OCT 2 31985 l

l Westinghouse Electric Corporation ATTH: Mr. E. P. Rahe, Jr. , Manager Nuclear Safety Department Nuclear Technology Division Box 355 Pittsburgh, Pennsylvania 15230 Gentlemen:

, The enclosed letter dated May 10, 1985, informed you of the issuance of a bill for partial review of ten topical reports pursuant to the pro-l visions of 10 CFR 170 of the Comission's regulations. Bill No. D0288 was issued on May 13,1985, for $104,206 and covered the period from filing of the reports through June 23, 1984. A final bill was issued to your Corporation on July 18, 1985, with an additional notice sent on August 13, 1985, showing principal, interest and penalty charges through August 13. The penalty charges, in accordance with 4 CFR 102.13(e),

accrue beginning 30 days from the original billing date. Accordingly, the penalty charge as of August 13, 1985, was actually $1,079.19 ($17.13 x 63 days) rather than $51.39 (3 days) as shown on the previous bill.

As of the date of this letter, payment has not been received. Interest on the bill continues to accrue at the rate of $25.69 per day with penalty charges of $17.13 added per day until payment is received.

Section 170.41 of 10 CFR 170 provides that:

"In any case where the Commission finds that an applicant or a l licensee has failed to pay a prescribed fee required in this part. I l the Cocnission will not process any application and may suspend or I I

revoke any license or approval issued to the applicant or licensee l or my issue an order with respect to licensed activities as the

, Cocmission determines to be appropriate or necessary in order to i carry out the provisions of this part, Parts 30, 32 through 35, 40,  ;

l 50, 61, 70, 71, 72, and 73 of this chapter, and of the Act." '

10 CFR Part 15 provides that the NRC my refer claims for payment of debts owed the United States to the General Accounting Office or to the Department of Justice for collection.

gib You are hereby notified that as of October 15, 1985, the principal is .go I

$104,206, interest is $4,007.64 (156 days), and penalty charges are fy 52,158.38(126 days), for a total of $110,372.02. You should add

~.. i l l

~ ~ " > 8511060115 051023 PDR l

C TOPRP ENVWEST -

.... . , PDR j .

! __ l i_ _ .- . _ d __ _ _ _ _ _ _ . _ _ _ __ _ l . _ _ _ , _ __

un row m now nacu ano OFFICI AL RECORD COPY .

k l

00T 2 31335 Westinghouse Electric Corporation 2 appropriate interest and penalty to your payment for the period beyond I October 15 to the date of payment. If payment (principal, interest and penalty through date of payment) is not received by us within 15 days 1

free the date of this letter, we will take action in accordance with 10 CFR 170.41 and/or 10 CFR 15.21, as appropriate. All checks should be made pgable to the U.S. Nuclear Regulatory Casuiission and forwarded to i

the Office of Resource Management.

Sincerely.

On no..d signed by w m. o, m uer

Willian 0. Miller, Director

! License Fee Management Staff Office of Administration

Enclosures:

i 1. 5/10/85 letter and enclosure 2.

1 i

Bill D0288 for $110.372.02 cc w/encis:

i Mr. R. A. Wiessmann Manager of Regulatory and Legislative Affairs Nuclear Technology Division P.O. Box 355 - M.N.C. 451 Pittsburgh, PA 15230 CERTIFIED MAIL

. RETURN RECEIPT REQUESTED DISTRIBUTION:

PDR Ido Ard.

Ugylatory Recordq (016) db #

H3ernard, SSPB WIoJacf LSolander, PRAB rdo Jnd RRakowski, RM/A w/a ud i

MRodriguez, RM/A rg/&>cA 2

RSmith, ELD (40 Jwd.

LFMS SP Actual M/P File M/ff'd* #

l LFMS WEC Topipal File (dhd' >

CJHollaway W/ bcf.>

RMDiggs w/ W .>

LFMS R/F W o uct.

OF FICE > ,,LF :AD LFMS: OELD LFM RMMM ,,,,,,,,,,,,, ,,,,,,,,,,,,,

s-> RMD,1M,f;p., ,,C ay, ,,RSmjt,,,,,, ,,WOMi,,er,,,, ,,8?ahowshj,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,

one) . . ././.I.. /.85 10 10

..../.[.85... .. . . 7.\ /.85. . .. .10.

. 10./.1.7./.85. . 10./. ,

. . (g. f./.85. . . ............. .. ..........

une ronu sys no em uncu o2" _ _ , _ _ . OFFICI AL RECORD COPY _ _ _ _ _ _ _ _ _ _ _

C orm ane erLL kvM;tRaori on remortancto BILL FOR COLLECTION

.D0288 MAKE CHECK $ PAY ASLE TO THE U S NUCLE AR REGULATORY COMutSSION AND MAIL 70 sill DATE U.S. NUCLE AR REGULATORY COMMISSION 5/13/85 P AvMENT out DAtt OFFICE OF RESOURCE MANAGEMENT '

DIVISION OF ACCOUNTING AND FINANCE 6/13/85 actNst huvat R tir apphcab /e/

WASHINGTON, DC 20555 ,

g i .

REF LRL%CL NUMaLR iff spphcabre}

Westinghouse Electric Corporation ATTN: Mr. E. P. Rahe Jr., Manager s

] [ ,'co3 ^ c ' :

Nuclear Safety Department ,

Nuclear Technology Divisicti s Janet M. Rodriguez Box 355 '"*"""E

    • ^ ""*'"

Pittsburgh, PA 15230 o L M 'o, l'492-4200 DESC R IPTION AMOUNT Topical Reports and Review Cost (see attached) $104,206.00 -

Interest accrued through 10/15/85 (156 days 0 $25.69 p/d) 4,007.64 Penalty on delinquent debt through 10/15/85 (126 days @ '

$17.13 p/d) 2,158.38 Interest originally charged according to provisions of Debt Collection Procedures in 10 CFR Part 15.21(a)(2).

The bill is properly subject to the Federal Claims Collection Standards' interest accrual provisions in \

4 CFR 102.13(b) and penalty charges on delinquent debts in 4 CFR 102.13(e).

INTEREST AND PENALTY WILL CONTINUE TO ACCRUE THROUGH DATE OF PAYMENT.

I g

\

4

  • s e i

AMOUNT DUE f' ts e re mse $110,372.02 TE RMS. Interest will accrue from the bill date at tt e annual rate of 9.00 s.e. cept inai no interesi . ii be cha. e y ihe amou i due is

pad in full by the payment due date.

NOTE. The NRC debt collection regulations are found in 10 CFR 15 and are based on the Federal Claims Collection Act as emended by the Debt Collection Act of 1982. If there are any questions about the existence or amount of the debt, refer to these regulatior.s and statutes,cir coatatt the indivedual named above. The revocation of a license does not waive or af feet any debt then dig the NRC f rom the f ecensee.

PIESENT AND SEPARATED EMPLOYEES: The attached Notice of Due Process Rights applies to both current and former employees.

s m m.- ..,, -- , - - -

-r - -n.-- -,

_ , _ _ - -~

~

1 i* [*';0!.4? 1 LIST OF TOPICAL REPORTS AN? REVIEW COSTS Company name and address:

Westinghouse Electric Corporation ATTN:

Mr. E. P. Rahe, Jr. , Manager Nuclear Safety Department Nuclear Technology Division Box 355 I

Pittsburgh, PA 15230 l,

NRC s Report No. and Title Control No.

i Review Status Review Costs 1.

~

WCAP-9528/9529 on ECCS Evalua- 05209 Pending 56,552 tion Model for WEC Fuel Reloads of CE NSSS - 6/79 version. (168 hrs. X 539) s s 2. WCAP-00639 on Small Break 05360

~

Pending $16,497 Accidents for WEC NSSS with Upper Head Injection (12/79) (423 hrs. X $39) 3.

WCAP-9398 on WEC SG Re-turbine 11430 Pending

, $10,881 and Refurbishment (2/79)

4. (279 hrs. X $39)

WCAP-9753/9754/9744 on Inadequate 42296 Pending

'x Core Cooling Studies of $468 Scenarios with Feedwater (12 hrs. X $39)

A'vailible Using the Notrump Compu,ter Code (6/80)

\

w 5. WCAE-10106 on A Description of 48566 the Nuclear Design and Analysis Pending $20,000 t

Programs for BWRs (6/82) (127 hrs. X $39 +

$23,000 in contract.

6. WCAP-8264/8312 on WEC LOCA 485B0 Pending $9,341 Mass & Energy Release Model for Containment Design - (239.5 hrs. X 539) 1 March 1979 Version (4/79)

, 7. WCAD-10125 on Extended Burnup 48689 Pending $8,962 Evaluation of Westinghouse

, Fuel (7/88) (58 hrs. X $39 +

s

. 56,700 in contract.)

1 s,

.- continued on next page

.._........-.-~~~~~~~~*"~'****"1**"'~~' * *~P~~~~ *~

- - _ _ _ _, . _ _ __ _.~..__ _ _ _ _

__ _ __ , _ -- .- - ^^^

i ,

ENCL O5'J : 1 L1510F TOPICAL REPOC.15 AND REVIEW COSTS Company name and address:

1 N2c.

Report No. and Title Control No. Review Status Review Costs

8. WCAP-10079 on Notrump 49129 Pending 55,772 Nodal Transient Small Break and General (148 hrs. X 53i Network Code (11/82) *
9. WCAP-10054 on Westinghouse 49326 Pending 55,733 Small Break ECCS Evaluation Model Using Notrump Code (147 hrs. X 539; (12/82)
10. WCAP-10266/10337 on An 52029 Integrated Core and RCS Pending $20,000 Reflood Core for Analysis (68 hrs. X 539 +

of PWR LOCAs (5/83) $25,000 in contra:

4 Total A.osr.t Dse: 5104,206 2