ML20138K098
| ML20138K098 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/01/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jamila Perry COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20138K102 | List: |
| References | |
| 50-010-97-04, 50-10-97-4, 50-237-97-04, 50-237-97-4, 50-249-97-04, 50-249-97-4, NUDOCS 9705120153 | |
| Download: ML20138K098 (3) | |
See also: IR 05000010/1997004
Text
__
_
._
_ _ . _ _
._
_
__.
._.__g
-
_
Pubuc
s
May 1, 1997
g
Mr. J. S. Perry
Site Vice President
Dresden Station
i
Commonwealth Edison Company
6500 North Dresden Road
j
Morris, IL 60450
SUBJECT:
NRC RESIDENT INSPECTION REPORT 50-010:237:249/97004(DRP)
Dear Mr. Perry:
This refers to the inspection conducted from January 25 through March 7,1997, at the
Dresden Nuclear facility. The purpose of the inspection was to determine whether
3
activities authorized by the license were conducted safely and in accordance with NRC
j
requirements. During this period, routine resident inspections, augmented with regional
personnel and with residents from other sites, were performed. At the conclusion of the
inspection, the findings were discussed with those members of your staff identified in the
i
enclosed report.
During this inspection period your staff, concurrent with the NRC, identified several
performance issues in operations. Your staff's recognition of these issues and the steps
taken to reinforce operational standards were indicative of a sound self-assessment
process. The effectiveness of your staff's corrective actions will be assessed by the NRC
in future inspections.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
i
Sincerely,
/s/ Jams L. Caldwell
James L. Caldwell, Director
Division of Reactor Projects
Docket Nos. 50-10; 50-237; 50-249
License Nos. DPR-2; DPR-19; DPR-25
Enclosure: Inspection Report 50-010:237:249/97004(DRP)
g
PLEASE SEE ATTACHED CONCURRENCES
DOCUENT NAW: fWNSF9FTSPOWERSORESCRE97004.DFP
To ,eceive a copy of thes document. wecate in the hos *C" = Copy wthout ettech/enal "E" = Copy with attach /enci "N" = No copy
0FHCE
fun
fun
fun
NAaAE
Lerch/co
K, opp
Caldwed
DATE
5/
19 7
5/
19 7
5/
/97
vrrmeAL PEGDFID LOPY
120030
lllll ll!I llllll lllll
...
. . . .
.
9705120153 970501
'
ADOCK 05000010
0
. -
-
- - -
-
-
.
1
)
s
May 1, 1997
Mr. J. S. Perry
Site Vice President
,
Dresden Station
i
Commonwealth Edison Company
6500 North Dresden Road
i
Morris, IL 60450
SUBJECT:
NRC RESIDENT INSPECTION REPORT 50-010:237:249/97004(DRP) AND
Dear Mr. Perry:
This refers to the inspection conducted from January 25 through March 7,1997, at the
j
Dresden Nuclear facility. The purpose of the inspection was to determine whether
'
activities authorized by the license were corducted safely and in accordance with NRC
requirements. During this period, routine resident inspections, augmented with regional
personnel and with residents from other sites, were performed. At the conclusion of the
inspection, the findings were discussed with those members of your staff identified in the
enclosed report.
During this inspection your staff, concurrent with the NRC, identified events and issues
that were indicators of a change from the previously observed performance. Your staff's
recognition of this declining performance and the steps taken to reinforce operational
standards was indicative of a sound self assessment process. The effectiveness of your
staff's corrective actions to reverse this declining trend will be assessed by the NRC in
future inspections.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. A. Grobe
James L. Caldwell, Director
Division of Reactor Projects
>
Docket Nos. 50-10; 50-237; 50-249
License Nos. DPR-2: DPR-19; DPR-25
.
Enclosures:
Wtice of ViolatiW
2. Inspection Report 50-010:237:249/97004(DRP)
DOCUWWT NAM: fuNOMPTSPOWEM5WRESWRE97004.0fr
To recove a copy of the document irdcate in the bos *C" = Copy wethout attach /enal T - Capy unth setach/enci *N" = No copy
kg M M
OPP G
fun
M
&
J cens P
M.
te,eh,- eut
x,e.,
! /97
DATE
h
/97
dl l /97
_
._.
_
- .
.- .
_ _ . _ , _ _
_
~ . . .
.
.
_ _ , _ . . _ _
-
- . .
. - - - .
. - - - . - . - ~ - - - - . - - - .~.- ----.-.
-
- .
. -
!
r
!
=
i
'
J. S. Perry
-2-
>
.
4
cc w/ encl:
T. J. Maiman, Senior Vice President ~
j
i
Nuclear Operations Division
i
D. A. Sager, Vice President,
!
Generation Support
H. W. Keiser, Chief Nuclear
j.
Operating Officer
i
T. Nauman, Station Manager Unit 1
1
'
M. Heffley, Station Manager Units 2 and 3
F. Spangenberg, Regulatory Assurance
Manager
1. Johnson, Acting Nuclear
Regulatory Services Manager
3
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
i
Document Control Desk-Licensing
,
Distribution
Docket File w/enct
Project Manager, NRR w/enci
,
PUBLIC IE-01 w/enci
DRP w/ encl
)
OC/LFDCB w/ encl
Rlli PRR w/enci
l
SRI LaSalle, Dresden,
CAA1 w/enci(E-Mail)
Quad Cities w/enci
A B. Beach, w/ encl
1
RAC1 (E-Mail)
Rlli Enf. Coordinator, w/enci
(
Deputy RA, w/ encl
DRS (2) w/enci
l
TSS w/enci
M. Webb, Project Manager, NRR w/enci
j
)
i
i