ML20138J398
| ML20138J398 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/23/1985 |
| From: | Domer J TENNESSEE VALLEY AUTHORITY |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8510290331 | |
| Download: ML20138J398 (2) | |
Text
-
~
sgggggjggpxnox
~
CH ATTANOOGA. TENNESSEE 37401 4
400 Chestnut Street Tower II October 23, 1985 Director of Nuclear Reactor Regulation Attention:
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Connaission Washington, D.C.
20555
Dear Ms. Adensam:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 By the April 12, 1985 letter from T. M. Novak to H. G. Parris, NRC requested information on the intrusion detection system (FPS-2) for our Sequoyah Nuclear Plant. By my May 29, 1985 letter to T. M. Novak, we provided clarification of information to be provided.
In accordance with the May 29, 1985 letter, enclosed are surveillance instruction (SI) test results for FPS-2 at Sequoyah performed on the dates specified in the enclosure, j
The enclosed information is being sent by registered mail because it contains safeguards information. The signed receipt signifies that you have received this information and acknowledge that it contains safeguards material and should be withheld from public disclosure as defined by 10 CFR 73.21.
Very truly yours, SAFEGUARDS INFOhMATION
88[*""'^""'"
)J.A.Domer, Chief
. A. Moman.
ATTACHED i
Nuclear Licensing Branch Sworn a
subscribe bef re me this day of 1985 Notary Public g,
My Conselssion Expires Bf b
Wd Enclosures rd %du 8%h7 I
F l
An Equal Opportunity Employer
r 4
- Director of Nuclear Reactor Regulation October 23, 1985 cc:
U.S. Nuclear Regulatory Commission Region II Attn:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Carl Stahle Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 1
r l
l l
t I
l