N Indian Ibint 3 Nuclear Ibwer Plant PQ Box 215 Buchanan. NewYork 10511 914 739.8200
- > NewYorkPower En"3;t'.;7,"
4# Authority December 13, 1985 IP-WDH-2913 Dr. Thomas Murley, Regional Administrator U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
IE BULLETIN 82-02, DEGRADATION OF THREADED FASTENERS IN THE REACTOR COOLANT PRESSURE BOUNDARY OF PWR PLANTS
REFERENCE:
1.
IP-JAS-2711 of August 3, 1982 J. C. Brons to R. C. Haynes
Dear Dr. Murley:
This letter provides the IP3 final response to IE Bulletin 82-02. provides the information requested by Action Items 1, 2 and 4 of the subject bulletin. Reference 1 responded to Action Items 3 and 5.
Very truly yo rs, h-7 llam. Jo iger Residen Ma ger Attac ent 1 cc: Resident Inspectors' Office cunac;;:CED AN3 OJC 1 TO CEFORE ME TH!S- /d--- D AY OF..hC4nbf/ b5-7 p&w & OeW" RUTHANNE D. BOWMAN Notary Public. State of New York No. 4G51904 Westct's;ter County Commission Expires March 31.1337 N
8512240347 851213 PDR ADOCK 05000286 3
\\
0
\\ ',
ATTACHMENT 1 Action Item 4a:
Include a statement that Action Item I has been completed.
Response
Details of the four key elements as discussed in Action Item 1 are included in the maintenance procedures and step lists as they are prepared.
In addition, these maintenance practices will be included in the training accreditation program to further enhance the overall knowledge of the maintenance mechanics.
Procurement and application of fastener lubricants and injection scalant compounds are included in the normal quality assurance process for fasteners which fall within the guidelines of this bulletin.
Based on the above, the Authority considers Action Item 1 complete for any components that have been opened.
Action Item 4b:
Identification of the specific connections examined as required by Action Item 2.
Response
The following is a list of closure connections which have been opened for component inspection or maintenance since the issuance of this bulletin.
With the exception of the Reactor Coolant Pumps Number 1 Seal Housing bolts, all the threaded fasteners for these closures were replaced with new fasteners as a good maintenance practice. This was done in lieu of the examinations recommended by Action Item 2, since this was felt to be the most conservative approach to address the concern of possible bolt degradation.
The #1 RCP Seal Housing Bolts (Carbon Steel Chrome Plated Studs ASTM-A-574) were removed, visually inspected by the vendor and reinstalled. No degradation was observed on these bolts.
- PCV-464, 6" Pressurizer Safety Valve
- PCV-466, 6" Pressurizer Safety Valve
- PCV-468, 6" Pressurizer Safety Valve
- 31 thru #34 Steam Generators Manways
- Pressurizer Manway
- Reactor Coolant Pumps #31 thru #34 number 1 Seal Housing j
Page 1 of 2
- s,-
g Action Item 4c:
The results of the examinations performed on the. threaded fasteners as required by Action Item 2.
If no degradation was observed for a particu-lar connection, a statement to that effect, identification of the con-nection and, whether the fasteners were examined in place or removed is all that is required._ If degradation was observed, the report should provide detailed information.
Response
During the Summer 1985 refueling outage the visual examination conducted on PCV-464, 466, 468 and #31 thru #34 Steam Generator Manways showed no degradation of the threaded fasteners. Therefore, existing bolting was utilized in all instances.