k p

O OPERATING DATA REPORT DOCKET NO. 50-364 DATE 9-5-85 COMPLETED BY J.D. Woodard TELEPHONE ('nsi R99-5156 i

OPERATING STATUS

1. Lnit Name:

in w nh "

F'r * - I'n U '

2. Reporting Period:

Aurunt. 1985

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 7-30-81, date of 860 commercial operation.

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

Rsn ?

7. Maximum Dependable Capacity (Net MWe):

807.2

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. !! Any (Net MWe):

N/A

"!^

10. Reasons For Restrictions,if Any:

This Month Yr..to Date Cumulative

11. Hours In Reporting Period 744 5.831 15.856
12. Number Of Hours Reactor Was Critical 679.2 3,959.1 30,877.6
13. Reactor Reserve Shutdown Hours 0.0 U.0 138.0
14. Hot:rs Generator On.Line G73.9 3.305.4

'n 461.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.739.953 9,770,472 76,623,220
17. Gross Electrical Energy Generated (MWH) 573,562

.3, 0,,, a 25.I85,410

18. Net Electrical Energy Generated (MWH) 543,470 4'nh AM 23,871,414
19. Unit Service Factor 90.6 66.6 85.0
20. Unit Availability Factor 90.6 66.6 85.0
21. Unit Capacity Factor (Using MDC Net) on s 64.9 q,3
22. Unit Capacity Factor (Using DER Net) 88.I n,

i R n.1 -

23. Unit Forced Outage Rate 9.4 1.7 5.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved OO

\\

INITIAL CRITICALITY 5-6-81 5-8-81 INITIAL ELECTRICITY 5-24-81 5-25-81 /

COMMERCIAL OPERATION 9.1_ni 7_,n_ni 8511180556 850831 PDR ADOCK 05000364 R

PDR

gyj77,

~

DOCKET NO.

50- w 2

UNIT s

DATE 9-5-85 COMPLETED BY T D-Woodard (205) 899-5156 TELEPHONE Augun, 1985 310NTl!

DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)

(31We Net) l 823 g

g7 811 2

45 13 911

~7 g9 821 3

0

g g24 4

824 5

559 21 810 6

m, 827 7

790 23 R97 821 g

R21 24 820 9

,3-822 10 817 j

gg3 815 819 gg g

818 12 m

822 l3 819 3

p,,

14 821 30 922 IS A ' '-

31 821 16 817 EGUCTIONS On this form:. list the svenge daily unit power levet in MWe Net for each d:y in the reporting munth. Compute to

, the nesre:t whole me;2 wast.

(9/77)

O l

v h

l

,\\

(x s

UNIT Silu1 DOWNS AND POWER REI)UC110NS DOCKET NO.

sn_ m l

UNIT NAhlE T

M N 1ov-Tinit 2 DATE 9-5 R5 REPORT Af0NTil Aucust. I985 COhlPLETED llY T-TL woodard TELEPilONE (205) 899-5156 c

rs 3 m:

5 L

.3 E g

g sg Licensee 5%

g%

Cause & Connective No.

Date g

Eg

,gx Event u?

ay Acilon in N0 0

b ij Repost #

Platveni Recurgence t5 007 850802 F

70.1 A

3 85-012-00 EF INVT A reactor trip occurred due to Over-temperature-delta-T (OT-delta-T).

Prior to the trip, channel 3 of OT-delta-T had failed and had been tripped.

The 2B inverter failed a:ausing channel 2 of OT-delta-T to trip providing the 2 out of 3 coincidence on OT-delta-T, causing the reactor trip.

The 21 inverter was repaired and subsequently placed back into service.

I 2

3 4

F: Fosted Reason:

klethod:

Exhibit G - lastructions S: Scheduled A-Equipment Failure (Explain) l-klanual for Preparasion of Data 11 klaintenance ci Test 2 hfanual Scram.

Enisy Shecis for 1.icensee C Refuchng 3 Automatic Scram.

Event Repius (1.ER) File INUREG-D Regulaiosy Resencei.n 4-Othes (Explain) 0161)

E-Opesaior Tsaining A license Exandnation F-Adminisisasive 5

G Ope:ational Luus (Explain)

Eshibis I - Same Source PJ/77)

II Othes (Emplain)

r w

M_iling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Fhntndge Bwiding

/\\lilbillllil bOWCf September 11, 1985 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the August 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.

If you have any questions, please advise.

Yours ver trujy, f

(%

R. P. Mcdonald RPM /SNK:nac/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy)

I I i

JOSEPH M.

FAHLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS AUGUST, 1985 During the month of August, there was one automatic shutdown which occurred on 8-2-85.

The following major safety-related maintenance was performed in the month of August:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

2.

The 2B inverter was repaired and placed back into service.

The failure of this inverter contributed to the reactor trip which occurred on 8-2-85.