ML20138Q114

From kanterella
Jump to navigation Jump to search
Forwards Weld Overlay Design & Analysis for Indications in Recirculation & RHR Sys, Justifying Addl 18 Months of Continued Operation.Weld Insps Completed Per Generic Ltr 84-11.Disposition of Welds W/Crack Indications Summarized
Date released: 05/31/2020 Download: ML20138Q114


Weld Overlay Design & Analysis for Indications in Recirculation & RHR Sys.
ML20138Q122
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/20/1985
From: Branlund B, Chapman T, Marisa Herrera
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20138Q122 (106)
Forwards Weld Overlay Design & Analysis for Indications in Recirculation & RHR Sys, Justifying Addl 18 Months of Continued Operation.Weld Insps Completed Per Generic Ltr 84-11.Disposition of Welds W/Crack Indications Summarized
ML20138Q111
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/20/1985
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: M ULLER D R, MULLER D R
Office of Nuclear Reactor Regulation
References
Download: ML20138Q111 (6)