CPERATING DATA REPORT Docket No. 50-317 Date December 4,1985 Completed by R. Porter Telephone: (301) 260-4747 OPERATING STATUS seeeeeeeeeeeeeeeees 1.
Unit Name:
Calvert Cliffs No.1 2.
Reporting Period:
NOVEMBER 3.
Licensed Thermal Power (MWT):
2,700 4.
Nameplate Rating (gross MWe):
918 5.
Design Electrical Rating (Net MWE):
845 6.
Maximum Dependable Capacity Gross MWe:
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Ratings:
None 9.
Power Level To Which Restricted (Net MW):
NA 10.
Reasons For Restrictions:
NA
- Ihis Month Yr-To-Date Cumulative 11.
Hours In Reporting Period 720 8,016 92,629 12.
Number Of Ilours Reactor Was Critical 720 4,623.6 72,121.5 13.
Reactor Reserve Shutdown Ilours 0.0 1,034.3 3,019.4 14.
Hours Generator On-line 720 4,444.7 70,615.5 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1,935,146 11,544,668 175,327,405 17.
Gross Electrical Energy Generated (MWH) 657,548 3,879,380 57,922,760 18.
Net Electrical Energy Generated (MWH) 631,234 3,707,217 55,263,783 19.
Unit Service Factor 100.0 55.4 76.2 20.
Unit Availability Factor 100.0 55.4 76.2 21.
Unit Capacity Factor (Using MDC Net) 106.3 56.1 72.8 22.
Unit Capacity Factor (Using DER Net) 103.8 54.7 70.6 23.
Unit Forced Outage Rate 0.0 18.6 9.1 24.
Shutdowns Scheduled Over the Next Six Months (type, date, and duration): None 25.
If Shutdown At End Of Report Period, Estimated Date Of Startup: N/A r
p D
PD R
IE2.4 AJ
IfMIT SIRTI1XNN6 AND RMR REDICTIONS IN)CKET No. 50-317 IlNIT NApt: Calvert Cliffs 1 IWIE _Qegmber ' 4. 1985 CfM'IFIED BY & J. Porter REI'URT PRNrI14 November
'IEl.E M ENIE (301) 260-4747 7
Itj3 c-es
_,; g I.icensen g
gtg Cause & Correct.ive 0 [
c
~
k yj f
5gg
- Event, 4
y) 9g Act. ion t o No.
Date Regwirt, #
,g 5
{u Prevent, Recnrevnce c
y jg g
. v:
u 8
i No shutdowns or reportable i
reductions this reporting period.
l l
i i
s I
4 F: Forced Reason:
M ttwxt:
Eshibit. G-Inst uct ions S: Scininled A-Eq igunent. Failnav (Explain) 14bnual for l'reparat ion of Data ll-Flaint enance or Test, 2->1anual Scram.
Ent ry Sheet a for Licenw C-Refue1ing 3-Ant omat ic Scram.
Event Regwn t. (lIR) l'i1e D-Regalat ory Rest rictieni 1-01 hee (Explain)
( N1'Rif.-0161 )
E-Ogw rator Training & Licene Examination F-Administ rat.ive G-Operat.ional Errur (Explain) 5 Exhibit 1 - Same Sanre l
Il-Othee (Explain)
{
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No.1 Date: December 4,1965 Completed By R. Porter Telephone: (301)-260-4747 NOVEMBER eeeeeeeeeeee i
Day Average Daily Power Level Day Average Daily Power Level (MWe-Net)
(MWe-Net) 1 875 17 876 1
2 873 18 876 3
876 19 876 4
877 20 876 i
5 877 21 876 6
877 22 879 7
878 23 879 8
879 24 878 9
878 25 879 10 878 26 878 11 876 27 879 12 873 28 879 13 872 29 879 14 873 30 878 15 875 16 876 INSTRUCTIONS:
On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OPERATING DATA REPOLT Docket No. 50-318 Date: December 4,1985 Completed by R. Porter Telephone: (301) 260-4747 OPERATING STATUS seeeeeeeeeeeeeeeee.
1.
Unit Name:
Calvert Cliffs No. 2 2.
Reporting Period:
NOVEMBER 3.
Licensed Thetmal Power (MWT):
2,700 4.
Nameplate Rating (gross MWe):
911 5.
Design Electrical Rating (Net MWE):
845 6.
Maximum Dependable Capacity Gross MWe:
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Retings:
None 9.
Power Level Tn Which Restricted (Net MW):
NA 10.
Reasons For Restrictions:
NA This Month Yr-To-Date Cumulative 11.
Hours In Reporting Period 720 8016 75,984 12.
Number Of Ilours Reactor Was Critical 0.0 6,332.9 62,891.7 13.
Reactor Reserve Shutdown Hours 0.0 292.7 1,260.7 14.
Hours Generator On-line 0.0 6,303.5 61,922.8 15.
Unit Reserve Shutdown liours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWil) 0 16,678,113 155,399,050 17.
Gross Electrical Energy Generated (MWil) 0 5,497,569 51,155,772 18.
Net Electrical Energy Generated (MWil) 0 5,260,560 48,802,768 19.
Unit Service Factor 0.0 78.6' 81.5 20.
Unit Availability Factor 0.0 78.6 81.5 21.
Unit Capacity Factor (Using MDC Net) 0.0 79.5 78.1 22.
Unit Capacity Factor (Using DER Net) 0.0 77.7 76.0 23.
Unit Forced Outage Rate 0.0 5.7 6.2 24.
Shutdowns Scheduled Over the Next Six Months (type, date, and duration): None 25.
If Shutdown At End Of Report Period, Estimated Date Of Startup: December 11, 1995
m _.
i P
UNIT SIRrmutelS AIS) I'UNER RfWUCTIONS DOCKET NO. 50-318 UlftT NAPE Cnivert Cliffs 2 l
DA M December 4.
1985 OIPE'IEITD BY R. J. Porter i
REf0RT PRMrIM November 17,1.EI'IRMIE (301) 260-4747 l
.o Y tr 5 c-es c
,3 'g I.icensee
[
l 0, '[
C
.s. p x I: vent, u l'
$g Cause & Cor rect ive
~
No.
Ibte 0
o5 9 e t
Action t.o co e
ey c
l g,
E. -.
E g
jjg Regnt t. #
g u
l'revent. Reciertence
. vs.s u
i S
i i
85-15 851101 S
720 C
1 NA RC FUELXX Sixth scheduled refueling I
i l
i i
i i
1 I
l.
L i
t t.
[
l 3
4 F: forred Reason:
Mr fluxt:
1:sliihit. G-Inst ruct. ions A-Fqii wm?nt. Failure (Explaiti) 1 -Miniial for Perparat. ion of Data S: Scheduled l
IbMaint enance or ' Test.
2-Minnal S< ram.
Ent a y Slu cts for 1.icense C-Refneling 3-Ant omatic Scram.
Event Peport (LER) File D-Regulat ory Rest rict. ion
.$-Ot her (Explain)
(hTREG-016 )
E-Operat or Training & l.icense Examinat. ion F-Achnini st rative i
G-Operat lonal Ertur (Explain) 5 Exhibit I - Same Sninvc Il-Other (r.splain)
I
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: December 4,1985 Completed By R. Porter Telephone: (301)-260-4747 NOVEMBER eeeeeeeeeees Day Average Daily Power Level Day Average Daily Power Level (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I
SUMMARY
OF UNIT 1 OPERA'I1NG EXPERIENCE NOVEMBER 1985 11/1 At the beginning of this reporting period, the Unit was at 870 MWe with the reactor at 100% power.
11/30 At the end of this reporting period, the Unit was at 874 MWe with the reactor at 100% power.
t I
l
.... - _ _. ~ -
SUMMARY
OF UNFF 2 OPERATING EXPERIENCE 1
NOVEMBER 1985 i
11/1 At the beginning of this reporting period, the Unit was shutdown for its sixth scheduled refueling outage.
11/4 Refueling was completed at 1500.
11/30 At the end of this reporting period, the Unit was shutdown for its sixth scheduled refueling outage.
')
i 1
s i
d f
l t
,~
.. - -.. _ ~
t l
December 4,1985 i
REFUELING INFORMATION REQUEST i
j 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 I
2.
Scheduled date for next Refueling Shutdown: October 25,1986 4
?
- 3.
Scheduled date for restart following refueling: January 4,1987 i
l 4.
Will refueling or resumption of operation thereafter require a technical speelfication j
change or other license amendment?
~
j Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a 1:esh reload batch and reshuffled core.
j
- 3.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l September 29,1986 l
1 1
3 6.
Importai t licens,ing considerations associated with the refueling.
4 Reload fuel will be similar to that reload fuel inserted into the previous cycle.
i l
7.
The nur.ur of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
4
{
(a) 217
- (b) 1000
~
j Spent Fuel Pools ere common to Units 1 and 2 1
j 8.
(a) The present licersed spent fuel pool storage capacity, and (b) the size of any
{
1 increase in licensed storage capacity that has been requested or is planned, in number j
of fuel assemblies.
I i
(a) 1830 i
(b)0 i
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off
]-
load.
i April,1991 3
- This information has changed since the last report.
]
i I
a f
t I
December 4,1985 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 7,1987.
- 3. Scheduled date for restart following refueling: May 15,1987.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b)in the Spent Fuel Storage Pool.
(a) 217
- (b) 1000 Spent Fuel Pool is common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- This information has changed since the last report.
r
~
..r
+.
l.
a BALTIMORE G AS AND ELECTRIC COiNPANY P.O. BO X 14 7 5
/
B ALTIMOR E. M A R Y L AN D 21203
~
r NUCLEAR POWER DEPARTMENT Cf.LVERT CLIFF $ NUCLEAR POWER PL ANT December 4,1985 LUS8Y. M ARYLAND 20457 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20055 l
7 l
Attention:
Document Control Desk
Subject:
Novemtxt Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
l The subject reports are being sent to you as required by 'Icehnical l
Specification 6.9.1.6.
/
If there are any questions, please contact Bob Porter (301)' 260-4747.--
f Sincerely, c..
j t
y \\
L. B. Russell Plant Superintendent LBR/djw Attachments
~
^
w l
~'
Copies:
R. F. Ash (BG&E)
T. Magette (DNR)
M. Beebe (NRC)
R. R. Mills (CE)
E. K. Bewley (BG&E)
P. A. Pieringer (BG&E) i l
T. Foley (NRC)
D. Reilly (IN PO)
II. A. Eggleston (BG&E)
P. Ross (N RC)
K. Gibbard (DOE)
T. E. Ruszin, Jr. (BG&E)
W. J. Lippold (BG&E)
P. D. Sierer, Jr. (BG&E)
A. E. Lundvall, Jr.(BG&I!)
E. Wenzinger (N RC)
+
g
..