Discusses Methods Used to Assess Extremity Doses,Per Insp Rept 50-320/84-21 on 841213.Implementation of New, Less Conservative Method Will Not Be Completed Until 861001
ML20138N600
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/31/1985
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To: Travers W
Office of Nuclear Reactor Regulation
References
0345A, 345A, 4410-85-L-0216, 4410-85-L-216, NUDOCS 8511050250
Download: ML20138N600 (2)


Text

GPU Nuclear Corporation g

gf Post Office Box 480 Routa 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8461 4410-85-L-0216 Document 19 0345A October 3T, 1985 u

O

~.

M

-8 k#

w TMI Program Office El N

Attn: Dr. W. D. Travers y

Acting Program Director US Nuclear Regulatory Commission I'

c/o Three Mile Island Nuclear Station Middletown, PA 17057

Dear Dr. Travers:

Three Mile Island Nuclear Station, Unit 2 (THI-2)

Operating License No. OPR-73 Docket No. 50-320 Inspection Report 84-21 Inspection Report 84-21, dated December 13, 1984, concerned a routine announced safety inspection of the Radiological Controls (Rad Con)

Program at TMI-2. During this inspection, the Extremity Dose Assessment Program was reviewed. As stated in Section 7.0 of the report, the NRC determined that tne program for assessing extremity doses was acceptable by current industry standards. The inspector reported, however, that the methods used in assessing extremity doses were conservative and this resulted in extremity doses being over reported. To more accurately reflect the extremity doses, GPU Nuclear committed to two (2) action items. The first was to resolve adninistrative, logistic and computer software issues related to the implementation of a new method for assessing extremity doses by the end of the first quarter of 1985. Inis action was completed on March 21, 1985. The second was to implement the new method, including retroactive data modification to 1979, by November 1985. Due to the assignment of personnel to other priority work (e.g.,

REM on line system modifications), this action will not be completed by 8511050250 851031 PDR ADOCK 05000320 G

PDR 0

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation g

Or. W. D. Travers October 31, 1985 4410-85-L-0216 November 1985. As discussed with Mr. R. Cook of your staff on October 25, 1985, it currently is projected tnat this action will be completed by October 1, 1986.

If you have any questions, please contact Mr. J. J. Byrne, of my staff, at extension 8461.

Sincerely,

/,

F. H. Standerfe Vice President / Director, THI-2 FRS/JCA/eml Regional Administrator - Office of Inspection and Enforcement, Dr. T. E. Murley cc: