i TOLEDO
%ms EDISON JOE WILLIAMS. JR.
Docket No. 50-346 s.- vc. we (419}249-2300 Lianse No. NPF-3 Serial No. 1-575 September 20, 1985 Mr. J. A. Hind Division of Radiation Safety and Safeguards United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Hind:
Toledo Edison acknowledges receipt of your August 6, 1985 Inspection Report No. 50-346/85019(DRSS) (Log No. 1-1228), for the routine in-spection of emergency preparedness, including the annual radiological emergency exercise at the Davis-Besse Nuclear Power Station, Unit 1.
Following an examination of the items of concern, Toledo Edison herein offers information on the identified exercise weaknesses:
1.
Exercise Weakness: Differences between offsite geographic subareas depicted on large scale EPZ maps and those depicted in procedure AD 1827.12 contributed to the failure to include all areas within about a two mile radius of the station in the initial offsite protective action recommendation.
(346/85019-01)(Paragraph 5.d)
Response
Administrative procedure 1827.12, Protective Action Guidelines, contains guidance on which geographic subareas to include in protective action recommendations. However, based on a previous agreement with State and Local officials, proposed subarea boundary revisions were being tested during this exercise. The O
Proposed subarea boundaries therefore conflicted 8510310313 850 346 with AD 1827.12 geographic subarcas. The DR ADOCK PDR Emergency Duty Officer failed to consult the f
/)3 procedure, resulting in not including Lake Erie THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 SEP 231985 tl0
,(,
Docket No. 50-346 License No. NPF-3 Serial No. 1-575 September 20, 1985 Page 2
-in his protective action recommendation to offsite authorities.
Based on the exercise results and discussions with the State and Local officials, AD 1827.12 will be revised to be consistent with the large scale EPZ maps. Revisions to AD 1827.12 will be completed by November 1, 1985.
2.
Exercise Weakness: The failure to consult the station's EALs for applicability prior to downgrading from a General Emergency and later from an Alert, plus the incorrect procedural guidance that-emergencies classified as at least an Alert must be downgraded below the Unusual Event class before commencing recovery activities, together resulted in inappropriate emergency declassification. (346/85019-02)(Paragraph 5.d)
Response
The Emergency Action Levels (EAL's) contained in EI 1300.01, Emergency Plan Activation, will be revised to provide additional clarification on classification of emergencies.
Specifically, EI 1300.01 will include:
listing specific indi-cations to be used in classifying an event; providing a cross reference to guide the user to other EAL's which might also apply; standardizing the use of terminology; and providing more guidance in the area of downgrading an emergency classification. This revision will be completed by December 31, 1985.
Very truly yours, Y
dv. lm J. Williams, Jr.
Senior Vice Presidhnt, Nuclear JW/JSL/bjs l