ML20138L546
| ML20138L546 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/24/1985 |
| From: | Bauser D GENERAL PUBLIC UTILITIES CORP., SHAW, PITTMAN, POTTS & TROWBRIDGE |
| To: | Edles G, Johnson W, Kohl C NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
| References | |
| CON-#485-965 SP, NUDOCS 8510310337 | |
| Download: ML20138L546 (5) | |
Text
Qr w
/
h(
emtoumnum %
SHAW, PITTMAN, PoTTs & TROWBRIDGE A pamTNERSMep INCLUDING PROFESSIONAL CompORAf TONS 1800' sTogg,
w.
WA$ 1NGTOPd. D. c. 20 6 W a81Av O POTTS. P C.
- ANDAL e nELL. p c, MENNETH J. M AUTM AN SYLVI A M LOTRECW hootrT$O N'm C Y
CE Cu L.,fLEIN em
.' P C.
NO E
^ Y A NN'E L A DE STEpe.eEN o POTTS P C
- 0st mT a. nose #NS.
M RU EN IN; y (20218221099 & 822 M g"
'g*[ j,"g^g"g g O eeN ta:en.am'M e.. c
".tm a EwS q*
Q w
. =AN = No 8An.w(,,
yg A.N EPSNrE [C
- f A e O
- {an,,a g L n R
NDEN P C-f ANE CMffoOEN p.E FW A
C.
31M'"1ig*'L'9" "'
.A
@'"> '".'o7"As%
u
~, A-ga,pg,aga,, MAN
- ^
- r,;,Ct=L E?o,.TO,,,,,
AhM
$b CM N
JuC8TM A SANDLER
[{Y, [ERMAN JAY. S (stso
. C MO rj TELEN
-c SARGARAme ROSSOTTf. P C wiLLeAM se sano g
ANDREW D. E LL8S a
g s
E Syg SpmAGUE LA"En'E!'#*2',E"d' c.... C.
35^':,": 8'hto**
\\- 69 6 03. {O""*'^w WSH.)
0" A S E s
ut et, J R (h**ETH DggE,,me,ACM D DmAS 4
LE S M. MON AP op c^ait's-A-'**~ ^
- lli". io'JE"0"^
",/,c;;;;m^S "As"5:;*,.
"^""STT'A"1.'iM c.
"3M".1 "^o"J ;ON N
v'"S'*'^ of"r*G
"'";# "2 J.*
98".?T'"f4 T" C A',c"*""*"
i?"O " "PE"!., "E?,**"*
E"u.'I?" la".9"E.*d'c "8". ".'Jo'
?JME".M AN
~
^
C ATM CM M C EV TT A AN E p.g E RG he 3
.END NA M Tg AS J C LIOTA w;::micT"tterC' s:"ct w. = c -
JO;,S;',", "
e:mi:S.m nt=S"ef,oM Y.e = t e c: pd"E?,"'E' C6c,"! "' "
c aa:a r~::::+:::T.J...
m e ; : er,N.J-
- =" '.=s:n" ifC?A"wJ ^"o" JO
- r. of AL,.
A-E L A - *NoE S"A
"?!!A*"3 htt'MM c
mes:: =mtse tiessea =
m="? an='c'"- v. sum m iN.
.C A o S. EAT 1T J1".lE"S".."s1 M"L7~.*,"C."
=='w
^
VEE ="w"L%o'E ""
- . moo"a.1 S YW'W?
A CouMSEL r Acesit'ao.se o c
- AOnes??to ses vs.Gessia
....E m S o..EC, o, AL NuM.E.
October 24, 1985 (202) 822-1215 Gary J. Edles,-Esquire Dr. W. Reed Johnson Christine N. Kohl, Esquire Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 In the Matter of Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1)
Docket No. 50-289 SP (Restart Remand on Management - Trsining)
Dear Chairman Edles and Administrative Judges Johnson and Kohl:
Enclosed is an October 3, 1985 letter from H. D.
- Hukill, Vice President and Director of TMI-1, to John F.
Stolz, Chief, Operating Reactors Branch No.
4, NRC's Office of Nuclear Reac-tor Regulation, reporting on the current schedule for delivery of the Singer Link replica simulator for TMI-1.
This letter updates my July 31, 1985 notification to the Appeal Board and the parties on the status of the replica simulator.
As indi-cated in the enclosed letter, initial training on the simulator is now projected to begin in August, 1986.
Sincerely, OM h. [dcwMr. -
Deborah B.
Bauser Counsel for Licensee cc:
Servtce List h
D DR i
G s
Ik J
l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD i
In the Matter of
)
)
METROPOLITAN EDISON COMPANY
)
Docket No. 50-289
)
(Restart Remand (Three Mile Island Nuclear
)
on Management)
Station, Unit No. 1)
)
SERVICE LIST Nunzio J. Palladino, Chairman Administrative Judge U.S. Nuclear Regulatory Commission Gustave A. Linenberger, Jr.
Washington, D.C.
20555 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Thomas M. Roberts, Commissioner Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Washington, D.C.
10555 Administrative Judge Gary J. Edles James K. Asselstine, Commissioner Chairman, Atomic Safety and U.S. Nuclear Regulatory Commission Licensing Appeal Board Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Frederick Bernthal, Commissioner U.S. Nuclear Regulatory Commission Administrative Judge Washington, D.C.'
20555 Dr. W.
Reed Johnson Atomic Safety and Licensing Lando W.
Zech, Jr., Commissioner Appeal Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 Administrative Judge Administrative Judge Ivan W. Smith Christine N. Kohl Chairman, Atomic Safety and Atomic Safety and Licensing
. Licensing Board Appeal Board U.S.' Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 Administrative Judge Docketing and Service Section (3)
Sheldon J. Wolfe Office of the Secretary y
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 I
l t
e SERVICE LIST PAGE 2 Atomic Safety and Licensing Mr. Henry D. Hukill Board Panel Vice President U.S. Nuclear Regulatory Commission GPU Nuclear Corporation Washington, D.C.
20555 P. O. Box 480 Middletown, PA.
17057 Atomic Safety and Licensing Appeal Board Panel Mr. and Mrs. Norman Aamodt U.S. Nuclear Regulatory Commission 200 North Church Street Washington, D.C.
20555 Parkesburg, PA.
19365 Jack R. Goldberg, Esquire Mrs. Louise Bradford Office of Executive Legal Director TMI ALERT
.U.S.
Nuclear Regulatory Commission 1011 Green Street Washington, D.C.
20555 Harrisburg, PA.
17102 Thomas Y. Au, Esquire Joanne Doroshow, Esquire l
Office of Chief Counsel The Christic Institute I
Department of Environment.1 1324 North Capitol Street l
t Resources Washington, D.C.
20002 505 Fr.ccutive House P. O. Box 2357 Lynne Bernabei, Esquire Harrisburg, PA.
17120 Government Accountability Project Michael F. McBride, Esquire lfr! Connecticut Avenue LeBoeuf, Lamb, Leiby & MacRae Wasnington, D.C.
20036 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Ellyn R. Weiss, Esquire Harmon, Weiss & Jordan Michael W. Maupin, Esquire 2001 S Street, N.W.,
- 430 Hunton & Williams Washington, D.C.
20009 707 East Main Street P. O. Box 1535 Richmond, VA.
23212
/.
D 9
i o
t
~
e GPU Nuclear Corporation N
gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Numeer October 3 1985 5211-85-2159 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U.S Ruclear Regulatory Commission Washington, D.
. 20555
Dear Mr. Stolz:
Tieree Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. OPR-50 Docket No. 50-289 Replica Simulator Status Update In our special status report of July 19, 1985 GPUN indicated that the Singer Link replica simulator delivery was delayed to the second quarter of 1986. Enclosed please find a copy of the GPUN projected milestones remaining for this project which indicate that the optimistic schedule for training on the simulator to begin is August 1986.
Please note that GPUN is currently working with Singer Link to minimize or avert, if possible, further schedule delays.
GPUN will have a full complement of staff and will have developed initial simulator training lesson plans by the revised celivery date. The new butiding being constructed to house the simulator will be completed in October 1985.
Sincerely, I
H. i ill Director. THI-1 1:DH:gpa 2400f/001 Attachment cc: R. Conte J. Thoma Reference a) GPUN Letter (5211-84-2243) dated 10/01/84 de aWuNic Utilities Corporation
~
Ii i
GoU Nu lear orpora ton is su
MILESTONES FOR REpCICA SIMULATOR OPERATION OPTIMISTIC h
W U C f c s t' ESTIMATED SCHEDULE MILESTONE August 30, 1985 Started Integrated Factory Acceptance
- Test (Duration 34 weeks)
~
April 30, 1986 Complete Integrated Factory Acceptance Test June 15, 1986 e
Teardown Pack Ship and Install Replica Simulator at TMI-1 (Duration 6 weeks)
June 15, 1986 Start Site Acceptance Test (Duration 6 weeks)
July 30, 1986 Complete Site Acceptance Test August 1, 1986 Ready for Use
- This testing program consists of 2 fixed time intervals of approximately 17 weeks which cannot be compressed to recover schedule.
%