ML20138Q385
| ML20138Q385 | |
| Person / Time | |
|---|---|
| Issue date: | 11/04/1985 |
| From: | Stello V Committee To Review Generic Requirements |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.099, RTR-REGGD-1.099 NUDOCS 8511180091 | |
| Download: ML20138Q385 (30) | |
Text
l
'f p ur
'o UNITED STATES F
NUCLEAR REGULATORY COMMISSION o
g
.j WASHINGTON, D. C. 20555 NOV 4 1s55 I
MEMORANDUM FOR:
William J. Dircks Executive Director for Operations Victor Stello, Jr., Chairman FROM:
Comittee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 81 The Comittee to Review Generic Requirements (CRGR) met on Wednesday, i
September 25, 1985 from 12:30-5:00 p.m.
A list of attendees for this meeting is enclosed (Enclosure 1).
G. Arlotto (RES)' briefed the CRGR regarding existing and forthcoming
- 1. sumarizes guidance associated with the Decomissioning Rule.
this matter (Category 2 item).
G. Arlotto (RES) presented for CRGR review proposed Revision 2 to 2.
Regulatory Guide 1.99, Radiation Damage to Reactor Vessel Materials. sumarizes this matter (Category 2 iten).
1 T. Speis (NRR) presented for CRGR review the proposed Regulatory Guide, 3.
entitled " Guide for Licensee Preparation and NRC Staff Review of Plant-Specific Analysis Required by the Pressurized Thermal Shock Rule, 10 CFR 50.61 (USI A-49 Resolution). Enclosure 4 sumarizes this matter (Category 2 item).
D. Allison (IE) presented for CRGR review, the proposed IE Bulletin, 4.
entitled Steam Binding of Auxiliary Feedwater Pumps. Enclosure 5 sumarizes this matter (Category 2 item).
Enclosures 2, 3, 4 and 5 contain predecisional information and therefore will not be released to the Public Document Room until the NRC has considered (in public forum) or decided the matters addressed by the information.
In accordance with the E00's July 18, 1983 directive concerning " Feedback and Closure on CRGR Reviews," items 2, 3, and 4 above require written responses from cognizant offices to report agreement or disagreement with CRGR recom-The responses, which are required within 5 working mendations in these minutes.
days after receipt of these meeting minutes, are to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the EDO for decisionmaking.
8511100091 851104 PDR REVCP NRCCRGR MEETINCOB1 PDR
. Nov i L35 Questions concerning these meeting minutes should be referred to Walt Schwink (492_8639).
Original Signed by V. Stello Victor Stello, Jr., Chairman Committee to Review Generic Requirements
Enclosures:
As Stated cc: Commission (5)
SECY Office Directors Regional Administrators CRGR Members G. Cunningham G. Arlotto T. Speis R. Baer Distribution:
VStello JRoe JHSniezek WLittle RHernan EFox JHenry RErickson JZwetzig FHebdon JPhilips ETriner DEDR0GR cf Central File PDR(NRG/CRGR)
R0GR Staff
^
0FC :R0 R
- DEDR0GR y.....:_____.______:.___________: ___________:______ _____:____________:.._________
NAME :JH'$h e ek
- VStello
_____:____ l...____: ___________:____________:..._________:____________:____________:___________
L myew
.sYivL M.e
LIST OF ATTENDEES CRGR MEETING NO. 81 September 25, 1985 CRGR MEMBERS V. Stello R. W. Houston (for R. Bernero)
E. Jordan J. Scinto T. Ippolito (for J. Heltemes)
R. Cunningham D. Ross OTHERS M. Taylor W. Schwink J. Conran R. W. Hernan F. Schroeder K. Kniel S. Block R. Cleveland D. Harmon F. Witt C. Mattsen F. Cardile P. Erickson O. Lynch M. Lesar J. Zwolinski D. Nash G. Arlotto R. Woods W. Hazelton M. Vagins C. Serpan, Jr.
J. Reyes C. Johnson P. Randall J. Pittman M. Wegner T. Chandrasekaran G. Holahan k