Forwards Revs to FSAR Section 13.1.Table 13.1-1, Nuclear Dept Staffing Summary, Will Be Reinstated to Reflect Approved Staffing Levels at Fuel Load.Table 13.1-3 & Figure 13.1-8 Will Indicate Personnel Qualified to ANSI/ANS-3.1
ML20138M249
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/18/1985
From: Corbin McNeil
Public Service Enterprise Group
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8512200312
Download: ML20138M249 (8)


Text

.a Public Service Oectric and Gas Company C:rbin A. McNeill, Jr.

Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609339-4800 Vice President -

Nuclear December 18, 1985 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:

Ms. Elinor Adensam, Director Project Directorate 3 Division of BWR Licensing

Dear Ms. Adensam:

FSAR SECTION 13.1 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 As a result of phone discussions between members of the

. Nuclear Regulatory Commission (NRC) Staff and Public Service Electric and Gas Company (PSE&G) on December 10 and 12, 1985, attached are revisions to Section 13.1 of the Hope Creek Generating Station (HCGS) Final Safety Analysis Report (FSAR).

Amendment 13 of the FSAR revised Section 13.1 to reflect the reorganization of the HCGS Nuclear Department; however, Tables 13.1-1 and 13.1-3 need further clarifications in order to completely address Safety Evaluation Report (SER) Open Item #13.

Table 13.1-1, the Nuclear Department's Staffing Summary, was inadvertently deleted in Amendment 13 but will lx3 reinstated as revised to reflect approved staffing levels at fuel load.

In addition, Table 13.1-3, and Figure 13.1-8, are being revised to correctly indicate that the General Manager, Assistant General Manager, Technical Manager, Operations Manager and Maintenance Manager are qualified to ANSI /ANS-3.1 These changes will be incorporated in FSAR Amendment 14.

i 8512200312 851218 PDR ADOCK 05000354 A

PDR L

Director of Nuclear 2

12-18-85 Reactor Regulation Should you have any questions on the subject filing, do not hesitate to contact us.

Sincerely, Attachments C

D. II. Wagner USNRC Licensing Project Manager R.W.

Borchardt USNRC Senior Resident Inspector

HCGS FSAR 11/85 l

TABLE 13.1-1 JL:T :

l REPLACED WITH ATTACHED TABLE A..end.T.ent 13 T

HCGS FSAR TABLE 13.1-1 Page 1 of 2 NUCLEAR DEPARTMENT

SUMMARY

STAFFING REPORT APPROVED STAFFING LEVEL DEPARTMENT TITLE AT FUEL LOAD Salem Operations 495 Hope Creek Operations (l) 433 Operations 87 Maintenance 158 Power Ascension

  • 42 Technical 40 Radiation Protection / Chemistry 85 Planning 6

Nuclear Operations Support (2) 550 Engineering and Plant Betterment 350 Licensing and Reliabililty 56 Methods and Systems 103 External Affairs 24 Procurement 17

-Nuclear Services (3) 329 Site Protection 56 Nuclear Training 115 Radiation Protection Services 27 Site Services 129 Nuclear Quality Assurance (4) 114 Hope Creek Quality Assurance.

21 Engineering and Procurement 36 Programs and Audits 27 Nuclear Safety Review (5) 21

. Personnel and Administration 42 TOTAL (6)(7) 1986

m e

HCGS FSAR TABLE 13.1-1 Page 2 of 2 (1) Total includes the General Manager and Assistant General Manager - Hope Creek Operations and their staffs (2) Total includes the Assistant Vice President - Nuclear Operations Support and his staff

'(3) Total includes the General Manager - Nuclear Services and his staff (4) Total includes the General Manager - Nuclear Quality Assurance, his staff, and the Salem QA Department (5) Total includes the Salem Onsite Safety Review Engineer and his staff (6) Total includes the Vice President - Nuclear and his staff (7)The Department of Public Information is not included in the total since the group operates outside of the Nuclear Department; however, it is shown on Figure 13.1-6 since it is available for support

  • The Power Ascension Department will dissolve at commercial operation and hence is not considered part of the permanent Nuclear Department organization.

L

9 H;GS iSAR 11,'85 i

TABLE 13.1-3 Page 1 of 3 HO?E CREEK CPERATIONS MANNING CRITERIA Hope Creek Operations Staff Position ANSI /ANS-3.1 Ecuivalent General Manager Plant Managec

,D

[

Assistant General Manager Plant Manager ++ 74 l

Technical Manager Technical Manager +**y l

Operaticns Manager Operation Manager l

Maintenance Manager Maintenance Managec j' l

Radiation Protection / Chemistry Radiation Protection Manager (*)

ll Manager or Chemistry /Radiocheristry Technical Engineer Technical Manager ++1f l

I&C Engineer Instrumentation & Control l

Chemistry Engineer Chemistry / Radiochemistry

[

Operating Engineer OperationManager+++f l

Maintenance Engineer Maintenance Manager l

Office Administrator Supervisor not requiring license l

Senior Operating Supervisor Shift Supervisor

~

l Nuclear Shift Technical Advisor Shift Technical Advisor l

Senior Nuclear Shift Supervisor Shift Supervisor l

Nuclear Shift Supervisor Senior operator l

Nuclear Shift Technical Advisor /

Senior operator (2) l SRO Nuclear Control Operator NenLicensed operator l

Equipment Operator Nonlicensed operator l

Arendment 13 l

HCGS FSAR 11/85 l

TABLE 13.1-3 (cont)

Page 3 of 3 Hope Creek Operations Staff Position ANSI /ANS-3.1 Equivalent Chemistry assistant None l

Radiation Protection Engineer Radiation Protection Manager (3)(*)

l Senior Technical Supervisor Supervisor not requiring license l

Senior Reliability and Supervisor not requiring license l

Performance Supervisor l

Systems Engineer Supervisor not requiring license l

c

(*pf The criteri: crc caticfica whcn one of thc following plant' ct:ff mcct th pccition qualifications.

Gencral ";n;gcr er.'.;;istant Ocaccal "anagcr o_.

,jf.h%

Technic:1 " n gcc or Tcchnical Enginccr Opcrations "anagci wm Opsmating Engineuu

4m i n L e no ns c Menovec vc Mo u Lenoise Envineet.

~

(2)

Nuclear Shift Technical Advisor /SRO is a degreed senior operator who is STA-trained and NRC-licensed as an SRO.

(3)

RPM shall also meet Regulatory Guide 1.8 criteria.

(*)

The criteria of Regulatory Guide 1.8 are satisfied when one of the following plant staff meets the position qualification:

Radiation Protection / Chemistry Manager or the Radiation Protection Engineer

,a l

'l b!

Amendment 13 l

m;- ;x m ;--

.-~,---m-1 r- -,- - -,,

=

._,-....3-

v G E'.E R A L P/ A'j A G E R gp

'g HOPE CR:tk, q

CPE R ATIONS J

C u,.,,.,. t i e =- -=

+

4-A SS!ST ANT IECHNCAL GENERAL f/ a '. A G E R

.. ;, A C3 E R RADATION 4

ROTEC' O.

v' E '; ET R Y 4

CPE R ATING

    • ANAGER STATION PLANNING f.

f.* AN AG E R M AINTEN ANCE M AN AGER POWER ASCE NL'CN MANAGER