ML20138Q056

From kanterella
Jump to navigation Jump to search
Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed
Date released: 05/31/2020 Download: ML20138Q056


:on 970203,discovered Starting Air Sys Operating Outside Design Basis.Caused by Failure to Properly Identify & Verify Design Basis.Design Basis Established & Documented in FSAR
ML20138Q088
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/03/1997
From: Robert Walpole
NORTHEAST NUCLEAR ENERGY CO.
To:
References
Download: ML20138Q088 (3)
Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed
ML20138Q052
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/03/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20138Q052 (1)