Informs That Staff Removed Proprietary Document, Design Approach & Summary Rept Nuclear Island Basemat,Draft Rept 1010-S3R-001 Rev 0,Dtd Nov 96, from AP600 Docket File & Returned to Westinghouse for Disposition
ML20139A290
Person / Time
Site: 05200003
Issue date: 04/23/1997
From: Diane Jackson
NRC (Affiliation Not Assigned)
To: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9704250187
Download: ML20139A290 (3)


Text

. _ _ . _ _ - _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . _ . _ - . . . _ . . . _ _ _ _ ~ . _ . _ .

~ Dot Ls 4 Pb j

y d atog% UNITED STATES i

NUCLEAR REGULATORY COMMISSION f if WASHINGTON, D.C. 20&S4001

!.  %..... April 23,1997 Mr. Brian A. McIntyre, Manager Advanced Plant Safety and Licensing

1. Westinghouse Electric Corporation
Energy Systems Business Unit
P.O. Box 355 Pittsburgh, PA 15230-0355 i

SUBJECT:

RETURN OF PROPRIETARY MATERIAL TO WESTINGHOUSE DOCKETED UNDER THE AP600 DESIGN REVIEW i

Dear Mr. McIntyre:

By Westinghouse letter NSD-NRC-96-4893, dated November 27, 1996, you submitted draft Westinghouse Report 1010-S3R-001 Revision 0, entitled, " Design Approach and Summary Report Nuclear Island Basemat." This report, considered propri- l l etary by Westinghouse, was submitted in a draft form to facilitate planning for a design review meeting. This meeting was held December 9 through 13, i 1996, in Moneroeville, PA. By Westinghouse letter, NSD-NRC-96-4915, dated December 16, 1996, you requested the return of this document.

The reasons you cited for recalling this proprietary material were that the document was provided for planning purposes and it was not a means to provide design.and analysis information that would be required to complete the staff's safety evaluation. Additionally, you state that any information required by the staff would be incorporated in to the standard safety analysis report or provided in a written response. The NRC technical review staff performed an assessment of the document to ensure that it is not relied on.to support its safety determination relative to the AP600 review.

During previous discussions and a meeting with your staff, we.were told that documents submitted in suppo't of the AP600 application are subject to the retention requirements of 10 CFR Part 50, Appendix A, Criterion 1, and will be retained for the lifetime of the application.. Based on your assurances that retracted documents will be retained at Westinghouse, we are satisfied that an adequate mechanism exists for NRC retrieval and inspection of these documents, if required. We request that you provide written confirmation within 30 days of receipt of this letter that this document will be permanently retained by Westinghouse.

As a result of these efforts, we have determined that because the material in NSD-NRC-96-4893 was considered preliminary, that its use was for the prepara-tion of the meeting, and it was not relied upon by the staff for any safety determination, the proprietary material can be removed from the Westinghouse docket files and returned to you. t

"*~IP704250187 970423

,,means e PDR ADOCK 0520OO 3 p

1 k

,- Mr. Brian A. McIntyre

. April 23, 1997 }

l i In accordance with your request, the staff has removed the following propri- l 1 etary document from the AP600 docket file and is returning it to Westinghouse l

for your disposition:

j DESIGN APPROACH AND

SUMMARY

REPORT NUCLEAR ISLAND BASEMAT (Draft Report I 1010-S3R-001 Revision 0, dated November 1996) Enclosure to Westinghouse 3

letter NTD-NRC-96-4893, dated November 27, 1996. l

, The original document contained in the docket file is being returned. NRC i staff, contractors, or other parties who received internal NRC distribution 1 have been notified to destroy their copies. The staff notes that the forward-l ing letter and affidavit associated with the retracted material, which has l l been placed in the Public Document Room, will remain on the docket. '

i

Sincerely,

~

6N' i

Diane'T. Jackson, roject Manager. ,

i Standardization Project Directorate  ;

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

] Docket No.52-003

Enclosure:

As stated ,

1 cc w/o enclosure:

See next page l

DISTRIBUTION:  !

Docket File PDST R/F TAartin l PUBLIC DMatthews T0uay  ;

i TKenyon DJackson Wliuffman '

l JSebrosky WDean, 0-17 G21 JMoore, 0-15 B18

! MSiemien, 0-15 B18 ACRS (11) GBagchi, 0-7 H15 i TCheng, 0-7 HIS 4

- DOCUMENT'NAME: A:BASEMAT1.RTN. _

  • See previous concurrence Ta soeehe a espy of this document,Inecate in the ben: "C" = Copy wkhout ettschment/encloewe 'E' = Copy with attachment /encloswo "N' = No copy OFFICE- PM:PDST:DRPM .] __ BC:ECGB:DE OGC l DPDST:DRPM l
NAME DTJackson
sg W GBagchi* MPSiemien* TRQuay 77%
DATE 04/18/97 C.) 02/10/97 02/12/97- 04/25/97 OFFICIAL RECORD COPY l

1

- _ _ _ _ _ _ _ _ = . _ _ _ _ _ _ . -___ - - _- - ,m.-

i ,

i* Mr. Nicholas J. Liparulo Docket No.52-003 ,

l Westinghouse Electric Corporation AP600 i i cc: Mr. B. A. McIntyre Mr. Ronald Simard, Director '

Advanced Plant Safety & Licensing Advanced Reactor Programs l Westinghouse Electric Corporation Nuclear Energy Institute )

j Energy Systems Business Unit 1776 Eye Street, N.W. 1 i P.O. Box 355 Suite 300 l

{ Pittsburgh, PA 15230 Washington, DC 20006-3706 l i

Ms. Cindy L. Haag Ms. Lynn Connor  !

j Advanced Plant Safety & Licensing Doc-Search Associates  !

Westinghouse Electric Corporation Post Office Box 34  !

, Energy Systems Business Unit Cabin John, MD 20818 l Box 355 i Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager i LMR and SBWR Programs  !

! Mr. M. D. Beaumont GE Nuclear Energy '

i Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 i Westinghouse Electric Corporation San Jose, CA 95125 i One Montrose Metro

11921 Rockville Pike Mr. Robert H. Buchholz i Suite 350 GE Nuclear Energy i Rockville, MD 20852 175 Curtner Avenue, MC-781 i San Jose, CA 95125 ,

l Mr. Sterling Franks

  • l U.S. Department of-Energy Barton Z. Cowan, Esq. I NE-50 Eckert Seamans Cherin & Mellott 3 19901 Germantown Road 600 Grant Street 42nd Floor i Germantown, MD 20874 Pittsburgh, PA 15219 i
Mr. S. M. Modro Mr. Ed Rodwell, Manager
Nuclear Systems Analysis Technologies PWR Design Certification i

Lockheed Idaho Technologies Company Electric Power Research Institute Post Office Box 1625 3412 Hillview Avenue l

, Idaho Falls, ID 83415 Palo Alto, CA 94303 Mr. Frank A. Ross Mr. Charles Thompson, Nuclear Engineer

U.S. Department of Energy, NE-42 AP600 Certification Office of LWR Safety and Technology NE-50 1 19901 Germantown Road 19901 Germantown Road l Germantown, MD 20874 Germantown, MD 20874 I l

l 3

4

!