ML20138P591

From kanterella
Jump to navigation Jump to search
Motion for ASLB Order to Compel Joint Intervenors Response to NRC 851007 Interrogatories Re Emergency Planning. Certificate of Svc Encl.Related Correspondence
ML20138P591
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/20/1985
From: Bordenick B
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Atomic Safety and Licensing Board Panel
References
CON-#485-577 OL, NUDOCS 8512260183
Download: ML20138P591 (4)


Text

Q

. December 20, 1985

-e StuTED cowep cm e.gc UNITFn STATES OF AMERICA

.I C

- NUCLEAR: REGULATORY COMMISSION 4

e

'85 DEC 23 A!0:19

.8EFORE THE ATOMIC SAFETY AND' LICENSING BOARD m

~

Jin the Matter'of'

-)

-d$i.

)

. GEORGIA POWER COMPANY-

')-

Docket Nos. 50-424

'et.al.

-) 425 T

-)

(0L)

_(Vogtle: Electric Generating Plant,~)

Units 1
and 2)

)

'NRC STAFF MOTION TO' COMPEL DISCOVERY--

1. _

On October. 7,1985, the NRC staff (Staff) ' propounded Emergency 1

E Planning' Interrogatories to Joint Intervenors in'this proceeding.

, l Pursuant;totheLiciensing' Board'sSeptember 19, 1985 " Order (Setting

~

TDiscov'ery Sche'dule.for Emergency Planning Contentions)" responses to

' thes'e" Interrogatorieswere due by November 7,11985.

2.
On-November. 14, 1985, the. undersigned-Staff Counsel contacted

? by telephone Mr. Tim Johnson, a representative of Joint Intervenors, to advise that-ithe Staff hadlnot received a. response to the. Interrogatories.

~' Several additional, phone conversations ensued between the undersigned and

-a Mr. Johnson and on November 27, 1985, at Mr. Johnson's request, a copy of-

~

m the October;7,1985,5 Interrogatories was again forwarded to Mr.

Johnson'.'Ib

( 1/: !!t ist unclear. as to whether' Joint Intervenors-are claiming that none a

of their representatives received the October 7, 1985, mailing of the F~'

-Interrogatories. A second copy was mailed in an effort to-

' facilitate preparation of_.a response.

.I-8512260183 851220 DR ADOCM 05 g4 m

=DSo%

c

it

' tM '.

-2 3.

To~ date, the S'taff has not received answers to the

~

Interrogatories in question. - Additionally, Staff Counsel's further attempts to pursue this. matter with Mr. Johnson by telephone have.been unsuccessful.

4.

~ Accordingly, the Staff respectfully moves the Atomic Safety and Licensing Board to issue an Order directing the Joint Intervenors to immediately respond'to the Staff's October 7, 1985 Interrogatories.

Respectfully submitted, M

Bernard M. Bordenick Counsel for NRC Staff

Dated -gt Bethesda, Maryland this to day of-December 1985 5

~

m

~ q UNITED STATES OF AMERICA NUCLEAR REGULATORY-COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

GEORGIA POWER COMPANY,

)

Docket Nos. 50-424 et al.

)

50-425

)

(OL)

(Vogtle Electric Generatir.g Plant, Units-1 and 2)

CERTIFICATE OF EERVICE I hereby certify that copies of "NRC STAFF MOTION TO COMPEL DISCOVERY"

^in the'above-captioned proceeding have.been served on the following by deposit in the United States mail, first. class or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's mail system, this Zo th day. of December,1985.

Administrative Judge

-Mr. Gustave A. Linenberger, Jr.*

Morton B. Margulies, Esq., Chairman

  • Atomic Safety and Licensing Board.

Administrative Judge Atomic Safety and Licensing Board Panel Panel

.U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555-Washington, D.C.

20555 Dr. Oscar H. Paris

Administrative Judge Region 1 Counsel Atomic Safety and Licensing Board-U.S. Nuclear Regulatory Comission Panel

-Suite 3100

U.S. Nuclear Regulatory Commission 101 Marietta Street Washington, D.C.

20555 Atlanta, GA 30303 Bruce W. Churchill, Esq.

Douglas C. Teper David R.-Lewis, Esq.

1253 Lenox Circle Shaw, Pittman, Potts & Trowbridge Atlanta, GA 30306 1800 M Street, N.W.

Washington, D.C.

20036 i

7-

..c.,.,.

~

' Atomic ' Safety an'd licensing ~

Laurie Fowler, Esq.

Board Panel

  • 218 Flora Ave. NE U.S. Nuclear Regulatory. Commission

. Atlanta, GA 30307 Washington, D.C.

20555.

Docketing and Service-Section*

Atomic Safety and Licensing 1

0ffice of _the Secretary Appeal Board Panel *

.U.S. Nuclear _Regulartory_Connission U.S. Nuclear Regulatory Commission

' Washington, D.C.

20555 Washington, D.C.

20555 udames E. Joiner,;Esq. _

-Ruble A. Thomas

Troutman, Sanders,-Lockerman, Southern Company Services, Inc.

&-Ashmore P.O. Box 2625 127 Peachtree-Street, N.E.

. Birmingham, AL 35202

Candler BLilding, ~ Suite 1400 Atlanta, GA.30043

_NRC Resident Inspectors P.O. Box 572 Tim Johnson Waynesboro, GA 30830 Executive Director Campaign fo'r a Prosperous Georgia H._ Joseph Flynn, Esq.

1083 Austin Ave. NE Assistant General Counsel Atlanta, GA 30307 Federal Emergency Management Agency 500 C Street, S.W.

Washington, D.C.

30472 Steven M.-Rochlis Regional Counsel ~

Federal Emergency Management Agency Suite 700 1371'Peachtree Street, N.E.

. Atlanta, Georgia 30309 M

Bernard M. Bordenick Counsel for NRC Staff

~

i