Submits Crdr for Beaver Valley Unit 1 Nuclear Power Plant, Summary Rept Describing Methods Used to Carry Out 830927 Dcrdr Program Plan,In Response to NRC in-progress Audit Rept
ML20138J906
Person / Time
Site: Beaver Valley
Issue date: 11/29/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML20138J910 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NUDOCS 8512180123
Download: ML20138J906 (2)


Text

I i

e

'Af Telephone (412) 393-6000 Nuclear Group P.O. Dox 4 November 29, 1985 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Attn:

Mr. Hugh Thompson, Director Division of Licensing Washington, DC 20555 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Generic Letter No. 82-33; Supplement 1 to NUREG-0737 Detailed Control Room Design Review.

Gentlemen:

In accordance with our commitment documented in our Confirmatory Order dated June 12, 1984, we are providing the Summary Report for the Detailed Control Room Design Review (DCRDR) of the Beaver Valley Nuclear Power Station Unit 1 Nuclear Power Plant.

The Summary Report describes the methods used to carry out the DCRDR Program Plan dated September 27, 1983 and in response to the NRC In-progress Audit Report.

The DCRDR findings are summarized and priorities identified for the corrective actions in the Summary Report.

The recommended corrections identified in the Summary Report were determined to provide the most appropriate resolutions based on human engineering principles and assessment by the DCRDR Team.

It should be noted that certain corrective actions, upon a detailed engineering evaluation, may be found to conflict with other design requirements such as train separation, 10CFR50 Appendix R, etc.

In such

cases, the corrective actions may be revised or alternate actions may be required.

Notwithstanding, it is the intent of Duquesne Light Company to implement alternate resolutions according to the priority schedule originally provided in the Summary Report.

Very truly yours, h52180123851129 Care OI F

ADOCK 05000334

/

e Presi ent, Nuclear PDR Attachment sW-

sanvor Vallcy Powar Station, Unit No. 1

.DoBkot No. 50-334,' License No. DPR-66

Generic Letter No. 82-33; Supplement 1 to NUREG-0737 Detailed Control Room Design Review.

Page 2 cc:

Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear' Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

.