ML20140A868
| ML20140A868 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/13/1986 |
| From: | Delgeorge L COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20140A872 | List: |
| References | |
| 1128K, NUDOCS 8601230420 | |
| Download: ML20140A868 (1) | |
Text
O Commonwealth Edison s
/c ) one First National Plaza Chicago. Illinois
[h e
( O Address Reply to: Post Office Box 767
/ j j I' Chicago, Illinois 60690 January 13, 1986 j
Mr. James G.
Keppler Regional Administrator U..S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL. 60137
Subject:
Braidwood Station Units 1 and 2 Engineering Evaluation of the Pipe Corrosion Problem Identified in CECO.
NCR 633 - 55(e) 84-10 and Item 2 of Inspection Report 84-17 NRC Docket Nos. 50-456 and 50-457 Reference (a):
L.O. DelGeorge letter to J.G.
Keppler dated January 7, 1986
Dear Mr. Keppler:
Reference (a) transmitted the Report which documents the basis for the closure of 10 CFR50.55(e) report 84-10 and Item 2 of Inspection Report 84-17.
It was indicated that an additional distribution of this Report would be forthcoming.
This letter accomplishes that redistribution.
One signed original and 19 copies of this letter and the attachments are submitted for your use.
Very truly yours, i
Louis O. DelGeorge Assistant Vice President Attachments cc:
H.R. Denton-(w/ attachments (5))
J.M. Taylor-(w/ attachments (5))
1128K
$62 45 8601230420 860113 ADOCK 0 % D JAN 16191E i PDR S
(
t
_