Text
_
6 n.. g,-
e-10CFR50.71(e) '
9 Boeton Edison Pilgrern Nuclear Power Staton Rocky Hdi Road Plymouth, Massachusetts 02360 E. T. Boulette, PhD Senior Vice President - Nuclear February 19, 1997 BECo Ltr. 2.97.019 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 i
r Docket No. 50-293 License No. DPR-35 i
Final Safety Analysis Report - Revision 20 t
- An incorrect page was used when Revision 19 of the Pilgrim Station Final Safety Analysis Report was printed. We are issuing this revision to the FSAR at this time to correct this page and to l
correct another minor error. This submittal has been designated Revision 20.
Enclosed is the List of Effective Pages for Volume 5 of the Pilgrim FSAR and new corrected pages.
If you have any questions, please contact Marie Lenhart at 508-830-7937.
g
. T. Boulette l
MTL\\dmc\\radmisc\\FSAR20
]
original and 10 copies i
cc:
Mr. Alan B. Wang, Project Manager Project Directorate I-1 Office Of Nuclear Reactor Regulation Mail Stop: 14B2 l
1 White Flint North
'11555 Rockville Pike fghj Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road -
King of Prussia, PA 19406 Senior Resident inspector l
Pilgrim Nuclear Power Station 9702250462 970219 7 PDR ADOCK 05000293 f-K PDR