05000423/LER-1996-015-04, Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr

From kanterella
(Redirected from ML20138J795)
Jump to navigation Jump to search
Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
ML20138J795
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/01/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138J798 List:
References
B16276, NUDOCS 9705090020
Download: ML20138J795 (5)


LER-1996-015, Forwards LER 96-015-04,documenting Condition Determined at Unit 3 on 960610.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability
4231996015R04 - NRC Website

text

.--

/h/p) Northe
st Hole Fem H<ldHouse 1">S Watufoni, CM3385 Nuclear Energy slaisione Nudcar Power Station Northeast Nudear Energy Company P.O. Ibs 128 Waterford, Ur 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitice System May 1,1997 Docket No. 50-423 B16276 Re: 10CFR50.73(a)(2)(i)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-015-04 Submitted Pursuant to 10CFR50.73(a)(2)(i)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)

This letter forwards Supplement 4 to Licensee Event Report 96-015-00,

- documenting a condition that was determined at Millstone Unit No. 3 on June 10, 1996. This LER is submitted pursuant to 10CFR50.73(a)(2)(i)(B),

10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

)

l Very truly yours, i

NORTHEAST NUCLEAR ENERGY f

2}

COMPANY r

9705090020 970501 A

f)

PDR ADOCK 05000423

- jw s

PDR Mo Unit Director, Millstone Unit No. 3

! (! ! !

~

U.S. Nucinar Rcgulatory Commission B16276/Page 2 Attachment: 1)

NNECO's commitments in response to LER 96-015-04 2)

LER 96-015-04 cc:

H. J.

Miller, Region i Administrator A. C Cerne, Senior Resident Inspector, Millstone Unit No. 3 l

J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 i

W. D. Travers, Dr., Director, Special Projects i

i t

1-i t

i l

t l

k l

I i

(

t i

(

I

I i

Docket No. 50-423 l

B16276 i

e r

t i

i t

i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments In Response To (LER 96-015-04) i l

l l

l May 1,1997 3

q l

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Manager -

t Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

l i

Number

Commitment

Due B15964-02 Identified electrical separation deviations Prior to entry into l

will be corrected or restored to compliance Mode 4 l

with the design basis.

l 3

I I

i I

l e

t Docket No. 50-423 B16276 9

t

?

l i

Millstone Nuclear Power Station, Unit No. 3 i

NNECO's Submittal of L

(LER 96-015-04) 1 l

r i

l May 1,1997 i

i j