ML20138R933

From kanterella
Jump to navigation Jump to search
Revised Application for Amends to Licenses DPR-77 & DPR-79, Reflecting Recent Organizational Changes.Proposed Changes to Nuclear Review & Audit Group Withdrawn.Nuclear Safety Review Board Format Will Be Retained
ML20138R933
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/08/1985
From: Domer J
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20138R934 List:
References
NUDOCS 8511190272
Download: ML20138R933 (5)


Text

_

g' TENNESSEE VALLEY' AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 105B Lookout Place November 8, 1985 TVA SQN TS 60 Director of Nuclear Reactor Reguiction Attention:

Ms. E. Adensam, Chief Licensing Branch 2 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C.

20555

Dear Ms. Adensas:

In the Matter of the

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 By the October 2, 1984 letter from L. M. Mills to you we submitted a request to amend operating licenses DPR-77 and DPR-79 (TVA-SQN-TS-60) for our Sequoyah Nuclear Plant units 1 and 2 technical specifications. These changes requested laproved radiological effluent specifications and altered section 6 of the technical specifications to reflect changes to the organization, the nuclear review and audit group (Nuclear Safety Review Board), and the independent safety engineering group.

This letter revises our October 2 submittal to reflect the recent organizational changes made as part of TVA's Nuclear Performance Plan.

By this letter we formally withdraw the proposed changes to the nuclear review and audit group. We will no longer establish a Nuclear Safety Staff, but will retain the existing Nuclear Safety Review Board format. These proposed changes are provided in the enclosure. NSRB review is being performed concurrent with your review.

This original significant hazards considerations evaluation made pursuant to 10 CFR 50.92 is still valid.

If you have any questions concerning this matter, please get in touch with Everett Whitaker at FTS 858-8090.

Very truly yours, TENNESSEE VALLEY AUTHORITY l

. M.

m

. A. Domer, Chief Nuclear Licensing Branch gndsubscr)bedbeforeme Sworn

- lday ofA//Mle.

this 1985

//kY, J

Notary Public My Comission Expires f {

Rnclosure 8511190272 851100 cc: See page 2 PDR ADOCK 05000327 P

PDR An Equal Opportunity Employes Y

. Director of Nuclear Reactor Regulation November 8, 1985 cc (Enclosures):

U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Carl Stahle Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Mr. Michael H. Mobley, Director (w/o Enclosure)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue North Nashville, Tennessee 37203

SE FC OI V RR E

OE C

TS I

N C

A ER R

RA RU I E E S DL T

GS C

R AA U

O I

N N

P A Y P

MT U

I S

L

.A L

U A

Q C

I N

I I

R C

O E

T T

CEP D.

I RN N

I B A

)

DW R

T A

E N

E T

E L

R I

M R

C A

S E

E RU ES 1

G G

EN R LN A

E A

W(

CO 2 N N

O G

UI A

A PG A NT 6 M M

N N A

A

,R E Y

,I L

RR M RE R T A

EE EP U I u

GO G L R

GE E

AN A

I I

u N

NI N

R F C P

E AG E

A O

A C

MN M

T F

D E

CE R

D RP O

NA l

I N F

DQ S

N E

O T

I I

T S

A Z

I NAGR Y

O TD ER E

FA T

AO I

SB S

R F

l RW O

F AE T

0 EI C

LV E

CE UR RP l

I N N

DFB ET I

S

!G-

,4

  • fSE I

E o k

. \\

SITE un DIRECTOR m

c E

MANAGER E3 QUALITY ASSURANCE

=

I E!

PLAllr M

COMPLIANCE PLANT QUALITY ASSURANCE STAFF I

th)DI FICATIONS SITE SERVICES PLANT

)ESIGN SERVICES MANAGER FnNAGER MANAGER FMNAGER i

w OPERATIONS & ENGINEERING MAINTENANCE SUPERINTENDENT SUPERINTENDENT I

I I

OPERATIONS ENGINEERING I

ASSISTAF: OPERATIONS SU'*LhVISOR

  • .The Plant Compliance Staff fulfills the responsibility of the Independent SdIFT CREWS Safety Engineering Group

--Shif t Engineer

-- AS E Figure 6.2-2 Y

'E "'** '*"

-- UO

-- AUG L

r--

,e' i

l '* :-

l GENERAL MANAGER MANAGER PO'JER &

ENGINEERING (NUCLEAR) l MANAGER NUCLEAR OPERATIONS i

l DIVISION OF l

NUCLEAR SERVICES SITE DIRECTOR RADIOLOGICAL SERVICES PLANT MANAGER l

l HEALTH PHYSICS ENGINEERING L

SERVICES SECTION l

l FIGURE 6.2-3 ORGANIZATION FOR >ONITORING PROGRAM AND DOSE CALCULATIONS i

l SEQUOYAH - UNIT 1 6-4 l

l l

\\

J c