ML20138P914

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation Accepting Suppls 1 & 2 to XN-NF-507(P), Exxon Nuclear Co Setpoint Methodology for C-E Reactors-Statistical Setpoint Methodology. Publication of All Versions of Rept Requested within 3 Months
ML20138P914
Person / Time
Issue date: 12/16/1985
From: Berkow H
Office of Nuclear Reactor Regulation
To: Chandler J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20138P916 List:
References
NUDOCS 8512260347
Download: ML20138P914 (2)


Text

- . _. . __ _ _ _ __

December 16, 1985 Mr. J. C. Chandler, Lead Engineer Reload Fuel Licensing Exxon Nuclear Company, Inc.

2101 Horn Rapids Road Post Office Box 130 Richland, Washington 99352

Dear Mr. Chandler:

SUBJECT:

ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT XN-NF-507(P),

SUPPLEMENTS 1 AND 2, " ENC SETP0 INT METHODOLOGY FOR C.E. REACTORS-STATISTICAL SETP0 INT METHODOLOGY" We have completed our review of the subject topical report submitted by the Exxon Nuclear Company, Inc. (Exxon) by letters dated September 29 and November 10, 1982. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that Exxon publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Exxon and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

DISTRIBUTION: Sincerely, iGentreT (11e 5 DTondi

'SSPD Rdg ~ " SSun PDR Original signed by DCS Dominic Tondi for PNoonan Herbert N. Berkow, Director HBernard Standardization and Special HBerkow Projects Directorate RDiggs Division of PWR Licensing-B

Enclosure:

As stated

- p Y DPRLyB;SSPD DP :SSPD DPWRL-B: D x ,3 , j HB d HBerkow ,

{PNo 12 rianiac

/85 12 /85 12/g/85 -

8512260347 851216 PDR TOPRP EMVEXXN C PDR

~ . . _ _ _ _ _ _ _

urg'o UNITED STATES l g 8 o NUCLEAR REGULATORY COMMISSION y E WASHINGTON, D. C. 20555 t  %*****/ December 16, 1985 Mr. J. C. Chandler, Lead Engineer r Reload Fuel Licensing '

Exxon Nuclear Company, Inc.

I 2101 Horn Rapids Road r

Post Office Box 130 l.

Richland, Washington 99352

Dear Mr. Chandler:

SUBJECT:

ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT XN-NF-507(P).

SUPPLEMENTS 1 AND 2, " ENC SETPOINT METHODOLOGY FOR C.E. REACTORS-STATISTICAL SETPOINT METHODOLOGY" We have completed our review of the subject topical report submitted by the L Exxon Nuclear Company, Inc. (Exxon) by letters dated September 29 and November 10, 1982. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The L evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report I and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that .

Exxon publish accepted versions of this report, proprietary and non-proprietary,  !

within three months of receipt of this letter. The accepted versions shall

~ incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Exxon and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective

applicability of the topical report without revision of their respective documentation.

! Sincerely, ps; WU] '

Herbert N. Berkow, Dire or

! Standardization and Special Projects Directorate l Division of PWR Licensing-B

}

Enclosure:

As stated 5

k

  1. - _ _ _ _ _ _ . . . _ _ . ., . _ . _ _ . _ .