Suppls Response to NRC Re Violations Noted in Insp Rept 50-244/85-18.Corrective Actions:Administrative Procedures Will Be Revised to Clarify Use of Health Physics Series Procedures as Calibr Procedure
ML20138N858
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/13/1985
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8512240186
Download: ML20138N858 (2)


Text

'f, w

.I f ';;;p A

f'

+

F37 DV :

..-. If Ak y$f p

f

~~

b l2d1 gN1 Knn)

.. l ROCHESTER GAS AND ELECTRIC ^ CORPORATION e 89 EAST. AVENUE, ROCHESTER,'N.Y.' 14649-0001

'i 1

)

y

' ROGER W. (OBER -

VsCE PRESIDE NT.

TELEPMO*st ELecTec a stEAu pnoouctsON n=EA CODE 7 e 546 2700.

I$

w December 13, 1985 i

Mr.' Thomas Ti Martin, Director

. Division of Radiation Safety and-Safeguards U.S. Nuclear' Regulatory Commission Region:I 631-Park Avenue iKing;of, Prussia,~PA':19406-

Subj ect
: IEE. Inspection Report No. 85-18 Supplemental Reoponse.

~

iR.E. Ginna: Nuclear : Power Plant.

Docket No. 50-244

Dear Mr.' Martin:

In our; Novemb'er 15',

19'85 response to-the Notice of=

Lviolations* associated -with IEE Inspection Report No. 85-18, we 11ndicated.that within_30-days.of the date-of'that response,..a plan 3and-schedule would-be. submitted to you addressing;your

concerns with. respect to; the. " broader problem" 3 regarding' the

^

JQA/QC program:as it; applies to the' calibration program.at Ginna' -

Station.~- _.This letter is-.to confirm.to you that1.a' plan and schedule'has:been' developed and is.hereby transmitted to you.

._ Following~ our response to - the subject -Inspection Report 85-18, Jour corporate Quality Assurance. Group conducted a' review:

of recent-NRC Inspection' Reports that addressed similar. problems.

LSpecifically the'following-inspection reports-were identified:

Insoection-Reoort Problem

.IR-85-04

. The digital multimeters were not part of. a. formal program and the:

. multiamp :: test set._ &. crimping tool were overdue for calibra-

~

tion.--

~IR 85-05 The. load cell.used.during the Spent Fuel Pit Rack modification was not calibrated when used during rack drag tests.

d512240186 851213.

rv PDR-ADOCK 05000244 c;m,

qg PDR g.

  1. 0

,g

. : c..u. u

..n.

I c _ *:

. <-m c

' ROCHESTER Gks AND ELECTRIC CORP.

SHEFT NO. 2 '

g

'.DATE December:13,E 985 1

To -:

Mr. Thomas T.-Marcin, Director

-IR 85-10 The 'CV Temperature.' Monitoring :

system was not part of.a formal program butEwas.used as a back-up fire detection. system.

IR 85-18

- Environmental. Monitoring instruments not part of a formal program.-

Based on[ this review..and subsequent concern analysis, it-

~

'became evident that the plant's : implementation ~of. the Calibration Program ~was not satisfactory and thi's. appears to be a contributing

-factor to your_" broader, scope" concerns.

In order.to address-the results of the broader. scope. concern i analysis,J the' following iactions have_ been taken and are planned

=q

. to.be taken.

First,_the' specific items. identified _'in Inspection Report 85-04 that did. not i comply with the Calibration: Program.

1 requirements have been corrected. ~Second,.a review of.all "HP"

. series procedures _that address. instrument. calibration against the E

requirements of ANSI N-18.7 L will be conducted and these same procedures will'be revised'as necessary.

In concert'with this review, Administrative proceduresLwill be:revisedLto clarify.the useLof the "HP";seriesfprocedures as a calibration proce' dure,and y

oto assure:that:the requirement:of. ANSI N-18.7 regarding frequencyL erg -

- s ?og; calibration, accuracy 1of J calibration as : well. as - overall.

~

^

. responsibility-for scheduling calibration are addressed.

Finally,(the planned f action to prevent ' recurrence of this y

problem ;is that during Quality control -group's surveillance of:

- plant' activities,- instruments being calibrated as well ~as ;the instruments _ utilized to perform - the calibrations ~and/or' tests will be' verified to ' be - properly addressed in' the calibration

, program..

i-These actions.will beiimplemented.and completed by February

[

. 2,.1986.

i

'V Truly Yours,.

^

b#

Ro W. Kober

~

. Subscribed and swornito me

on this.13th day f

cember, 1985-g f

= V. b LYNN L HAUCK NOTARY PUBUC, State of N.Y., Monroe County iMy Commission Expires March 30,19b l