ML20138M565
| ML20138M565 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/21/1997 |
| From: | Gaudet T ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-97-0031, W3F1-97-31, NUDOCS 9702250435 | |
| Download: ML20138M565 (2) | |
Text
-2e4 a.4 a.)-.&
-a#.+
4_
amJ.4_,,.
._m.-q 4_i,_<
4 4MA..g_+.1_,+4 4
4-a
,,.4w-4d 1% +...
,m.Js+--g,.
,i,u,1,
_J+, _
A,Se, y
.,h_,_=a df i,
- leL i;---,52 6
4A fintergy p;.g-me.. mc.
=
Operations KJiona LA 70066 Tel 504 739-6650 4
l W3F1-97-0031 A4.05 PR 1
February 21,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Severe Accident Management Enhancement Schedule Change Gentlemen:
The purpose of this letter is to advise the NRC of a change to the schedule to make voluntary enhancements at Waterford 3 based on the Severe Accident Management Guidance in NEl Report 91-04, Revision 1. In previous correspondence dated March 30,1995, it was indicated that such enhancements would be made by July 1, 1997. However, other initiatives such as conversion to the improved Standard Technical Specifications, Maintenance Rule implementation, and the design basis upgrade have caused the need to move this schedule back to December 31,1998.
The revised schedule is consistant with the date that NEl recommends for implementation of the enhancements.
i
/LD/'o 250103 9702250435 970221 F
PDR ADOCK 05000382 P
pop 1
l Severe Accident Management Enhancement Schedule Change W3F1-97-0031 Page 2
-1 February 21,1997 If you have any questions regarding this letter, please contact Roy Prados at (504) 739-6632 or Tim Gaudet at (504) 739-6666.
i Very truly yours,
~
r T.J. Gaudet l
Acting - Director Nuclear Safety & Regulatory Affairs TJG/RWP/ssf cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR -
l R.B. McGehee N.S. Reynolds NRC Resident inspectors Office D.J. Modeen (NEI) 4 i