ML20138J536
| ML20138J536 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/30/1985 |
| From: | Mcdonald R, Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8512170553 | |
| Download: ML20138J536 (5) | |
Text
.
-+.1
+
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12-5-85 COMPLETED BY J. D. Woodard TELEPHONE DOS) R99-5156 OPERATING STATUS
- 1. Unit Name: J seph M. Farlev - Ur.it 2 Notes Novembe r, 1985
- 2. Reportag Penod:
- 1) Cumulative data since
- 3. IJceased Thennal Power (MWt): 2,652 7-30-81, date of commercial g
- 4. Nameplate Rating (Gross MWe):
operation.
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 850. 2 807.2
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gire Reasons:
N/A-N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
O
~
This Mcath Yr.-to.Dete CurInulative 720 8,016 38,041
- 11. Hours In Reportug Period
- 12. Number Of Hours Reactor Was Critical 720.0 6.144,1 33.062.6 0.0 0.0 138,0
- 13. Reactor Reserve Shutdce Hours 720.0 6,070.3 32,648.4
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,874,503 15,455,729 82,308,477
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electncal Energy Generated (MWH) 625,098 5,128,790 27,075,072 595,532 4,853,002 25,671,924
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100.0 75.7 85.8 100.0 75.7 85.8
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 102.5 75.0 83.3
- 22. Unit Capacity Factor (Using DER Net) 99.8 73.0 81.4
- 23. Unit Forced Outage Rate 0.0 2.4 4.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration-of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05-06-81 05-08-81 INITIAL ELECTRICITY 05-24-81 05-25-81 08-01-81 07-30-81 COMMERCIAL OPERATION le N 1/3 B512170553 8 64
.=,.
PDR ADOCK O5 ppg I~1
50-364 EET NO.
UNIT 2 DATE N'comhor 5-1985 J. D. U m dard COMPLETED BY
_ p# '
TELEPHONE (205) 899-5156 November SiONTl!
j DAY AVERACE DAILY PO VER LEVEL DAY' AVERACE DAILY POWER LEVEL ptWe Net)
Olwe Net)
J30 828 g,
g7 2
830 13 828 3
o,,
g9 q,q 837 825 4
gg 5
818 21 801 773 6
838 22 834 831 7
840 828 g
3 827 834 25-9 10 832 26 824 11 n90 27 R99 823 830 3
12 13 All J
821 14 830 30 824 g5 829 33 16 R10 INSTRUCTIONS On ifiis formst. list the 2versg dsily unit power levelin M'Ve-Net for each day in tt.. reporting month. Compute to
, the nearest whole megswatt.
(9/77)
- O l
l
O O
O UNIT SilUTDOWNS AND POWER REIM)C110NS DOCKET NO. 50-364 UNIT NAME J.M.Farley - Unit I DATE December 5, '985 REPORT MONTH November, 19 85 COMPLETED sy J. D. Woodard TELEPilONE (205)899-5156 s =%
=
g o
r.
N"-
D
1
'E _I k
'8 g g Licensec gv.
Cause & Corrective go g
e s ac Evepit uT 3
Actam to N0 Pscvent H cusicace c6 of jifi j R8P*l #
6 THERE WERE NO UNI 1 SHUTD MINS OR SIC RIFICANT POWI R RE )UCTIONS DURING THE MONTH OF NOVEMBER.
i i
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) l Manual for Pseparation of Data H Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repmt (LER) File INUREG-D Regulatoay Restsiction 4 Ostier (Explain) 0161)
E-Operator Training a license Examination F Adminisisative 5
G-Operational Estor (Explain)
Exhibit I - Same Source (9/77) ll Othes (Explain) i
[
=,-
- MaHing Address
' Alibim3 Pow r Company 600 North 18th Strsst a
Post Of face Box 2641 -
Birmin0 ham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Sen;or Vice President Flintridge Building Alabama Power i
resc u w.e cs.% -
December 9,1985
. Docket No.' 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission
' Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the November 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very tr y,
[
'.s R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy)
I J
if
-o,
~
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SIPNARY OF OPERATIONS November, 1985 There were no unit shutdowns or significant power reductions during the month of November.
The following major safety-related maintenance was perform d in the month of November:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
1