F 8
o,,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION 5
E WASHINGTON, D. C. 20555 t
'l
%,..... f~
DEC 131985 D:cket Nos.
50-445 50-446 MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Project Division of Licensing Office of Nuclear Reactor Regulation FROM:
Brian K. Grimes, Director Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
SUBJECT:
INSPECTION OF DESIGN ADEQUACY PROGRAM A. Vietti-Cook's memorandum dated November 26, 1985 requested that trip reports be written for inspections conducted during October through December 1985.
During the week of October 28 to November 1,1985, IE conducted its initial inspection of the Design Adequacy Program at TERA's offices in Bethesda, MD.
The inspection covered Phase 3 scope validation, review checklists and personnel qualifications, and will be documented in an IE inspection report.
/'
MJ W'
Brian K. Grimes, Director Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement cc:CPDR7 T. Westerman, RIV A. Vietti-Cook, NRR 8512170555 851213
{DR ADOCK 05000445 PDR
F 0
gc 13 M Dscket Nos. 50-445 50-446 MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Project Division of Licensing Office of Nuclear Reactor Regulation FROM:
Brian K. Grimes, Director Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement
SUBJECT:
INSPECTION OF DESIGN ADEQUACY PROGRAM A. Vietti-Cook's memorandum dated November 26, 1985 requested that trip reports be written for inspections conducted during October through December 1985. During the week of October 28 to November 1,1985, IE conducted its initial inspection of the Design Adequacy Program at TERA's offices in Bethesda, MD.
The inspection covered Phase 3 scope validation, review checklists and personnel qualifications, and will be documented in an IE inspection report.
Original "* ""
Brian K. Grimes, Director Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement cc:
PDR T. Westerman, RIV A. Vietti-Cook, NRR f
QAB:DQAVT:IE Q
AT:IE C:QA QAVT:IE T: E DPNorkin:nkp J
lhoan GTA n
r 12/s /85 12/g /85 12/lj 5 12/fEJ85 s