ML20138M297

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Rev 27 to USEC-02, Application for Us NRC Certification for Portsmouth Gaseous Diffusion Plant, Changes to FNMCP & Transportation Security Plan. Encl Withheld,Per 10CFR2.790(b)(4)
ML20138M297
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 12/16/1998
From: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
To: Paperiello C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20138M300 List:
References
GDP-98-0276, GDP-98-276, NUDOCS 9812280206
Download: ML20138M297 (5)


Text

.

USEC A ow.iEawer ome.ar c

JAMES H. MILLER Dmt (301) 664 3309 VICE PRESIDENT, PRoouctioN fax: (301)571-8279 December 16,1998 I-GDP 98-0276 Dr. Carl J. Paperiello Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gaseous Diffusion Plant (PORTS)

Docket No. 70-7002 j

Transmittal of Revision 27 to Portsmouth Certification Application - Fundamental Nuclear Materials Contral Plan & Transportation Security Plan INFORMATION TRANSMITTED llEREWITH IS PROTECTED FROM PUBLIC DISCLOSURE AS CONFIDENTIAL COMMERCIAL OR FINANCIAL INFORMATION AND/OR TRADE SECRETS PURSUANT TO 10 CFR 2.790 AND 9,17(a)(4)

By separate letter of the same date (Letter GDP 98-0275), the United States Enrichment Corporation (USEC) is submitting to the Nuclear Regulatory Commission (NRC) Revision 27 to USEC 02, Application for United States Nuclear Regulatory Commission Certification, Portsmouth Gaseous Diffusion Plant. As described in letter GDP 98 0275, certain portions of Revision 27 contain confidential commercial or financial information or trade secrets that are exempt from public disclosure pursuant to Section 1314 of the Atomic Energy Act of 1954, as amended, and 10 CFR 2.790 and 9.17(a)(4).

In accordance with 10 CFR 76.33(e), proprietary versions of the Revision 27 changes to the Fundamental Nuclear Materials Control Plan (FNMCP) and Transportation Security Plan are being submitted with this letter. USEC specifically requests that the Revision 27 changes to the FNMCP and Transportation Security Plan be withheld from public disclosure. The enclosed USEC affidavit

\\\\

provides the information required by 10 CFR 2.790(b)(4).

5 The information contained in USEC letter GDP 98-0275 dated December 16,1998 (including the accompanying oath and affirmation) is hereby incorporated by reference into this letter, y

C PDR i

6903'Rockledge Drive. Bethesda, MD 20817-1818 Telephone 301564 3200 Fat 301564-3201 http://wwusec.com Ofraes in Livermore. CA Paducah KY Portsmouth. OH Washington. DC 6, }#h "i ts L

L.PR Lf Q' t>

t

\\ u) i

  • F

~

Dr. Carl J. Paperiello i

December 16,1998 GDP 98 0276, Page 2 Should you have any questions or comments on Revision 27, please contact Steve Routh at (301) 564 3251. There are no new commitments contained in this submittal.

Sincerely, 4

es H. Miller ice President, Production

Enclosures:

1.

Amdavit 2.

USEC-02, Application for United States Nuclear Regulatory Commission Certification, Portsmouth Gaseous DitTusion Plant, Revision 27 Changes to the Fundamental Nuclear Materials Control Plan and Transportation Security Plan, 20 copies cc:

NRC Region 111 Omce, w/2 copies NRC Resident Inspector - PGDP, w/l copy NRC Resident inspector - PORTS, w/o Mr. Joe W. Parks (DOE), w/4 copies