Forwards QA Program Insp Rept 99900844/85-01 on 850722-23 & Notice of Nonconformance
ML20138L444
Person / Time
Issue date: 10/30/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Mott J
TECHNOLOGY FOR ENERGY CORP.
Shared Package
ML20138L448 List:
References
REF-QA-99900844 NUDOCS 8510310310
Download: ML20138L444 (2)


Text

Dn18 :1E'09 4

UNITED STATES y

E NUCLEAR REGULATORY COMMISSION I

(

WASHINGTON, D. C. 20555 October 30, 1985 Docket No. 99900844/85-01 Technology for Energy Corporation ATTN:

Dr. J. E. Mott Senior Vice President 10770 Dutchtown Road Knoxville, Tennessee 37922 Gentlemen:

This refers to the inspection conducted by Ms. N. J. Miegel and other inspectors of this office on July 22-23, 1985, of your facility at Knoxville, Tennessee, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to review Technology for Energy Corporation's (TEC) methods for qualifying and determining the qualified life for TEC safety relief valve (SRV) acoustic monitoring systems and to review the implementation of the TEC quality assurance program. Areas examined during the inspection arid our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Significant findings included:

tailing to prepare QA plans as required, maintaining vendors on the qualified vendors list that had not been audited or evaluated, failing to maintain complete records regarding employee training and certification, and failing to develop a calibration procedure or schedule. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written statement containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

8510310310 851030 00N4 EEC C

October 30, 1985 Technology for Energy Corporation +

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

!qinal Signed by ary G. ZecA Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Notice of Nonconformance 2.

Appendix B-Inspection Report 99900844/85-01 DISTRIBUTION:

DM8:IE:09 A VPB Reading DQAVT Reading RVollmer JTCollins JStone GHolahan,NRR/0RAB EMerschoff LVaughan

.I VPB:00AVT

DQAVT V B:DQAVT D

LVaughan:say rschoff GGZejh rdmes 85 1' ;3 Pf/fl85