MONTHYEARML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J0781999-06-14014 June 1999 Summary of 990512 Meeting with Util in Rockville,Md Re Licensee Renewal Activities for Calvert Cliffs Nuclear Power Plant.List of Meeting Attendees & Slides Used by NRC & Util Encl ML20206S2841999-05-19019 May 1999 Summary of 990427 Telcon with Util Re Recent Secondary Side SG Insp Activities at Plant,Unit 2.Replacement SGs Are Planned to Be Installed in Spring 2002 for Units 1 & 2 ML20207A3041999-05-18018 May 1999 Summary of 990505 & 10 Telcons with Util Re License Renewal Application on Metal Fatique ML20206U5621999-05-17017 May 1999 Summary of 990428 Meeting with Bg&E in Rockville,Md to Discuss Plant Steam Generator Replacement Projects.List of Attendees & Meeting Handouts Encl ML20204H5911999-03-19019 March 1999 Summary of 990210 Meeting with Bge in Lusby,Md Re License Renewal Activities for Ccnpp,Units 1 & 2 & Use of age- Related Degradation Insps as Outlined in 990202,meeting Announcement.List of Attendees & Slides Encl ML20204H4541999-03-19019 March 1999 Summary of 990216 & 18 Meetings with Util in Lusby,Md Re License Renewal Activities for Plant,Units 1 & 2.List of Meeting Attendees & Summary of RAIs That Were Discussed by Staff with Bge Staff & Info Obtained from Bge Staff Encl ML20202J7131999-01-28028 January 1999 Summary of 990107 Meeting with Util Re Info Provided by Util for Severe Accident Mitigation Alternative (SAMA) Review & Site Audit ML20198K6461998-12-28028 December 1998 Summary of 981202 Meeting with Util in Rockville,Md to Discuss Proposed TS Amend Allowing Installation of Sleeves in Defective SG Tubing in Calvert Cliffs,Units 1 & 2.List of Attendees & Presentations Slides Provided by Licensee Encl ML20198B8351998-12-11011 December 1998 Summary of 980820 Meeting with Util in Rockville,Md to Discuss Progress of NRC Staff Review of Util License Renewal Application & Provide Overview of Proposed Method for Evaluating Performance.List of Attendees & Slides Encl ML20198A4201998-12-11011 December 1998 Summary of 981022 Meeting with Util in Rockville,Md to Discuss How Bge Addressed License Renewal Requirements for time-limited Aging Analyses & Generic Safety Issues as Applicable to Environ Qualification ML20198A2741998-12-10010 December 1998 Summary of 981123 Meeting with Bge Re Review of Plant Records Associated with Chemistry,Allow 600 & Boric Acid Corrosion Insp Programs Relied Upon in Bge License Renewal Application for Plant,Units 1 & 2 ML20195J0391998-11-16016 November 1998 Summary of 980928 Meeting with Util in Rockville,Md Re License Renewal Activities for Plant,Units 1 & 2 & to Provide Rept Card for Both NRC & Util ML20196A1821998-11-13013 November 1998 Summary of 980624 Meeting with Util in Rockville,Md Re Integrated Plant Assessment Process for License Renewal.List of Attendees & Slides Encl ML20195H9311998-11-13013 November 1998 Summary of 980626 Meeting with Bg&E in Rockville,Md Re Bg&E Structures & System Walkdown Program for License Renewal. List of Meeting Attendees & Bg&E Presentation Slides Encl ML20195F9571998-11-13013 November 1998 Summary of 980625 Meeting with Bg&E in Rockville,Md Re Bg&E age-related Degradation & Insp Program for License Renewal. List of Meeting Attendees & Slides Used by Bg&E Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20195D4401998-11-13013 November 1998 Summary of 980813 Meeting W/Bg&E in Rockville,Md to Discuss Bg&E Fire Protection Evaluation,Section 5.10,contained within License Renewal Application.List of Attendees & Presentation Slides Encl ML20195F3961998-11-13013 November 1998 Summary of 981029 Meeting W/Nei,Bge & Duke Energy Re Status of License Renewal Activities.List of Attendees & Slides Presented by Bge for Status of Calvert Cliffs License Renewal Application Review Encl ML20151Z5801998-09-0707 September 1998 Summary of 980506 Meeting with Bg&E in Rockville,Md Re Util Proposed Responses to 980213 & 19 NRC Staff Requests for Addl Info on Bg&E License Renewal Feedwater Sys (5.9) & Dfos (5.7).List of Attendees & Util Proposed Responses,Encl ML20237C4651998-08-19019 August 1998 Summary of 980729 Meeting W/Bg&E & Contractor SG Team in Rockville,Md Re Plant,Units 1 & 2 SG Replacement Project. List of Attendees & Viewgraphs Distributed at Meeting Encl ML20236X6501998-07-28028 July 1998 Summary of 980709 Meeting W/Baltimore Gas & Electric Co in Solomons,Md Re Plant Environ Scoping Meetings to Support Review of License Renewal Application.List of Attendees & Presentation Matls Encl ML20249A9271998-06-16016 June 1998 Summary of 980604 Meeting W/Licensee in Rockville,Md to Discuss Replacement of Svc Water Heat Exchanges During Spring 1999 Refueling Outage on Unit 2.List of Attendees & Licensee Agenda Encl ML20247M4981998-05-15015 May 1998 Summary of 980319 Meeting W/Util Re Improved Tss.List of Attendees Encl ML20217K5921998-04-20020 April 1998 Summary of 980407 Meeting W/Util Re Control Room Habitability Issue W/Main Steam Line Break.List of Attendees,Util Presentation Matls & NRC Concept of CR Ventilation Sys Encl ML20216C8991998-04-10010 April 1998 Summary of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20203E0011998-02-12012 February 1998 Summary of 980126 Meeting W/Bg&E Re Plant,Units 1 & 2 Improved Ts.List of Attendees Encl ML20199B4121998-01-20020 January 1998 Summary of 980114 Meeting W/Bg&E in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,improved Tss.List of Attendees Encl ML20198H4011998-01-0505 January 1998 Summary of 971208 Meeting W/Bg&E in Rockville,Md Re Plant Pra.List of Attendees & Viewgraphs Encl ML20197K2121997-12-15015 December 1997 Summary of 971112,13 & 18 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Clarification of Calvert Cliffs Improved Tss.List of Meeting Attendees Encl ML20211L9371997-10-0202 October 1997 Summary of 970827 Meeting W/Bg&E in Rockville,Md Re Reactor Pressure Vessel 10-year Inservice Inspection Project.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20216J9411997-09-10010 September 1997 Summary of 970903 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,service Water Modifications.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217B1771997-09-10010 September 1997 Summary of 970904 Meeting W/Bg&E in Rockville,Md Re Clarification of Calvert Cliffs Ts,Sections 1.0,2.0,3.1,3.1 & 5.0.List of Meeting Attendees Encl ML20217N9991997-08-21021 August 1997 Summary of 970731 Meeting W/Bge in Rockville,Md Re Severe Accident Mitigation Alternatives Methodology.List of Attendees & Presentation Matl Encl ML20217P0401997-08-21021 August 1997 Summary of 961204 Meeting W/Util in Rockville,Md Re Calvert Cliffs Improved Tss.List of Attendees Encl ML20198F1221997-08-0505 August 1997 Summary of 970730 Meeting W/Bge in Rockville,Md Re Plant Improved Ts.List of Attendees Encl ML20151J5531997-07-31031 July 1997 Summary of 970715 Meeting W/Bge in Rockville,Md Re Matters Related to Operability of SW Sys & SRW ML20148K7771997-06-16016 June 1997 Summary of 970605 Senior Mgt Meeting W/Util in Rockville,Md Re License Renewal Environ Rept (Er) Template Process.List of Participants & Handouts Encl ML20148H2211997-05-27027 May 1997 Summary of 970519 Meeting W/Bge in Rockville,Md to Discuss License Renewal Er Template Process.List of Attendees Encl ML20137W5311997-04-16016 April 1997 Summary of 970408 Meeting W/Util in Rockville,Md to Discuss Responses to Staff 960830 Rai.List of Attendees Encl ML20147G8651997-03-26026 March 1997 Summary of 970226 Meeting W/Bge in Rockville MD to Discuss Util Response to Staff 960830 Rai.List of Attendees & Matls Distributed at Meeting Encl ML20137E3501997-03-24024 March 1997 Summary of 970307 Meeting W/Bge in Rockville MD to Provide Comments on License Renewal Er Template Proposed by Util. List of Meeting Participants Encl ML20135E1721997-03-0404 March 1997 Summary of 970109 Meeting W/Bge in Rockville,Md to Discuss Results of 90 Day Review Effort Assigned at Last Mgt Meeting on 960911 & Future Review Activities.Attendee List & Meeting Handouts Encl ML20138K9151997-02-13013 February 1997 Summary of 970205 Meeting W/Bge in Rockville,Md Re License Renewal Er Template Process Proposed by Bge.List of Meeting Participants Encl ML20134J9311997-02-10010 February 1997 Summary of 970210 Meeting W/Bg&E in Rockville,Md Re Improved Tss.List of Meeting Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20133J5141997-01-16016 January 1997 Summary of 961016 Meeting W/Bg&E in Rockville,Md to Discuss License Renewal Program.List of Attendees & Handouts Encl 1999-09-08
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J0781999-06-14014 June 1999 Summary of 990512 Meeting with Util in Rockville,Md Re Licensee Renewal Activities for Calvert Cliffs Nuclear Power Plant.List of Meeting Attendees & Slides Used by NRC & Util Encl ML20206S2841999-05-19019 May 1999 Summary of 990427 Telcon with Util Re Recent Secondary Side SG Insp Activities at Plant,Unit 2.Replacement SGs Are Planned to Be Installed in Spring 2002 for Units 1 & 2 ML20207A3041999-05-18018 May 1999 Summary of 990505 & 10 Telcons with Util Re License Renewal Application on Metal Fatique ML20206U5621999-05-17017 May 1999 Summary of 990428 Meeting with Bg&E in Rockville,Md to Discuss Plant Steam Generator Replacement Projects.List of Attendees & Meeting Handouts Encl ML20204H5911999-03-19019 March 1999 Summary of 990210 Meeting with Bge in Lusby,Md Re License Renewal Activities for Ccnpp,Units 1 & 2 & Use of age- Related Degradation Insps as Outlined in 990202,meeting Announcement.List of Attendees & Slides Encl ML20204H4541999-03-19019 March 1999 Summary of 990216 & 18 Meetings with Util in Lusby,Md Re License Renewal Activities for Plant,Units 1 & 2.List of Meeting Attendees & Summary of RAIs That Were Discussed by Staff with Bge Staff & Info Obtained from Bge Staff Encl ML20202J7131999-01-28028 January 1999 Summary of 990107 Meeting with Util Re Info Provided by Util for Severe Accident Mitigation Alternative (SAMA) Review & Site Audit ML20198K6461998-12-28028 December 1998 Summary of 981202 Meeting with Util in Rockville,Md to Discuss Proposed TS Amend Allowing Installation of Sleeves in Defective SG Tubing in Calvert Cliffs,Units 1 & 2.List of Attendees & Presentations Slides Provided by Licensee Encl ML20198A4201998-12-11011 December 1998 Summary of 981022 Meeting with Util in Rockville,Md to Discuss How Bge Addressed License Renewal Requirements for time-limited Aging Analyses & Generic Safety Issues as Applicable to Environ Qualification ML20198B8351998-12-11011 December 1998 Summary of 980820 Meeting with Util in Rockville,Md to Discuss Progress of NRC Staff Review of Util License Renewal Application & Provide Overview of Proposed Method for Evaluating Performance.List of Attendees & Slides Encl ML20198A2741998-12-10010 December 1998 Summary of 981123 Meeting with Bge Re Review of Plant Records Associated with Chemistry,Allow 600 & Boric Acid Corrosion Insp Programs Relied Upon in Bge License Renewal Application for Plant,Units 1 & 2 ML20195J0391998-11-16016 November 1998 Summary of 980928 Meeting with Util in Rockville,Md Re License Renewal Activities for Plant,Units 1 & 2 & to Provide Rept Card for Both NRC & Util ML20195F9571998-11-13013 November 1998 Summary of 980625 Meeting with Bg&E in Rockville,Md Re Bg&E age-related Degradation & Insp Program for License Renewal. List of Meeting Attendees & Slides Used by Bg&E Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20196A1821998-11-13013 November 1998 Summary of 980624 Meeting with Util in Rockville,Md Re Integrated Plant Assessment Process for License Renewal.List of Attendees & Slides Encl ML20195F3961998-11-13013 November 1998 Summary of 981029 Meeting W/Nei,Bge & Duke Energy Re Status of License Renewal Activities.List of Attendees & Slides Presented by Bge for Status of Calvert Cliffs License Renewal Application Review Encl ML20195D4401998-11-13013 November 1998 Summary of 980813 Meeting W/Bg&E in Rockville,Md to Discuss Bg&E Fire Protection Evaluation,Section 5.10,contained within License Renewal Application.List of Attendees & Presentation Slides Encl ML20195H9311998-11-13013 November 1998 Summary of 980626 Meeting with Bg&E in Rockville,Md Re Bg&E Structures & System Walkdown Program for License Renewal. List of Meeting Attendees & Bg&E Presentation Slides Encl ML20151Z5801998-09-0707 September 1998 Summary of 980506 Meeting with Bg&E in Rockville,Md Re Util Proposed Responses to 980213 & 19 NRC Staff Requests for Addl Info on Bg&E License Renewal Feedwater Sys (5.9) & Dfos (5.7).List of Attendees & Util Proposed Responses,Encl ML20237C4651998-08-19019 August 1998 Summary of 980729 Meeting W/Bg&E & Contractor SG Team in Rockville,Md Re Plant,Units 1 & 2 SG Replacement Project. List of Attendees & Viewgraphs Distributed at Meeting Encl ML20236X6501998-07-28028 July 1998 Summary of 980709 Meeting W/Baltimore Gas & Electric Co in Solomons,Md Re Plant Environ Scoping Meetings to Support Review of License Renewal Application.List of Attendees & Presentation Matls Encl ML20249A9271998-06-16016 June 1998 Summary of 980604 Meeting W/Licensee in Rockville,Md to Discuss Replacement of Svc Water Heat Exchanges During Spring 1999 Refueling Outage on Unit 2.List of Attendees & Licensee Agenda Encl ML20247M4981998-05-15015 May 1998 Summary of 980319 Meeting W/Util Re Improved Tss.List of Attendees Encl ML20217K5921998-04-20020 April 1998 Summary of 980407 Meeting W/Util Re Control Room Habitability Issue W/Main Steam Line Break.List of Attendees,Util Presentation Matls & NRC Concept of CR Ventilation Sys Encl ML20216C8991998-04-10010 April 1998 Summary of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20203E0011998-02-12012 February 1998 Summary of 980126 Meeting W/Bg&E Re Plant,Units 1 & 2 Improved Ts.List of Attendees Encl ML20199B4121998-01-20020 January 1998 Summary of 980114 Meeting W/Bg&E in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,improved Tss.List of Attendees Encl ML20198H4011998-01-0505 January 1998 Summary of 971208 Meeting W/Bg&E in Rockville,Md Re Plant Pra.List of Attendees & Viewgraphs Encl ML20197K2121997-12-15015 December 1997 Summary of 971112,13 & 18 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Clarification of Calvert Cliffs Improved Tss.List of Meeting Attendees Encl ML20211L9371997-10-0202 October 1997 Summary of 970827 Meeting W/Bg&E in Rockville,Md Re Reactor Pressure Vessel 10-year Inservice Inspection Project.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217B1771997-09-10010 September 1997 Summary of 970904 Meeting W/Bg&E in Rockville,Md Re Clarification of Calvert Cliffs Ts,Sections 1.0,2.0,3.1,3.1 & 5.0.List of Meeting Attendees Encl ML20216J9411997-09-10010 September 1997 Summary of 970903 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,service Water Modifications.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217P0401997-08-21021 August 1997 Summary of 961204 Meeting W/Util in Rockville,Md Re Calvert Cliffs Improved Tss.List of Attendees Encl ML20217N9991997-08-21021 August 1997 Summary of 970731 Meeting W/Bge in Rockville,Md Re Severe Accident Mitigation Alternatives Methodology.List of Attendees & Presentation Matl Encl ML20198F1221997-08-0505 August 1997 Summary of 970730 Meeting W/Bge in Rockville,Md Re Plant Improved Ts.List of Attendees Encl ML20151J5531997-07-31031 July 1997 Summary of 970715 Meeting W/Bge in Rockville,Md Re Matters Related to Operability of SW Sys & SRW ML20148K7771997-06-16016 June 1997 Summary of 970605 Senior Mgt Meeting W/Util in Rockville,Md Re License Renewal Environ Rept (Er) Template Process.List of Participants & Handouts Encl ML20148H2211997-05-27027 May 1997 Summary of 970519 Meeting W/Bge in Rockville,Md to Discuss License Renewal Er Template Process.List of Attendees Encl ML20137W5311997-04-16016 April 1997 Summary of 970408 Meeting W/Util in Rockville,Md to Discuss Responses to Staff 960830 Rai.List of Attendees Encl ML20147G8651997-03-26026 March 1997 Summary of 970226 Meeting W/Bge in Rockville MD to Discuss Util Response to Staff 960830 Rai.List of Attendees & Matls Distributed at Meeting Encl ML20137E3501997-03-24024 March 1997 Summary of 970307 Meeting W/Bge in Rockville MD to Provide Comments on License Renewal Er Template Proposed by Util. List of Meeting Participants Encl ML20135E1721997-03-0404 March 1997 Summary of 970109 Meeting W/Bge in Rockville,Md to Discuss Results of 90 Day Review Effort Assigned at Last Mgt Meeting on 960911 & Future Review Activities.Attendee List & Meeting Handouts Encl ML20138K9151997-02-13013 February 1997 Summary of 970205 Meeting W/Bge in Rockville,Md Re License Renewal Er Template Process Proposed by Bge.List of Meeting Participants Encl ML20134J9311997-02-10010 February 1997 Summary of 970210 Meeting W/Bg&E in Rockville,Md Re Improved Tss.List of Meeting Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20133J5141997-01-16016 January 1997 Summary of 961016 Meeting W/Bg&E in Rockville,Md to Discuss License Renewal Program.List of Attendees & Handouts Encl 1999-09-08
[Table view] |
Text
+
, s
December 13, 1985
- Docket,Nos. 50-317 and 50-318 MEMORANDUM FOR:' Ashok C..Tha'dani, Director PWR Project Directorate #8 Division of PWR Licensing-B o-FROM: D. H. Jaffe, . Project Manager PWR Project Directorate #8
. Division of PWR Licensing-B-
SUBJECT:
SUMMARY
OF MEETING WITH BALTIM0RE GAS & ELECTRIC COMPANY (BG8E) CONCERNING OPERABILITY OF STEAM LINE SAFETY VALVES On November 26, 1985, representatives of BG&E and .the NRC staff met in _ Room 12242-of the' Air Rights Building in Bethesda, Maryland. Enclosure 1 contains the list of attendees. The purpose of the meeting was to discuss the operability of the Calvert Cliffs Unit 2 Main Steam Safety Valves (MSSVs).
.The'NRC' staff l indicated concern _regarding the as-found setpoints for the Unit 2 LMSSVs.- The setpoints violated existing Technical Specification (TS) requirements and would have _ violated the new, more liberal (TS) requirements
'to.be issued as part of a Unit 2, Cycle 7, license amendment.
BG&E responded to staff concerns regarding the Unit 2 MSSVs in a presentation summarized in Enclosure 2 Although several miror MSSV problems seemed to exist, no single or cumulative cause for the setpoint problem could be identified.' Evidence presented by BG&E seemed to point to a problem associated with setpoint measurement techniques. In light _of this finding,
. BG8E committed to the following corrective actions related to MSSV setpoint verification:
- Procedural Enhancements Set. valves at 530*F vice 500*F Provide QC coverage while verifying setpoints
-* Independently reverify setpoints of 4 valves 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after initial setting.
Lf * .
Verify setpoints of 4 valves.during first outage after 4 month operation.
BG8E:also presented its conclusions regarding the Unit 1 MSSV setpoints.
This material is contained-in Enclosure 3.
8512230002 DR 851213 ADOCK 05000317 4 PDR -
-I V
=
a-_
s Following the BG8E presentation and discussions among the NRC staff, it was concluded by the NRC staff that based upon information presented by BG8E:
(1). safety analyses performed by BG&E, assuming as-found MSSV setpoints, showed no violation of safety limits or the criteria of 10 CFR 50.46,
~ (2) improvements proposed by BG&E would likely. improve MSSV setpoint measurement, and (3) the Unit 1 MSSVs appeared to be showing as-expected MSSV setpoint behavior. Based upon the above, it was concluded that no safety problems associated with MSSVs could be identified which would prevent- the return of Unit 2 to power operation.
, s, <
g _
. H. ffeV oject Manager PWR Project Directorate #8 Division of PWR Licensing-B
Enclosures:
As stated cc w/ enclosures:
See next page
/
i t
j TP8D#8.
f DJaffe;ef
. \1//ly85 l
A Mr. A. E. Lundvall,' Jr.
- Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant cc:
Mr. William T. Bowen, President Regional Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768 for Operations 631 Park Avenue D. A. Brune, Esq. King of Prussia, Pennysivania 19406 General Counsel Baltimore Gas and Electric Company Mr. Charles B. Brinkman P. O. Box 1475 Manager - Washington Nuclear Operations Baltimore, Maryland 21203 Combustion Engineering, Inc.
7910 Woodmont Avenue George F. Trowbridge, Csq. Bethesda, Maryland 20814 Shaw, Pittman, Potts and Trowbridge 1800 M Street, NW Mr. J. A. Tiernan, Manager Washington, DC 20036 Nuclear Power Department Calvert Cliffs Nuclear Power Plant Mr. R. C. L. Olson, Principal Engineer Maryland Routes 2 and 4 Nuclear Licensing Analysis Unit Lusby, Maryland 20657 Baltimore Gas and Electric Company Room 720 - G&E Building Mr. R. E. Denton, General Supervisor P. O. Box 1475 Training and Technical Services Baltimore, Maryland 21203 Calvert Cliffs Nuclear Power Plant Maryland Routes 2 and 4 Lusby, Maryland 20657 Resident Inspector c/o U.S. Nuclear Regulatory Commission Combustion Engineering, Inc.
P. O. Box 437 ATTN: Mr. R. R. Mills, Manager
. Lusby, Maryland 20657 Engineering Services P. O. Box 500 Mr. Leon B. Russell Windsor, Connecticut 06095 Plant Superintendent Calvert Cliffs Nuclear Power Plant Department of Natural Resources Maryland Routes 2 and 4 Energy Administration, Power Plant Lusby, Maryland 20657 Siting Program ATTN: Mr. T. Magette Bechtel Power Corporation Tawes State Office Building ATTN: Mr. D. E. Stewart Annapolis, Maryland 21204 Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 Mr. R. M. Douglass, Manager
. Quality Assurance Department Baltimore Gas and Electric Company Fort Smallwood Road Complex P. O. Box 1475 -
. Baltimore, Maryland 21203 ,,
l
, , . . , ---,-e- ,. -, --,,,.,-----n_- , , , . , - , , , - - - ,,, , - , , - w -.,,,,,_.,-e y -n---,---nv.- - --
.h
. Enclosure 1 List of Attendees NRC D. Jaffe T. Foley F. C. Cherny A. Thadani M. Caruso G. Hamer M. S. Weg'.er R. Perfetti BG&E L. B. Russel J. F. Williams J. A. Mihalcik J. T. Carroll R. R. Allen
( 'M N
1 l
. i
- Enngiu 2 l AGENDA U-2
. Describe Safety Valves
. Describe As-Found Results
. Results of Safety Analysis
. Outline Test Program I
. Test Program Results
. Conclusions
. Future Actions h
u2 agenda e
e Ge P
4 1
i~ --v.. --.,,+ , , _ . .-,w--v-.. - - . , , - , , - , - - , - ~ + - - -- -
- y. -. ~.- - v- ,--y ,.,-,...., -w,-,,--.- - - - - , - , _ - - - - - - - . . , . . . - - , c. _ - ,-
s .
/
P- '
8 t-6 7 0 0 0 0 4 4 2
2
- 4 5 x' 0 0 R 0 - 0 4 4, O
T -
A R
E V
N /
E '
S G 2 3 M
0 0 - 0 0
s' M 4 4 .
/
A -
E -
i T '
S s ,
0 1 0 0 0 0
, ,' Y 4 ,
5 ,: ~- .
o 1
2
- 8 9 9 9 s R 9 9 -
i O
T A
O3 3 s'- R E
)-
N g N 6 7
. i G 9 - 9 3 3 _
' M A
- % E r T
, S 4 5 9 t 9
9 - 9 3 3 t 2 3 9 9 9 9 3 3
o REF QTY NOMENCLATUR!
NO
_r.
I BASE ASSEMBLY 15 N lA 1 8ASE 16 '
37
- IB I N0ZZLE
-I IIA i --
IC 10 BASE STUD b !. - 39 ID gg ' f 10 BASE STUD NUI U
7g 2 1 YOKE
~
E d .l[p 3 2 YOKE ROD I
q ') 3A 1. COVER PLATE
-78
[;:
4 4 YOKE ROD NU1 (NOT SHOWN-.
7C 5 1 DISC e
6 SPRING ASSEMBLY
/ 3, 6A 1 TOP SPRING WASHLH
/ ( 60 1 BOTTOM SP-RING WASHLR 8
'f GC 7
1 1
SPRING COMPRESSION SCREW 18 f 7A 78 I COMPRESSION SCREW L0ct r:U!
, 1 COMPRESSION SCREW Al:AN+
BC '
7C 1 THRUST BEARING ,
i 8 i SPINDLE 9 i UPPER ADJ. RING
~
3A 68 10 i LOWER ADJ. RING y E'/1-F41 11 1 UPPER RING PIN
-IC Q llA 1 LOWER RING PIN 93 n f" eppgj
- 10 h4 12 1 DISC HOLDER 5
4 p- 13 1 DISC COLLAR 13A I DISC COLLAR COTTER PIN j n-f ;; 134 9 - 14 1 GUIDE 11 ; jd _ _ __ 15 1 CAP llA '
9 >- 15A 1 CAP SET SCREW 10 16 1 RELEASE NUT g,
, l. 4 , 16A 1 RELEASE NUT COTTER PIN I 17 i T P LEVER
/,'
J 0;; 1 17A 1 TOP LEVER PIN O; _E2 18 1 DROP LEVER
I -
18A 1 DROP LEVER PIN
.. 19 2 LEVER COTTER PIN
- s. 8 _II '
fD Cd
N. ,
SPRING FORCE 1
-f A y
1 -
./
O \ \N
\l l s '
&x N
7, 4h N r
\' A xxN .
7-3 PP -
/ , / /
' _ ) ,
( F $ $
' CumIER L -- --- -
N 3[ ~~
5 ,
3
~~
4\ (' H '
,/ '
- N[- g :
Eg
/\
N -E
/t
% y V :5 : ;)C%f
/ ./
( t 7b
/ $3,y NJ (N ;; )s >
~
p C 3,
8
{
p-f r 5 *
/ -
s ,
,)
~ -- -- G
< 3 ,
u.=m '
v , N /f/>/
.O f -
N
~=- x;n .
t =-5 LLQ w$
' / '
/ / R t N/ / /*
'/x / x / / 3,- '
,r C
..f L CHAMBER K '
Volve closed
_c E
.?,
~^
..._...-_,-..-_.._,_-....-,___.4.--~~ 7 , '~~ ~ E . . - _ _, . _ . --
SPRING FORCE A y I
q r l-l
\r s \
\\ ] / I I / TP \\\
/l/
$ l @
C'HAMBER L -
H
.- y ,
_ _ _ __ -tx N @ /N
' E 2
./ Ml h N
^'
5 7 \' i -N
/,
K -[
(\ N
,/ t
,s! ,7;f /
7 ;
m g-
/ g /- N: %
4 . ;)
s r
/
r --
p/ a
(
e __ g W-W % /1 \ Y//
4
/\ N/
D e 3 _, I rs N I \ '
' /; /, W///]
! CHAMBER K
[
- Yalve Jn fulllift i
SPRING FORCE : .
- A y
'3 6 n
'N'41 I r$M I -
(
\\ __
7" C
/ ~x kwV l 29 Ly l n\ \ \
1
// hNxx s2d -
l e l CHAMBER L
,. N' , f7 ; N H
' N3- -. --
Ch _- --- E 2 b j\
/ \p 3 N ,
w em Au f' 'I \ l 8
\ d B
/,
j p -b /2:9-
-/-/
= :&lk$(, .)h W _
O
- ;c S s s H =F v(a gN s
is s 3/j x.
e
/ l/ ~ N/l/ / l
' 5 1, ~ -
[CuanoERx 9e Valve closing i
MSSV UNIT 2 LIFT SETPOINT TEST (AS FOUND/AS LEFT PSIG)
. As Found With Setpoint Hydroset Valve (t 1% PSIG) Oct.1982 Apr.1984 Oct.1985 Correction
'3992 985 1009/982 991/991 987 3993 985 963/975 1015/985 1011 3994 995 1022/996 1001/1001 997 i 3995 995 962/989 1035/1004 1031 3996 1015 1021/1021 1037/1006 1024/1024 1020 3997 1015 1015/1015 1044/1008 1020/1020 1016 3998 1035 929/1035+10 1065/1038 1044/1044 1040 3999 1035 1032/1032- 1053/1038 1057/1038 1053 4000 985 974/981 1037/993 1033 4001 985 987/987 972/985 1040/992 1036 4002 995 998/998 1004/1004 1059/993 1055 4003 995 996/996 1014/990 1047/997 1043 4004 1015 1018/1018 1070/1018 1065 4005 1015 1012/1012 1054/1018 1050 4006 1035 991/1036 1104/1035 1100 4007 1035 980/1034 1106/1039 1102 Test Results: 1 Low 6 Low 0 Low 0 Low 0 High 7 High 11 High 11 High 6 Sat 3 Sat 5 Sat SSat
~
- mssvu2
.e
ACCIDENTS PREDICTING MSSV OPERATION
. Loss of Load
. Loss of Load to One Steam Generator
. CEA Withdrawal
. Feed Line Break
. Imms of NoeEmergency AC Power
. Loss of Feedwater
. Small Break LOCA 4
ens et
r_ ._ _
_______o...___
., _ m ._
. _ MAIN STEAM SAFETY VALVE SAFETY ANALYSIS Nominal - - As-FoEnd As-Found UIC8*
Setpoint Setpoint Analysis Analysis F31G PSIG PSIG PSIG I RV-3993/4000 985 991/1037 1037/1037 1035**
RV-3993/4001 985 1015/1040 1040/1040 1035**
P RV-3994/4003 995 1001/1059 1059/1959 1035
. I RV-3995/4003 995 1035/1047 1047/10'47 1035 RY-3996/4004 1015 1024/1070 ,
1070/1070 1085 RY-3997/4005 1015 1020/1054 1054/l054 __ 1065
- i RV-3998/4006 1035 1044/1104 1104/1104+ 1065
. . 4 4
RV-3999/4007 1035 1057/1106 1106/1106+ 1065
- This configuration has been shown to be applicable for USCE.
" Small Break LOCA assumes 995 PSIG.
+ RV-4004 and RV-4007 were assumed stuck closed for Loss of Load analysis.
RV-3998 and RV-3999 opened at 991 and 1001 PSIG, respectively.
Sp l
l
,_ __ - . _ _ _ . . . . . - 1
9 e ,
i l
RESULTS SMALL BREAK LOCA
. Available High Promstre Safety hijection flow is ligher than assumed in analysis.
. Higher flow compensates for higher MSSV setpoints.
h e
sp 6e i
i
1 i
.e- -
1 l
O l
l WON-LOCA SAFETY ANALYSE LINYrING EVEN15 i
i
. Imms of Load
. Loss of Load to one steam generator ;
)
LIMFFING PARAMETER ;
l
. Pd : ^
_, system pressure: Limit less than 1100 PIRA.
1
~
1 I
"* ! l l
I l
l i
l l
- I l
i
, - . _ . - - - . . ~ , _ _ . _ , _ . . _ . . . . _ , . , _ _ , _ _ _ , _ _ , . , . . . , _ . , _ , - ,_.._[___._,_._ . . _ , _ _ . . . - ,__. -
e RESULTS NON-LOCA SAFETY ANALYSB i
LOSS OF LOAD TO ONE STEAM GENERATOR
. As-fomd setpoints used
. Otherwise identical to UICS analysis
. Peak sooondary system pressire = 1980 psia LOS8 OF LOAD
. Ae-foted setpoints used
]
. BrFC = 0.0E-4 delta rho /F vs. +0.7E-4 delta rho /F (U1CS) I 1
l
. Otherwise identical to UICS analysis
. Peak secondary system pressure = 1993 psia 1
1 l
l P
se
<n-+-, -.,--.--w- - , - , , .e,- ,er ,, e, sm------=wv--r-m- w,-e ,e --n~- -m---,,--*- -----w- - -- -w-~'w
i MSSV TESTING PROGRAM 2-RV-3993
- 1. At 700F ambient,500 0F steam
- a. Thermal equilibrium
- b. Test set pressure
.c. Full Flow Test
- d. Check leakage
- e. Retest set pressure.
- 2. At 700F ambient,5300F steam, repeat la - e.
- 3. Heat up transient at 120 F ambient,530 F steam prior to thermal equilibrium, repeat Ib - d.
- 4. Heat up to thermal equilibrium at 120 F ambient,530 F steam, repeat Ib - e.
- 5. Set with new hydroset, check with old hydroset at 985,995,1015, and 1035 psig.
- 6. Reset to 985 psig at 1200 F ambient and 530 F steam, repeat Ib - e and check with 2 full flow tests.
2-RV-3992
- 1. At 120 F ambient,530 F steam
- a. Thermal equilibrium
- b. Test set pressure
- c. Full Flow Test
- d. Checkleakage
- e. Retest set pressure
. NOTE: For all tests, record value of temperature vs. time for inlet nozzle, body, spring, and outlet flange.
2RV Oe O
~
Wyle Test Valve BM-7771 11/12 - 14/85 1.. Valve Set at 985 + 10 Ambient - Avg. 86.30F System - Avg. 495.50F Hydroset - Avg. 975.6 psi set pressure Full Flow - Avg. 986.3 psi pop pressure 2.. Ambient - Avg. 74.60F System - Avg. 537.7 F Hydroset - Avg. 966.3 psi set pressure Full Flow - Avg. 979 psi pop pressure
- 3. Ambient - Avg. Il9.80F 1 hr. heat up System - Avg. 526.2 F Hydroset - Avg. 973.8 psi Full Flow - Avg. 979 psi
- 4. Ambient - Avg. Il8.30F 4 hr. heat up System - Avg.527 F Hydroset - Avg. 965.8 psi set pressure Full Flow - Avg. 976 psi pop pressure
- 5. Valve set at 1035 1 10
. Ambient - Avg.119.5 F System - Avg. 327.5 F Hydroset - Avg.1035.6 psi set pressure Full Flow - Avg.1030.5 pop pressure
- 6. Valve Reset at 985 1 10 Ambient - Avg.119 F System - Avg. 523.5 F Hydroset - Avg. 967.5 psi set pressure Full Flow - Avg. 981.3 psi pop pressure
- 7. Wyle Test Valve BM 7787 - 11/14/85 Ambient - Avg.122.7 F System - Avg. 3230F ,
~
Hydroset - Avg. 966.3 psi set pressure ..
Full Flow - Avg. 984.5 psi pop pressure wyle
o .
1985 Ring Setting Stem Avg.' Disk Maximum As Found Vrive Top Bottom Surface Run Out to Guide Set Pressure 2-RV Set Pressure (Note 2) Film /Cond. (Note 1) Clearance ** (PSIG) (PSIG) 3992 -7t -2 very light / good OK 19t 995 987-3993 +22t +12 very light / good OK 17t 935 1011 3994 Il3t -15 very light / good 8t 18t 1005 997 3995 6t -2 very light /some wear OK 15t 1005 1031 -
t 3996 .-11t -3 very light / good 15t 15t 1025 1020 3997 12t -2 very light / good 8t 13t 1025 1016 3998 13t -
heavy / good 10t 14t 1045 1040 3999 -7t -1 heavy / good 24t 13t 1045 1053 4000 4t -9 very li 21t 14t 995 1033 ii001 12t -1 heavygood /ght/ good 14t 14t 995 1036 2002 95t -3 very light / good 10t 14t !C05 1055 4003 12t -7 heavy / good 13t 13t 1005 1043 4004 25t -3 very light / good 29t lit 1025 1065 4005 52t -3 very light / good 20t 15t 1025 1050 4006 27t -1 very light / good 13t 13t 1045 1100 4007 22t -1 very light / good 18t 12t 1045 1102 s
t = 10-3 inches
- Min. old disk to guide clearance 10t
- Min. new disk.to guide clearance 15t
- 1. No effect below 0.%25"
- 2. As-Found ring positions affect setpoint by less than 1% and yield 15% or less blowdown.
i 4
.e_
L
~a , ;
.J .
U-2 CONCLUSIONS t
Apparent setpoint changes not explained by
- as-found condition of valves.
i Apparent setpoint changes may possibly be the result of measurement technique.
Rebuilt valves will perform as designed.
On 0
49
. . . - =. . . ._
o e_e U-2 FUTURE ACTIONS Procedural Enhancements Set valves at 5300 F vice 500 F Provide QC coverage while verifying setpoints Independently reverify setpoints of 4 valves 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> af ter initial setting.
~
Verify setpoints of 4 valves during
. first outage after 4 month operation.
e D
eo I
-A ENCIIEURE 3 AGENDA U-1
. Past Test Results
. Estimated Current Condition of Valves
. Conclusions .
. . Future Actions me D
9 sp 99
~
4 MSSV UNIT 1 LIFT SETPOINT TEST (AS FOUND/AS LEFT PSIG)
As Left Setpoint Hydroset Test Hydroset Test Hydroset Test Valve - (11% PSIG) Oct. I1,1983 April,1985 June,1985 3
3992 985 959/975 933 3993 985 975/988 3994 995 995/995 3995 995 987/987 990 3996 1015 989/1024 1024/1024 3997 1015 1014/1014 3998 1035 1023/1028 3999 1035 1010/1034 4000 ' , 985 990/9'90 980/980 978 4001 985 981/981 964/983 983 4002 995 961/996 990 4003 995 987/987 999 4004 1015 1024/1024 1016 4005:- 1015 -
986/1010 1012 4006 1035 1058/1040 1030 4007 1035 1043/1043 Test Results: 1 Low 6 Low 1 High 0 High 3 Sat 8 Sat mssvul G
em e,
e
--w --_#.m, - ---.--,,----y - . - ,
~
U-1 CONCLUSIONS Valves will open, provide full capaciti, and reset as designed.
No safety implications est GP G
l l
)
o 9.
I 1
~
r, U-l
- FUTURE ACTIONS Verify setpoints of all 16 valves during next outage.
Reset any valves outside1 1%
If necessary to reset any valve, verify setpoint of valves during first outage after 3 months operation.
G em Se e
c,[L o
MEETING
SUMMARY
DISTRIBUTION
./h Licensee: Baltimore Gas & Electric Company
- Cepies also sent to those people on service (cc) list for subject plant (s).
x Docket File NRC PDR L PDR PBD-8 Rdg JPartlow (Emergency Preparedness only)