Forwards Braidwood Station - Units 1 & 2 Engineering Evaluation of Pipe Corrosion Problem Identified in Ceco Ncr 633. Rept Documents Basis for Closure of Deficiency Rept 84-10
ML20140A868
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/13/1986
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20140A872 List:
References
1128K, NUDOCS 8601230420
Download: ML20140A868 (1)


Text

O Commonwealth Edison

/c ) one First National Plaza Chicago. sIllinois e

( O Address Reply to: Post Office Box 767

[h

/ j j I' Chicago, Illinois 60690 l

January 13, 1986 l j

Mr. James G. Keppler Regional Administrator U ..S . Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL. 60137

Subject:

Braidwood Station Units 1 and 2 Engineering Evaluation of the Pipe Corrosion Problem Identified in CECO.

NCR 633 - 55(e) 84-10 and Item 2 of Inspection Report 84-17 NRC Docket Nos. 50-456 and 50-457

Reference (a): L.O. DelGeorge letter to J.G. Keppler dated January 7, 1986

Dear Mr. Keppler:

Reference (a) transmitted the Report which documents the basis for the closure of 10 CFR50.55(e) report 84-10 and Item 2 of Inspection Report 84-17. It was indicated that an additional distribution of this Report would be forthcoming. This letter accomplishes that redistribution.

One signed original and 19 copies of this letter and the attachments are submitted for your use.

Very truly yours, i

Louis O. DelGeorge Assistant Vice President Attachments cc: H.R. Denton-(w/ attachments (5))

J.M. Taylor-(w/ attachments (5))

1128K 8601230420 860113