Advises of Planned Insp Effort Resulting from Plant Performance Review Completed on 970318.Details of Insp Plan for Approx Next 6 Months Encl
ML20138K146
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/02/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
References
NUDOCS 9705120177
Download: ML20138K146 (3)


Text

_. _. _. _ _,

a 4.

l p* "'%h[%,

UNITES STATES

g...

NUCLEAR HEGUL ATORY COMMISSION

{

j.

j 4

REGION til 5-ij 801 WARRENVILLE ROAD k

/

usLE. n.UNOIS 00532-4361

...s

.May 2, 1997 1

[

d Mr. D. R. Gipson j.

Senior Vice President l

Nuclear Generation l

. The Detroit Edison Company '

i-6400 North Dixie Highway Newport, MI 48166 i

[

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - FERMI 2 l

{

Dear Mr. Gipson:

t

{

On March 18,1997, NRC staff completed the semiannual Plant Performance Review (PPR)

}

of Fermi Nuclear Station Unit 2. The staff conducts these reviews for all operating nuclear j

power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and aUocation of inspection resources. The PPR for Fermi 2 involved the participation of all Region 111 technical

.. divisions es well as responsible NRR staff, in evaluating inspection results and safety

{

performance information for the period of October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as j

inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

The PPR revealed that perforrnance improvement in the Operations and Engineering h

functional areas was slow during this period. In addition, this PPR review revealed a decline in performance in the Maintenance functionel area. This declining trend is primarily

}

due to personnel errors and work control arrors.

r i

This letter advises you of our planned inspection sifort resulting from the Fermi 2 PPR review. The information is provided to enable appropriate consideration of the resource

(

.irppact on your staff, and to permit scheduling conflicts and personnel availability issues to i

be resolved in advance of inspector arrival onsste. The enclosure details our inspection plan for approximately the next 6 months. The rationale or basis for each inspection L

outside the " Core" inspection program is provided so that you ere aware of the reason for

[

emphasis in these program ereas. Rosident inspections, as well as periodic inspections by l

other assigned members of our site focus group, may occur at any time in support of the i

[

Core inspection program.

a F

/

(

f I

E. l.l l.li,l I.ll l'Il.l l.!

@\\

0/10 90-r

.. ~ ti v % J i

9705120177 970502 i

PDR ADOCK 05000341 O'f I

G PDR i

4

- ~~.. - -.- - -.- -. - -

4 e

w

' D. R. Gipson 1 I

We are interested in feedback on this program, including the need for any changes in the 1

inspection plan, and we invite your questions or comments. If changes are necessary, you l

will be informed. If you have any questions or comments, please contact Mr. Michael Jordan st (630) 829-9637.

i l

Sincerely, j

l

/s/ John A. Grobe for i

James L. Caldwell, Director Division of Reactor Projects i

l Docket No. 50-341 License Nos. NPF-43 i

Enclosure:

Inspection Plan cc w/ encl:

N. Peterson,

{

j Supervisor of Compliance l

P. A. Marquardt, Corporate legal Department James R. Padgett, Michigan Public 4

Service Commission 3

Michigan Department of f

Public Health Monroe County, Emergency Management Division Docket File w/ encl Project Manager, NRR w/enci PUBLIC IE-01 w/enci DRP w/enci OC/LFDCB w/enci Rlli PRR w/ encl SRI Fermi w/enci A. B. Beach, w/ encl Rlli Enf Coordinator w/ encl Deputy RA, w/ encl DOCUMENT NAME: G: Farm.ir\\ferins.Itr T.

..m w em 4

w. hie w m. m.. c - c.n ww m w --w=. e - c.n wem n i u.a*.

m - m.

n

\\

OFFICE Rlli l$ j Rlli ld Rlil,,

l Rlli l$ Rlli n

/

Kozah.

Es Ri C

Jordan dg$

NAME G

04/ 5/97 04/$97 04FpV97 04/y/97 Oy/ M97 DATE 9

' OFFICIAL. RECORD COPY

m

... _.. _ =. _. _ _. _ _ _ _. _. - _... _ _ _ _

_. - _. _. ~........

Y FERMI 2 l

INSPECTION PLAN i

i INSPECTION TITLE /

NUMBER OF PLANNED TYPE OF INSPECTION -

i I

PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES l

Maintenance Performance Inspection 2

5/12-23/97 Regional Initiative Radiation Monitors and h

IP 84750 Effluent Monitoring 2

5/12-16/97 Core inspection

[

IP 84750 Chemistry and REMP 1-2 6/2-6/97 Core inspection i

IP 84750 Radiation Protection 1-2 8/25-29/97-Cors inspection l

lP 82701 Routine EP inspection 1-2 4/28-5/1/97 Core inspection f

Ti 2515/132 Vehicle Barrier System 1

8/4-5/S7 Tl Inspection Engineering & Technical 2-5 5/19-23/97 Care inspection i

Support Security Core Inspection 1

5/19-23/97 Core inspection IP 81700 Cors inspection IP 81700 Security Core inspection 1

8/25-29/97 i

IP - Inspection Procedure Ti - Temporary Instruction I

Core inspection - Minimum NRC Program (mandatory all plants)

{

i 1