Forwards Evaluation of WCAP-10665-P, Ex-Core Axial Power Monitor. Rept Acceptable for Referencing in License Applications.Proprietary & Nonproprietary Versions Should Be Published within 3 Months of Ltr Receipt
ML20138P109
Person / Time
Issue date: 10/28/1985
From: Thomas C
Office of Nuclear Reactor Regulation
To: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20138P111 List:
References
NUDOCS 8511060405
Download: ML20138P109 (2)


Text

,

October 28, 1985 Mr. E. P. Rahe, Jr. , Manager Nuclear Safety Department Westinghouse Electric Corporation Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Rahe:

SUBJECT:

ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT WCAP-10665-P, "EXCORE AXIAL F0WER MONITOR" We have completed our review of the subject topical report submitted by the Westinghouse Electric Corporation (Westinghouse) by letter dated September. 18, 1984. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report

, and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versicns shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Westinghouse and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely, DISTRIBUTION:

Central ?FileyCTheraas

'SSPB/ihiadirig PDiggs POR HRichings Origir.a1 signed by DCS BBuckley Lecil 0. Thenas, Chief PNoonan Standardization and Special FBernard Projects Branch HBertow Division of Licensing

Enclosure:

As stated 0

n n:ac 85 10f rd 85 10/y/85 i h 10 @ 5 8511060405 851020 l

' $DR TOPRP ENVWEST PDR

_ -- - _ ._ ~. - .

fc nun 'o UNITED STATES

[ ' ~,j NUCLEAR REGULATORY COMMISSION O ;E WASHINGTON, D. C. 20555

% ,,,,, October 28, 1985 Mr. E. P. Rahe, Jr., Manager Nuclear Safety Department Westinghouse Electric Corporation Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Rahe:

SUBJECT:

ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT WCAP-10665-P, "EXC0PE AXIAL POWER MONITOR" We have completed our review of the subject topical report submitted by the Westinghouse Electric Corporation (Westinghouse) by letter datcd September 18, 1984 We find the report to be acceptable for referencing in f license applications to the extent specified and under the limitations .

delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

_ Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated Westinghouse and/or the applicants referencing the topical report will be expected to revise and '

resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely,

&A 0.  % ^.;

Cecil 0. Thomas, Chief Standardization and Special

, Projects Branch Division of Licensing l

Enclosure:

As stated l