April 25,1997
.
EA 97-129
Southern Nuclear Operating Company. Inc.
ATTN: Mr. C. K. McCoy
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
Birmingham, AL 35201
SUBJECT:
(NRC INSPECTION REPORT NOS. 50 424/97-02 and 50-425/97 02)
'
i
l
Dear Mr. McCoy:
~
This refers to an inspection conducted on February 10-14. and March 3 7, 1997,
at the Vogtle Electric Generating Plant. The subject inspection included a
l
review of the circumstances associated with a radioactive material package
prepared for shipment at your site, and when surveyed subsequent to its
arrival at a vendor facility, had external surface radiation levels exceeding
4
10 millisieverts aer hour (mSv/hr), i.e., 1000 millirem per hour (mrem /hr)
contrary to 49 CF1 173.475. The package was part of aa October 23, 1996
.
-
exclusive-use, closed transport vehicle shipment which was received at a
vendor facility on October 25, 1996. On October 29, 1996, the vendor
identified that the package dose rate measurements exceeded regulatory limits.
The subject inspection report which identified this transportation issue as an
apparent violation, was transmitted to you by letter dated March 27, 1997. An
open, predecisional enforcement conference was conducted in the Region II
office on April 18, 1997, to discuss the apparent violation, the root causes,
.
and your corrective actions to preclude recurrence. A list of conference
.
attendees, and all presentation material used during the conference are
enclosed.
Based on the information developed during the inspection and the information
you and your staff provided during the conference, the NRC has determined that
'
a violation of NRC requirements occurred. The violation is cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding it are
described in detail in the subject inspection report.
Based on the details
associated with the event, we consider the actual and potential safety
consequences of the violation to be minimal. Only one package within the
exclusive use shipment exceeded the surface dose rate limits when surveyed at
the vendor facility. When originally shipped, the subject package wa:;
-
positioned such that other packages provided shielding.
Further, all
transport vehicle dose rates were within regulatory limits when dispatched
j
from your facility and upon its arrival at the vendor facility. We are
concerned that the violation resulted from the failure to properly clean and
decontaminate items being processed for shipment and conduct adequate
radiological surveys of equipment removed from the s)ent fuel pool. Your
initial and proposed corrective actions including enlanced training, upgrades
to cleanliness procedures and evaluation of additional shielding for materials
removed from the spent fuel pool and prepared for shipment are considered
appropriate.
(
9705080190 970425
P
ao"
8M*
,lllll ll lllll Il.l ll
5
..
..
.
.
,
)
i
SNC, Inc.
2
,
i
l
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing you response.
In your
response you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter, its enclotures, and your response will be placed in the NRC
Public Document Room (PDR). To the extent possible, your response should not
include any aersonal privacy, or proarietary, or safeguards information so
that it can 3e placed in the PDR wit 1out redactions
Sincerely,
.
(Original signed by J. P. Jaudon)
Johns P. Jaudon. Director
i
Division of Reactor Safety
Docket Nos. 50 424, 50 425
License Nos. NPF 68. NPF 81
Enclosures: 1.
2.
List of Conference Attendees
3.
NRC Slides
j
4.
Licensee Slides
1
cc w/ encl
'
J. D. Woodard
i
Senior Vice President
'
Southern Nuclear Operating Co., Inc.
P. O. Box 1295
Birmingham, AL 35201
J. B. Beasley
General Manager, Plant Vogtle
Southern Nuclear Operating Co. , Inc.
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey
Manager Licensing
Southern Nuclear Operating Co., Inc.
P. 0. Box 1295
Birmingham AL 35201
cc w/encls cont'd: See page 2
i
. _ _ - . _ _ . _
__ _ _
_ . _ _ _ _ _ _ . _ . .
__-
-_-_ .
__ _ _ _ _ . _ _ -
.
.
3
,
SNC, Inc.
3
a
,
cc w/encls cont'd:
,
Jim Hurt, Director
'
Consumers' Utility Counsel Division
'
!
Governor's Office of Consumer Affairs
?
2 M. L. King, Jr. Drive
s
Plaza Level - East: Suite 356
1
Atlanta, GA 30334 4600
-
Office of Planning and Budget
Room 6158
270 Washington Street, SW
I
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
j
Harold Reheis Directcr
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Thomas P. Mozingo
Manager of Nuclear Operations
Oglethorx Power Corporation
2100 E.
Exchange Place
Tucker, GA 30085-1349
Charles A. Patrizia. Esq.
Paul, Hastings, Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
Washington, D. C.
20004-9500
,
Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority
of GeorSia
1470 Riveredge Parkway NW
Atlanta, CA 30328 4684
Distribution w/encls: See page 4
j
__. .-._. _
-
. _ _ - - .
. - . _ _
- . .
_ . . . _ - _ . -
. . . _ . . = - _ - - . -
._. - . _ _ - . -
_-
!
.
.
l
SNC, Inc.
4
l
Distribution w/encls:
J. Lieberman, OE
B. Summers. OE:EA' file (2 LTRHD)
N. Hamish, OE
E. Easton, NMSS
i
G. Cook, NMSS
i
L. Wheeler, NRR
P. Skinner, RII
.
A. Boland, RII
!
R. Carrion, RII
i
W. P. Kleinsorge, RII
l
PUBLIC
NRC Senior Resident Inspector
l
U.S. Nuclear Regulatory Commission
8805 River Road
'
Waynesboro, GA 30830
i
!
- FOR PREVIOUS CONCURRENCE SEE ATTACHED PAGE
OFFICE
Rff:DR$*
Pff DRS*
P11:DRP*
Rff ffCS*
Rit:ffCS*
Rff:M A*
l
SIGNATURE
NAME
GKulo
KBarr
PSkinner
ABoland
Buryc
CEvans
04 /
/ 97
N/
/ 97
04 /
/ 97
04 /
/ 97
04 /
/ 97
04 /
/ 97
COPY 1
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
N0
0FFICIAL RECORD COPY
000UMENT NAME G:\\RPI5\\970iNOV.VEG
4
-.
-
- - - . . .. -
-
.
.
.
. _ . _ . . . _
.
- .
,
.
.
SNC, Inc.
4
$4MMcCS -
l
Di
ribution w/encls:
J.(&==, OE:EA file (2 LTRHD)
Lieberman, OE
.
B.
N. Hamish, OE
E. Easton, NMSS
'
G. Cook, NHSS
L. Wheeler, NRF,
P. Skinner, RII
A. Boland, RII
R. Carrion, RII
,
W. P. Kleinsorge, RII
PUBLIC
NRC Senior Resident Inspector
'
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro, GA 30830
t
.i
ortfCE
Rif:0RS
Rff:0Rs /
Rif:0RP
Ril:ETCS
.
Rff:ffCS
PIf ORA
SICAATURE
[
h
KBakr)
.
PSkinner
A8olag
BL
CEvans
NAME
o
4 /h / 97
04,lf
/ 97
DATE
04 /$1 / 97
04
/ 97
04 / 7 k / _97
/
/ 97
COPY?
h
NO
[YES/
NO
YES
(ho)
/ YES
N0
fEh
NO
[fES) NO
UttlCIAL RECORD COPY
DOCUMENT NAMi G:\\RPI5\\970lNOV.VEG
~
-
.
_