (0.5) 4. Stop the boric acid flow and the boric acid transfer pump when the proper amount has been added or when control rods start to move out. (0.5) 7 Ref. Procedure E-20. Answer 7.04 (3.5) (7 parts at 0.5 points each) 1. Verify all control rods are fully inserted. Refer to procedure E-20, IMMEDIATE BORATION, if all control rods are not known to be fully inserted. 2. If the plant is in a condition for which a reactor trip is warranted and an automatic reactor trip has not occurred, manually trip the reactor. 3. Verify that average coolant temperature is approaching the no load value of 547 F. 4 Verify that the main feedwater valves are closed if their controller is in AUTOMATIC and either Tavg. is less than or equal to 5540F or S/G 1evet is greater than 67%. 5. If the main feedwater valves are in MANUAL, exercise extreme caution with feedwater control so as not to reduce the coolant temperature below 547 F or increase the S/G level above 67%. 6. If on manual steam dump, adjust the pressure setting of the controller to maintain the reactor coolant temperature slightly above 547 F. 7. Close air ejector and gland sealing steam valves to stop cooldown. If necessary, close MSIV's (Return switches to open). Ref. Procedure E-26.1. Ginna Category 7 answers continued on next page. b 4 yy, .m 3,~ ,,w,- .w .--,w, ,3--- -,um-,r w m -. ,,--.,,,w.-,,,,--<w .-www -m,, 7 ,-- _ -,w..-.,,we.,

Ginna Category 7 answers continued. Answer 7.05 (3.0) Have personnel in the vicinity of the accident leave the area and gather in a group in the change area if the accident occurred in the reactor cavity or gather in a group at the East end of the auxiliary building if the accident occurred in the spent fuel pit or transfer canal. These. groups should remain in the above locations until released by Health Physics. (1.0) Notify the control room and the control operator will notify Health Physics and evacuate the area. (1.0) Monitor the ventilation from the affected area using the applicable radiation monitors and evaluate the conditions for site contingency reporting per SC-100, GINNA STATION EVENT EVALUATION AND CLASSIFICATION. (l.0) OR: Lrrs H-offgl+e-nkcuc. (j,o), /,usif pwsonn e) 4/Mu re. G.o), g.p,g [g o), Ref. Procedure E-37.3 g e_ e P M R /G Z3.3 7.04-ANSWER M (3.00)

4. The TCHX has a limited capacity which could be exceeded by the som of normal seal leaka3e plus bypass flow at high pressure (0.g)gand thermal I

shock the pump shaft, bearing, and seal components. ( 0.y),f

b. Reduced plant pressure ( 0.8,)g, f o r the purpose of providing sufficient coolins flow to the pump radial bearing (0.g)e6
c. This could lead to seal deterioration as a result of unfiltered seal supply water. (0 7/),6 u.
0.25;
, c

.253 '^ .mm REFERENCE 0-2.5 pg. 4 and E-23.4 P3 1 m ) ,s I 7.07 ANSWER M (3.00) --, a. no offsite effect or potentia', for effect (0.5) normally no notification or action required by offsite agencies (0.5)

b. Lunch room in the Service Olds.

(0.5) c.

1. Dispatch survey teams as necessary (0.5) 2.

Isolate affected area (0.5)

3. Determine cause and restore conditions to normal if possible '. 0. 5 )

4 Inform plant Supt. and Duty En3 neer (0.5) i (3 required, 0.5 each) REFERENCE Section 5.1 of Ginna E-plan SC-2o5~ m f o o'n a d err e x red,>d&m w</% alarm l + on t. An ~2.thcd 0 MeApY gn cr4U e. th c1 fr-No r n -e-unrE art-A. ite4rvi ok <t 3 fy w f of red w.ed M y11/ ov r-.serereI a sp a tal.

v. W LafsLR-~

v/k dad we ua^7' (c. zp+s re<N c.

--g_, 4 Ginna Category 7 answers continued. Answer 7.08 (3.0) a. 1 REM. unless the Emergency Coordinator or Health Physicist gives specia; permission to receive a larger dose. ( 1.0 ) ,,g/ o s[e d [r-f in yars koor 75 REM.wholebody.(Theindividualmustvolunteerfortheassignment b. and)itmustbeauthorizedbytheEmergencyCoordinatorA (1.0) scee+ # 4 roamency seda,, n.cA,-f he delayed da h> /sek <*bojy*wl,. AuthorizationisrequiredfromtheEmergencyCoordinator.) ) a/& c. 25 REM. u }yh i n f & f-he je (1.0) f &+ 2 we g4 /xh. c) f ny fr-e>v ctl. +o o Ref. RG&E Nuclear Response Plan, page 49. A-t ce 12-13 Answer 7.09 (0.5) The shift supervisor may be relieved by the first qualified, trained person to arrive at the TSC. This person shall be the Emergency Coordinator until relieved by the Plant Superintendent. D%y ejet cred A & M S oud^of SC-6OO) Ref. RG&E Nuclear Response Plan, Pages 8 &/0. SC-6cro End of Ginna Category 7 answers. 1

8. Administrative Procedures, Conditions, and Limitations (25.00) J.nswers - Ginna 11/11/85 O. W. Burke Answer 8.01 (2.5) 1. All non-automatic containment isolation valves that are not required to be open during accident conditions are closed and blind flanges are installed where required. (0.5) 2. The equipment door is properly closed and sealed. (0.5) 3. At least one door in each personnel air lock is properly closed and sealed. (0.5) 4. All automatic containment isolation valves are operable, secured in the closed position or isolated by closed manual valves or flanges as permitted by Limiting Conditions for Operation. (0.5) 5. The containment leakage rate satisfies T.S.-4.4 requirements. (0.5) Ref. Ginna T.S. definitions, page 1-4, also RGE-21, page 11. Answer 8.02 (2.5) Prevents core power from reaching a value at which fuel pellet a. centerline melting would occur. (0.25) It acts during power excursions that are too rapid to be protected by temperature and pressure protective circuitry. (0.25) DNB ad io fonif OTAT m y <-. b. Loss of coolant accident V (0.5) j Cladding failure from high temperature due to DNB. (0.5) c. d. RCS overpressure backup to code safety valves. (0.25) It also protects the safeties against water damage. (0.25) Loss of heat sink during a loss of main feedwater accident due to e. auxiliary feedwater pump starting delays. (0.5) Ref. Tech. Spec., pages 2.3-5 through 2.3-7. R G E '3 7 <t b k - ) Answer 8.03 (2.0) 1. Read the containment air particulate monitor. (0.5) 2. Pead the radiogas monitor. (0.5) Ginna Category 8 answers continued on next page.

~ i-Ginna' Category 8 answe'rs continued. Answer 8.03 continued 3. Read the containment humidity detector. (0.5) 4 A leakage detection system in containment, collects and measures the moisture condensed from the containment atmosphere by cooling coils of the main recirculation units. (0.5) 57 ' Sump pump actuation cycle. (0.5) (4 required) Ref. Basis for leakage T.S., page 3.1-26,27 i Answer 8.04 (3.0) 1. From the boric acid tanks (0.5) to the suction of the boric acid transfer pumps (0.25) to the suction of the charging pumps and then to the RCS. (0.25) 2. The charging puaps (0.5) take a suction on the refueling water storage tank (RWST) (0.5) and deliver it te the RCS. 3. The safety injection pumps (0.5) can take their suctions from either the boric acid tanks (0.25) or the RWST and deliver it to the RCS. Ref. T.S. 3.2.2, page '.2-3 Answer 8.05 (2.0) 1. Control rods in a single bank move together with no individual rod insertion differing by more than 15 inches from the bank demand position. (0.5) 2. Control rod banks are sequenced with a 100 (15) step overlap between successive banks. (0.5) 3. The full length control bank insertion limits are not violated. (0.5) 4. Axial power distribution limits which are given in terms of flux differencelimitsand(controlbankinsertionlimitsareobserved.) (0.5) Ref. Basis for T.S. 3.10.2, Power Distribution Limits, pages 3.10-12 & 13. Ginna Category 8 answers continued on next page. i

y(- o Ginna Category 8 answers continued. Answer 8.06 (1.0) It assures the operation of both diesels carrying design load of all the engineered safeguards equipment for at least 40 hours. Ref. Ginna T.S. 3.7 bases, page 3.7-4. Answer 8.07 (3.0) 1. The intent of the original procedure is not changed. (1.0) 2. The change is approved by two members of the plant management staff, at least one of whom is the Shift Foreman who holds a Senior Reactor Operator's license. (1.0) 3. The change is documented, reviewed by the PORC, and approved by the Station Superintendent within 10 days of implementation. (1.0) Ref. Ginna T.S. section 6.8, PROCEDURES, page 6.8-1. Answer 8.08 (1.0) Locked doors shall be provided around the HIGH RADIATION AREA and the keys to the locks shall be msintained under the administrative control of the Shift Foreman on duty. Ref. Ginna T.S. sectirn 6.13.lb, HIGH RADIATION AREA, page 6.13-2. Ginna Category 8 answers continued on next page. i l l t l l 1

~ ~ Ginna Category 8 answerg continued. I 9,01 ANSWER JLA4 (3.00) a. cire pump running (0.6) 3ross activity monitor operable (0.4) Gross Activity within limits (0.4) b. one main exhaust fan running (0.6) Pariculate, gaseous, and iodine monitors operable (0.6) REFERENCE a. basis pg. 3.9-8 g _ y j g[/ gp/ y/ T/S and Table 3.5-6 T/S 3.9.1.la able 4.12-1 and T/S 4.12.1.1.a g, y _ ej, 2, yf-b. T/S 3.9.2.3.b T/S 3.5.4.1 and Table 3.5-6 9.10 ANSWER evet (3.00) a. -5% delta L/k (0.5) to assure soberiticality even if all control rods are withdrawn (0.5)

b. 2 operable - visual in control room (0.5) 1 audible in containment (0.5) c.

To limit doses in the event an irradiated fuel assembly is dama3ed significantly (1.0) REFERENCE a. T/S 1.2 and pg. 3.8-4 b. T/S 3.8.1.c c. T/S 3.11 Answer 8.11 (2.0) 1. The procedure consist of valve line-ups or an inactivated system whereby the sequence of steps will not affect safe plant operation. (1.0) 2. The procedure is written in definitive sections whereby the change of sequence will not affect safe operation of the plant. Ref. Ginna Administrative Procedure, A-503 PLANT PROCEDURE ADHERENCE REQUIREMENTS, page A503:2. End of Ginna Category 8 Answers. End of Ginna Examination. 1 r 1

ATTACHMENT 3 WRITTEN EXAMINATION COMMENTS AND RESOLUTIONS I R0 Examination Question 2.08d Comment: Service water cooling is not directly supplied to J charging pumps but to the charging pump room fan coolers. Resolution: Change answer to read " charging pump room fan cooler" per PID 33013-1250. Training material not sufficiently detailed. 3.05 Comment: The emergency diesel generator (EDG) and the letdown orifice isolation valves are also local stations for remote j safe shutdown. Resolution: EDG and letdown orifice isolations valves local control stations will also be accepted as correct answers per l RGE-8 pg 16 and RGE-54 pg. 4. 3.08 Comment: The incore thermocouple system with reference junctions was replaced during the last refueling outage. Question is no longer valid. Resolution: Questions must be deleted because licensee had not updated reference material prior to use by examiners. i 4.02a Comment: Governor runback will not occur if turbine is in manual. Load limit runback to 80% will occur if turbine power ,i is greater than 80%. Resolution: Change answer to read: 1. Turbine runback if turbine is in auto 2. Turbine load limit runback from above 80% to 80% 3. Block of automatic rod withdrawal (2 required, 0.5 points each) as per procedure E-7, Step 2.4. 4.02b. Comment: Limiting local flux peaking near hot channels is a i more basic purpose of these actions. l Resolution: Hot channel and flux peaking concerns will also l be accepted as an answer, as per FSAR 7.7.1.2.10

2 4 4.06c Comment: Maximum limit is 70 gpm. Resolution: Answer changed to 70 gpm as per procedure P-3v Step 2.2.3, CVCS System. Training material not updated. SRO Examination Question 5.10B Comment: Xe reactivity after 4 days = 0. 1 Resolution: Accepted. Final answer changed to 360 ppm location as per figure 5.4 of the exam. 5.09 Comment: Answer to part-b could be " helped due to better coverage of S/G A-tubes" and part-c could be " hindered due to sustained cold water slug" since neither question specified length of time or severity of the given condition. 4 9 Resolution: The above answers will be accepted as correct as j per Thermo text Chapter 9, paragraph 9.6 pp. 42-45. i 6.01 Comment: Answers #1 and #2 are incorrect due to incorrect i training material (System Description). l Resolution: Deleted-answers #1 and #2 because reference l material provided to examiners was not accurate. New reference is updated RGE-16 pg. 5. l l 6.02 Comment: Same as R0 question 4.06c Resolution: Same as R0 question 4.06c. 6.03b Comment: Other alternate paths could be: 1. thru V-110C to VCT to Changing pump 2. thru V-1128 from RWST 3. thru V-358 Resolution: Above answers will be accepted in accordance with procedure E-20,. Step 3.1. 6.04 Comment: The overcrank trip will trip the EDG with or without i an SI condition and therefore should be an acceptable answer. i Resolution: Not accepted. Question asked for trips which j would " protect the diesel ~ engine" and the overcrank trip is only to conserve air. l 1 i

s 3 6.05 Comment: Delete "an undervoltage relay" since there is no UV relay actually involved in the logic sequence. Resolution: Comment accepted as per Westinghouse logic prints

  1. 3 and #4. Training material was not accurate.

6.09b.2 Comment: Turbine Trip setpoint is 45 psig. Resolution: Change answer to 45 psig as per ARP AR-0-24. 7.05 Comment: The intent of the procedure is to: 1. Limit offsite release 2. Limit personnel exposure 3. Provide proper notification Resolution: The above answer will be accepted as per FSAR 15.7.3.3. 7.06d Comment: Based on the information provided in the question, the answer is indeterminate. Resolution: Part-d is deleted and its point value re-distrib-uted within question 7.06. 7.07 Comment: Specific conditions which indicate a Local Radiation emergency are outlined in SC-205 and should also be acceptable answers. Resolution: SC-205 conditions will be accepted. This reference was not provided to examiners prior to the exam. 4 7.08 Comment: This (c not required SRO knowledge. Resolution: Not accepted. 1. The Shift Supervisor (SS) could be the Emergency Coordin-ator (EC) when no off-shift assistance is available. 2. During the above situation, personnel decontamination may be required such that the 1.0 Rem dose may be exceeded by l those assisting. 3. Implicit in taking over the role of EC is the assumption that the EC is aware of his/her limits of authority, i i 4. Section 5.4.4.1 of the Ginna Nuclear Response Plan clearly states the authority of the EC to grant permission to exceed specified exposure limits. l l l l -v -e y n

4 5. NUREG 1122 Generic Ability #36, Ability to take actions called for in the Facility Emergency Plan, including supporting or acting as the EC, is given a 4.7 out of 5.0 importance rating for SR0's. 7.08 b and c Comment-According to administrative procedure A-1 (Radiation Control Handbook) pp.12-13, anproval is not required for emergency exposure, only notification. Resolution: Add "...except that emergency action need not be delayed due to lack of approval." to parts b and c as per the stated reference. l 8.02b Comment: Add "DNB and limit on OT delta T range". Resolution: Accepted based on RGE-35 attachment. 8.09 Comment: Tech Specs no longer addresses these conditions. New reference is S-4.1. E, G, Y for part a. and S-4.2.5 for part b. Resolution: Answer remains the same, reference changed as above. Facility provided an out-of-date Tech Spec document to l NRC examiners. r _}}