Informs of Progress on IE Bulletin 85-002 Re Actuation of Reactor Trip Breaker Shunt Trip Coil on Automatic Reactor Trip Signals.Investigation Re 851029 Attachment Undervoltage Trip Failures Will Be Available by 860131
ML20138J122
Person / Time
Site: Cook  
Issue date: 12/06/1985
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0962A, AEP:NRC:962A, IEB-85-002, IEB-85-2, NUDOCS 8512170439
Download: ML20138J122 (1)


Text

F' INDIANA & MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 i

December 6, 1985 AEP:NRC:0962A Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 RESPONSE TO IE BULLETIN 85-02 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

Inspection and Enforcement Bulletin 85-02 requires that various measures be taken by licensees that have not yet implemented the actuation of the reactor trip breaker shunt trip coil on all automatic reactor trip signals. As indicated in our submittal AEP:NRC:0962, dated-November 6, 1985, we installed the auto shunt trip modification in Donald C. Cook Nuclear Plant Unit 2 following our trip event of October 29, 1985 (that trip event being the subject of IE Bulletin 85-02) and prior to Unit 2 restart. The auto shunt trip modification had already been implemented in Unit 1.

The interim results of our investigation into the cause of the UVTA failures were provided in our submittal AEP:NRC:0962B, dated November 27, 1985. As we stated in that letter, the' final results of that investigation are expected to be available by January 31, 1986.

This document has'been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, 8512170439 851206 PDR ADOCK 05000315 g @s PDR M. P. Alexich G

3 Vice President cm cc John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff g

I NRC Resident Inspector - Bridgman 6h