ML20140B007

From kanterella
Jump to navigation Jump to search
Informs That 961030 Submittal Re Westinghouse AP600 Design Ltr of 961030 Will Be Withheld from Public Disclosure,Per 10CFR2.790
ML20140B007
Person / Time
Site: 05200003
Issue date: 06/03/1997
From: Diane Jackson
NRC (Affiliation Not Assigned)
To: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9706050256
Download: ML20140B007 (4)


Text

_. _

m. _

],

Tce nt N (C.

f on4 9)5L l

g UNITED STATES j

s

,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30666 0001 y

l

..... p#

June 3, 1997 f

4 I

Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit

)

P.O. Box 355 i

Pittsburgh, PA 15230

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION (RAI) FROM PUBLIC DISCLOSURE FOR WESTINGHOUSE AP600 DESIGN LETTER OF OCTOBER 30, 1996 -

J l

Dear Mr. McIntyre:

i By Westinghouse letter NSD-NRC-96-4872, dated October 30, 1996, you submitted information in response to several of the staff's RAls regarding the WG0THIC computer code. You stated that proprietary and non-proprietary versions of the material were provided.

In your letter, the you identify the information that is considered to be proprietary and request that it be withheld from public disclosure in accor-l dance with 10 CFR 2.790. The' enclosed affidavit (AW-96-1031), executed by you on November 1,1996, states that the designated information, owned and held in l

confidence by Westinghouse, should be considered exempt from mandatory public l

disclosure for the following reasons:

(a)

The information reveal s the distinguishing aspects of a process (or j

component, structure, tool, method, etc.) where prevention of its use by l

any of Westinghouse's competitors without license from Westinghouse constitutes a competitie economic advantage over other companies.

)

i

)

(b)

It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application i

of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

1 i

i We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of Westinghouse's statements, have determined that some of the submitted information sought to be withheld contains trade secrets or proprietary comercial. information. However, you did not submit a complete non-proprietary version of the proprietary material l

in your non-proprietary submittal. You removed the pages that you consider proprietary without indicating in the non-proprietary version that the pages were missing. Additionally, figure and axis titles are usually not considered proprietary information.

Provided below is a list of figures and the table that you failed to include in your non-proprietary version.

Enclosed is the staff's determination of the information in your letter that the staff g

considers non-proprietary.

p NRC FIE CENER COPY d e004t 9706050256 970603 PDR ADOCK 05200003 A

PDR g

__.~

o i

4 5

Mr. Brian A. McIntyre 2-June 3,1997 In accordance with 10 CFR 2.790(c), this expurgated copy is being. forwarded to you as notice that the enclosure will be placed in the Nuclear Regulatory

)

Commission (NRC) Public Document Room thirty (30) days from the date of this i

letter.

If within thirty (30) days of this letter, you request withdrawal of these documents in accordance with 10 CFR Section 2.790(c), or provide additional reasons for the withholding of information not already expunged 1

from the documents enclosed, your request-will be considered in light.of applicable statutes and regulations and a determination made whether the documents will be withheld from public disclosure or returned to you.

The figures and table included in the proprietary submittal that require a non-proprietary version:

)

1)

Response to RAI 480.346, Page 480.346-3; Table 1, " Preliminary and Final 4

i Data for Baseline Tests."

l 2)

Response to RAI 480.392, Page 480.392-3; figure 480.392-1, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 212.lA."

3)

Response to RAI 480.392, Page 480.392-4; Figure 480.392-2, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 212.1B."'

4)

Response to RAI 480.392,-Page 480.392-5; Figure 480.392-3, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 212.10."

5)

Response to RAI 480.392, Page 480.392-6; Figure 480.392-4, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 216.1A."

6)

Response to RAI 480.392, Page 480.392-7; Figure 480.392-5, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 216.1B."

7)

Response to RAI 480.392, Page 480.392-8; Figure 480.392-6, " Measured and Distributed Predicted Non-Condensible Pressure Ratios for Test 219.1B."

8)

Response to RAI 480.392, Page 480.392-9; Figare 480.392-7, " Measured and Distributed Predicted Non-Condensible Pressure Ratios for Test 219.18."

9)

Response to RAI 480.392, Page 480.392-10; Figure 480.392-8, " Measured and Distributed Predicted Non-Condensible Pressure Ratios for Test 219.10."

10)

Response to RAI 480.392, Page 480.392-11; Figure 480.392-9, " Measured and Distributed Parameter Predicted Air Pressure Ratios for Test 221.1."

4 11)

Response to RAI 480.394, Page 480.394-2; Figure 480.394-1, " Measured, Lumped Parameter and Distributed Parameter Vessel Pressure."

12)

Response to RAI 480.394, Page 480.394-3; Figure 480.394-2, "LST Lumped Parameter. Predicted Versus Measured Stcady-State Vessel Pressure."

4

.n m--

- -- ~. -

~.....-

N

.s

.Mr. Brian A. McIntyre June 3, 1997 13)

Response to RAI 480.394, Page 480.394-43; Figure 480.394-32, "LST 4.

Distributed Parameter Predicted Vs. Measured Steady-State Vessel Pressure."

4 Withholding from public inspection shall not affect the right, if any, of i

persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in 3

-this area. We will, of course, ensure.'that the consultants have signed the J

. appropriate agreements for handling proprietary information.

i If the basis for withholding this information from p'ublic disclosure should change in the future such that the information could then be made available j

for public inspection, you should promptly notify the NRC.

You should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your withheld information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of j

any public disclosure.

Sincerely, original signed by:

i Diane T. Jackson, Project Manager i

Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation j

Docket No.52-003

Enclosure:

As stated i

cc W/ enclosure:

See next page g

i DISTRIBUTION w/o enclosure:

casekst0F11e, PDST R/F MSlosson PUBLIC SWeiss TQuay 1

TKenyon BHuffman JSebroksy DJackson JMoore, 0-15 B18 WDean, 0-17 G21 ACRS (11)

EThror, 0-8 H7 CBerlinger, 0-8 H7 JKudrick, 0-8 H7 MPSiemien, 0-15 B18 1

i

- DOCUMENT NAME:- A:SCS RAI.PRP

, - Ta semelve e copy of this aloeumont,iniBeste in the ben: *C* = Copy without attachment /encloswo

  • E' = Copy wMh attechment/encloswe
  • N* = No copy 0FFICE PM:PDST:DRPM OGC y%

C, D:PDST:DRPM l

l NAME DTJackson:sgT1)V MPSiemien TRQuay @

}

DATE 05/(#97 0

05/\\h/97 06/S/97 OFFICIAL RECORD COPY

., +

= -..

i Mr. Brian A. McIntyre Docket No.52-003 Westinghouse Electric Corporation AP600 cc w/o enclosure:

Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road 4

P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Ms. Cindy L. Haag Advanced Reactor Program 4

Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, 11.W.

i Energy Systems Business Unit Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Mr. M. D. Beaumont Ms. Lynn Connor l

Nuclear and Advanced Technology Division Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 1

i One Montrose Metro Cabin John, MD 20818 11921 Rockville Pike Suite 350 Mr. James E. Quinn, Projects Manager Rockville, MD 20852 LMR and SBWR Programs GE Nuclear Energy

)

Mr. Robert H. Buchholz 175 Curtner Avenue, M/C 165 GE Nuclear Energy San Jose, CA 95125 175 Curtner Avenue, MC-781 San Jose, CA 95125 Barton Z. Cowan, Esq.

i Eckert Seamans Cherin & Mellott Mr. Sterling Franks 600 Grant Street 42nd Floor U.S. Department of Energy Pittsburgh, PA 15219 NE-50 l

4 19901 Germantown Road Mr. Ed Rodwell, Manager i

Germantown, MD 20874 PWR Design Certification i

Electric Power Research Institute Mr. S. M. Modro 3412 Hillview Avenue Nuclear Systems Analysis Technologies Palo Alto, CA 94303 4

Lockheed Idaho Technologies Company Post Office Box 1625 Idaho Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road 1

Germantown, MD 20874 4

4 I